Northern Ireland Assembly Flax Flower Logo

This publication contains the written answers to questions tabled by Members. The content of the responses is as received at the time from the relevant Minister or representative of the Assembly Commission and has not been subject to the official reporting process or changed in any way.

Friday 22 May 2009

Written Answers to Questions

Office of the First Minister and deputy First Minister
Agriculture and Rural Development
Culture, Arts and Leisure
Education
Employment and Learning
Enterprise, Trade and Investment
Environment
Finance and Personnel
Health, Social Services and Public Safety
Regional Development
Social Development
Northern Ireland Assembly Commission

OFFICE OF THE FIRST MINISTER AND DEPUTY FIRST MINISTER

Forum for Victims and Survivors

Mrs D Kelly asked the Office of the First Minister and deputy First Minister when will the forum for victims and survivors be established.

(AQW 7141/09)

Office of the First Minister and deputy First Minister (Mr P Robinson and Mr M McGuinness):

Under the relevant legislation the Commission for Victims and Survivors has a statutory duty to convene a Forum for Victims and Survivors.

The Commission is currently progressing its work on establishing the Forum.

The Commission is also currently finalising its 2009/2010 workplan which will set out timescales for each stage of this work. Once we have received, considered and approved this plan, the Commission will forward it to the OFMDFM Committee as soon as possible.

Funding for Grammar Schools

Mr J Shannon asked the Office of the First Minister and deputy First Minister whether there has been discussions at the Executive about allowing the Minister of Education to proceed with her intention to unilaterally withdraw funding from Grammar Schools.

(AQW 7606/09)

Office of the First Minister and deputy First Minister:

It is not our practice to disclose details of Executive business. The content of Executive papers and all aspects of Executive business are confidential.

Departmental Land

Dr A McDonnell asked the Office of the First Minister and deputy First Minister if in light of the current economic crisis, and with rising fuel and food prices, it has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7613/09)

Office of the First Minister and deputy First Minister:

Of the four sites owned by OFMDFM (referred to in AQ 7706/09), Magherafelt is currently in the process of being sold to the NEELB and Crumlin Road Gaol and Ebrington will be subject to development in line with their masterplans.

As the Member will be aware we recently announced our intention to establish a Development Corporation to take forward the development of the Maze/Long Kesh site.

Any proposals around the use of land on these sites would therefore need to be considered in the context of the overall development of the sites. We therefore have no plans to release Departmental land for this purpose.

Departmental Land

Dr A McDonnell asked the Office of the First Minister and deputy First Minister when the most recent audit of departmental land was undertaken; and how much unused land the Department currently holds.

(AQW 7706/09)

Office of the First Minister and deputy First Minister:

The Department has an asset register which contains all lands and property owned. These include the four former security sites transferred to us free of charge for social and economic regeneration for the benefit of the whole community.

The former Ebrington Barracks site in Derry/Londonderry (26 acres) is the subject of a detailed masterplan currently under development by Ilex, the urban regeneration company jointly owned by OFMDFM and DSD. A masterplan has also been published for the Crumlin Road Gaol (13 acres). The North Eastern Education and Library Board are in the final stages of purchasing the former army base at Magherafelt (8 acres) for a schools campus.

The only currently unused land at present is the 347 acre site at Maze/Long Kesh. We recognise the potential of this regionally significant and strategically placed site and are committed to exploiting its potential to the full.

Northern Ireland Bureau

Mr S Gardiner asked the Office of the First Minister and deputy First Minister what consideration it has given to extending and enhancing the operation of the NI Bureau in Washington DC.

(AQO 2716/09)

Office of the First Minister and deputy First Minister:

Our Bureau in Washington plays an important role in representing the Executive’s interests in the United States. Over the past few years it has arranged access for us to both President Bush and President Obama and to other senior figures such as Secretary Hillary Clinton and Mayor Bloomberg of New York.

Since 2007 we have extended and enhanced the role of the Bureau. We have ensured that the office has built a closer working relationship with Invest NI to maximise potential in line with the Executive’s priority on economic development. Further closer co-operation is taking place on tourism issues.

In addition, early last year the Bureau strengthened its representation in the United States by the appointment of a member of staff working out of New York. The post-holder is responsible for all activities in the New York Consular District which includes Pennsylvania, New York State and New England.

The Bureau’s role will be reviewed in line with the Executive’s International Strategy which aims to present ourselves internationally with a reputation as a place to invest, trade, visit, study and exchange knowledge. Any proposals for change to the current role of these offices will require the support of the Executive. In the meantime the Bureau continues to look for opportunities to create mutually beneficial links with American organisations and to extend its outreach programme to other parts of the United States.

In addition, the Bureau, in partnership with the Department for Employment and Learning, is to appoint a part-time Tertiary Education and Workforce Development Officer in the US. The post-holder will be based in the Bureau’s Offices in Washington and will significantly enhance the work currently being undertaken by DEL and the Bureau in the US.

Aid for Peace Approach

Mr T Burns asked the Office of the First Minister and deputy First Minister how many of its programmes the 'Aid for Peace Approach' has been applied.

(AQO 2717/09)

Office of the First Minister and deputy First Minister:

We refer the Member to the answer to AQO 2711/09. Our comments then are equally applicable to this question.

Ethnic Minorities

Ms D Purvis asked the Office of the First Minister and deputy First Minister to detail the grounds on which the 27 groups receiving funding to support the integration of minority ethnic communities were selected; and to outline what assessment has been made of the impact of funds spent on race relations, including results of any such assessment, over the last three years.

(AQO 2718/09)

Office of the First Minister and deputy First Minister:

The 27 groups who currently receive funding under the Minority Ethnic Development Fund 2009/10 were selected using published, objective criteria, and chosen by an independent selection committee appointed by officials in OFMDFM.

Each application was assessed in accordance with the specific selection criteria set out in the published application guidance.

These criteria and the fund have been operating successfully for some years now. This year we have increased the amount of money available to the fund by 10% to over £1 million to meet the increasing demand. This is on top of a substantial increase last year following devolution.

The amount of money sought by applicants to this year’s fund totalled over £2 million. Given the high standard of the applications and the fact that there was only £1 million available, this has inevitably resulted in some good quality applications being unsuccessful.

OFMDFM officials assess the impact of the funding allocations through regular progress reports compiled by the funded groups, which detail the work they have been undertaking. We also monitor against a set of good relations indicators.

An external assessment of OFMDFM’s Minority Ethnic Fund in 2003 noted that the fund had been seen as an example of good funding practice.

Given the increase in the minority ethnic population and the consequent demand for funding, OFMDFM officials are currently embarking upon an evaluation of the impact of funds spent on race relations in recent years.

Sustainable Development Strategy

Mr T Elliott asked the Office of the First Minister and deputy First Minister when it will publish a Sustainable Development Strategy.

(AQO 2719/09)

Office of the First Minister and deputy First Minister:

We are continuing to review our draft Sustainable Development Strategy with the objective of producing a new high-level Strategy that will align more effectively with the Executive’s Programme for Government.

We are hopeful that in the near future we will be able to circulate a draft of the new Strategy document to Departments and to the OFMDFM Committee for consideration before beginning a wider public consultation.

Economic Policy and Public Service Directorate

Mrs C Hanna asked the Office of the First Minister and deputy First Minister for an update on the work of the Economic Policy and Public Service Directorate.

(AQO 2720/09)

Office of the First Minister and deputy First Minister:

The Economic Policy and Public Service Directorate was restructured during Direct Rule, with its Public Sector Reform and E-Government functions transferring to DFP. The Economic Policy Unit remains in OFMDFM. This Unit has a broad range of responsibilities. In conjunction with DFP, it consolidates the Executive’s Programme for Government and Budget. It provides advice to Ministers on a range of economic issues, particularly those of a central or cross cutting nature. The Unit has the responsibility, across the NICS, for the development and strengthening of policy capacity and for the implementation of sustainable development. The Unit also has oversight and management of the Integrated Development Fund and the Economic Research Institute of Northern Ireland.

Conflict Transformation Initiative

Mr D Hilditch asked the Office of the First Minister and deputy First Minister for an assessment of its role in the Conflict Transformation Initiative case.

(AQO 2721/09)

Office of the First Minister and deputy First Minister:

The case to which the Member refers was the judicial review of a decision by the Minister for Social Development to withdraw funding from the Conflict Transformation Initiative.

The judgment of the Court was given on 30 April. The Court found that the Minister for Social Development had not acted in accordance with a decision of the Executive and, therefore, not in accordance with the provisions of the Ministerial Code, and contrary to section 28A(1) of the Northern Ireland Act.

Programme for Government

Miss M McIlveen asked the Office of the First Minister and deputy First Minister what arrangements are in place to monitor delivery against the Programme for Government.

(AQO 2722/09)

Office of the First Minister and deputy First Minister:

The Programme for Government is framed under five priority areas which set out a range of key goals and commitments for the Executive collectively to deliver. These are in turn supported by a detailed framework of 23 cross-cutting Public Service Agreements (PSAs) which confirm the key actions and targets departments will take forward over the next three years in support of the Executive’s priorities.

The Executive is determined to deliver on those targets and key goals. In that context, departments have worked together to develop detailed Delivery Agreements for each PSA. These Delivery Agreements set out in more detail how departments intend to ensure delivery of the targets and actions set out in the Programme for Government and provide the basis upon which the Executive will monitor delivery of the Programme for Government.

Performance against PfG goals, commitments and targets will be monitored through departmental returns to OFMDFM/DFP, culminating in the production of consolidated Delivery Reports for the Executive’s consideration, which will draw together progress on delivery against the PfG targets and goals.

Sustainable Development Strategy

Mr L Cree asked the Office of the First Minister and deputy First Minister why a revised Sustainable Development Strategy has not been published to date.

(AQO 2723/09)

Office of the First Minister and deputy First Minister:

We are continuing to consider the content of the draft Sustainable Development Strategy. Following completion of this exercise, we will undertake a phase of consultation prior to publication of the final document.

Programme for Government

Mr S Hamilton asked the Office of the First Minister and deputy First Minister if it intends to meet with Ministerial colleagues individually to discuss their Programme for Government targets.

(AQO 2724/09)

Office of the First Minister and deputy First Minister:

The Programme for Government is framed under five priority areas which set out a range of key goals and commitments for the Executive collectively to deliver. These are in turn supported by a detailed framework of 23 cross-cutting Public Service Agreements (PSAs) which confirm the key actions and targets departments will take forward over the next three years in support of the Executive’s priorities.

The Executive is determined to deliver on those targets and key goals. In that context, departments have worked together to develop detailed Delivery Agreements for each PSA. These Delivery Agreements set out in more detail how departments intend to ensure delivery of the targets and actions set out in the Programme for Government and provide the basis upon which the Executive will monitor delivery of the Programme for Government.

The Executive has established a robust and effective framework to drive delivery of our priorities. This provides for us to meet jointly with Ministerial colleagues as appropriate to discuss performance and will also enable the Executive to collectively review performance.

Anti-Poverty Strategy

Ms A Lo asked the Office of the First Minister and deputy First Minister for an update on progress regarding the development of detailed action plans associated with the anti-poverty strategy.

(AQO 2725/09)

Office of the First Minister and deputy First Minister:

In agreeing, on 20th November 2008, to formally adopt the broad architecture and principles of Lifetime Opportunities as the basis of its strategy to tackle poverty and social exclusion and patterns of deprivation based on social need, the Executive further agreed to the establishment of an Executive Sub-Committee on poverty and social inclusion.

The first meeting of this Executive Sub-Committee took place on Thursday 26th March and we chaired this jointly. At its first meeting, the Sub-Committee:

Following those discussions we have now asked that officials liaise with colleagues in other departments and finalise a list of priority action areas for consideration and agreement at the Executive Sub-Committee’s second meeting, which we intend to convene during May.

At this second meeting the Sub-Committee will also specifically consider proposals in respect of the monitoring and reporting frameworks that will be associated with the Lifetime Opportunities strategy.

Programme for Government

Mr J Spratt asked the Office of the First Minister and deputy First Minister for its assessment of how the Executive is performing against the targets set out in the Programme for Government.

(AQO 2726/09)

Office of the First Minister and deputy First Minister:

The Programme for Government is framed under five priority areas which set out a range of key goals and commitments for the Executive collectively to deliver. These are in turn supported by a detailed framework of 23 cross-cutting Public Service Agreements (PSAs) which confirm the key actions and targets departments will take forward over the next three years in support of the Executive’s priorities.

The Executive is determined to deliver on those targets and key goals. In that context, departments have worked together to develop detailed Delivery Agreements for each PSA. These Delivery Agreements set out in more detail how departments intend to ensure delivery of the targets and actions set out in the Programme for Government and provide the basis upon which the Executive will monitor delivery of the Programme for Government.

The Executive has established a robust and effective framework to drive delivery of our priorities. In line with this, we will be monitoring progress on delivery against PSA targets, goals and commitments. Work has now been initiated to prepare a formal delivery report which we aim to publish before the summer recess.

Efficiency Review Panel

Mr I McCrea asked the Office of the First Minister and deputy First Minister for its assessment of the work of the Efficiency Review Panel.

(AQO 2727/09)

Office of the First Minister and deputy First Minister:

On 9 April 2009, we announced our intention to appoint an Efficiency Review Panel to examine efficiency and value for money of aspects of the Strand One institutions. We hope to put to the Assembly soon proposals for the establishment of the Panel and its remit. The first task of the Panel will be to examine the number and organisation of Departments in the light of the present financial pressures and the implications of the Review of Public Administration, and to ensure that the departmental structure is best organised to deliver public services in an efficient manner. The review will be on the basis of both fairness and efficiency, taking account of the requirement to protect the safeguards which ensure the Executive is representative of the community and can participate and work together successfully in the operation of the institutions. The report of the Panel is expected later this year.

Equality Legislation

Mr A Maskey asked the Office of the First Minister and deputy First Minister, in light of the introduction of an Equality Bill in Westminster, if it will introduce legislation in the Assembly that will meet our particular circumstances.

(AQO 2728/09)

Office of the First Minister and deputy First Minister:

We are aware of the introduction of an Equality Bill at Westminster but no decisions have been taken on the future direction of equality legislation here.

Economy

Mr F Cobain asked the Office of the First Minister and deputy First Minister, further to Junior Minister Donaldson's comments to the Chartered Institute of Management Accountants on 17 April 2009, to detail how public expenditure has been used to provide additional stimulus to local markets and businesses since the onset of the economic downturn.

(AQO 2729/09)

Office of the First Minister and deputy First Minister:

We announced a package of measures to address the economic downturn in the Assembly on 15th December 2008 which included measures to address problems in five key areas: energy and fuel poverty; debt and unemployment; the rising cost of living for households; support for the housing and construction sectors; and support for business. We brought forward a Financial Assistance Bill to allow us to react quickly to emerging problems and difficulties and included within the package around £45m reallocated during the December monitoring round to respond to the downturn.

During the course of last year we met with a series of stakeholder groups to learn directly of the core problems and difficulties arising from the development of the economic downturn. To develop and build upon this dialogue we have established an economic taskforce under the title of the Cross Sector Advisory Forum. In addition, we have met with the four main banks in recent months where we discussed how they were responding to the credit crunch.

We are acutely aware that this is a difficult time for local people and businesses. The Executive is monitoring the economic crisis and we aim to do all that we can to protect local interests from the worst effects of this economic turmoil.

Poverty and Social Inclusion

Mrs N Long asked the Office of the First Minister and deputy First Minister to provide an update on activity in relation to the poverty and social inclusion stakeholder forum.

(AQO 2730/09)

Office of the First Minister and deputy First Minister:

In agreeing, on 20th November 2008, to formally adopt the broad architecture and principles of Lifetime Opportunities as the basis of its strategy to tackle poverty and social exclusion and patterns of deprivation based on social need, the Executive further agreed to the establishment of an Executive Sub-Committee on poverty and social inclusion.

The inaugural meeting of this Executive Sub-Committee took place on Thursday 26th March and it was agreed that the terms of reference and the membership of the Poverty and Social Inclusion Stakeholder forum be on the agenda for the next meeting in May, with the intention of re-establishing this forum very soon.

Department of Agriculture and Rural Development

Rural Businesses

Mr S Neeson asked the Minister of Agriculture and Rural Development what plans she has to increase resources for promoting rural businesses.

(AQO 2440/09)

Minister of Agriculture and Rural Development (Ms M Gildernew): My Department does not retain the statutory responsibility for promoting rural businesses. However under the new Rural Development Programme over £500m will be available to rural businesses from Axis 1, 2 and 3. Of this £40m will through the farm diversification and business support measures help create, develop and grow rural businesses.

Horse Passports

Dr S Farry asked the Minister of Agriculture and Rural Development to detail the Department's responsibilities in relation to the enforcement of the requirements of production of a passport in the buying and selling of horses; and the distinction between the Departments responsibilities and those of the Police Service of Northern Ireland.

(AQW 7457/09)

Minister of Agriculture and Rural Development: The current horse passport is a measure to protect the human food chain from contaminated horse meat. My Department meets its responsibilities to protect the food chain by enforcing the requirements at point of slaughter and import/export. When evidence of other passport offences is brought to my Department’s attention, this is considered and investigated, as appropriate.

The PSNI are responsible for investigating possible welfare issues as defined in the Welfare of Animals Act (NI) 1972.

Senior Civil Servant Bonuses

Mr P McGlone asked the Minister of Agriculture and Rural Development how much was paid in bonuses to senior Civil Servants in her Department in (i) 2003/04; (ii) 2004/05; (iii) 2005/06; (iv) 2006/07; and (v) 2007/08.

(AQW 7520/09)

Minister of Agriculture and Rural Development:

Year Total Amount Paid
2003/04 £60,000
2004/05 £60,500
2005/06 £69,000
2006/07 £82,500
2007/08 £107,000

There is widespread public anger at the large bonuses being paid to public servants who are already in receipt of substantial incomes. As Minister, I share this concern and want a review to be undertaken on this matter.

Bovine Tuberculosis

Mr P Weir asked the Minister of Agriculture and Rural Development how many cases of tuberculosis have been confirmed in each month in the last three years, in the North Down constituency.

(AQW 7543/09)

Minister of Agriculture and Rural Development: The number of confirmed cases of bovine tuberculosis by month.

Year

Month

Cases

2006

3

1

2006

5

1

2006

8

1

2006

9

1

2006

10

1

2006

11

2

2006

12

2

2007

1

3

2007

3

1

2007

4

1

2007

5

1

2007

9

1

2007

12

1

2008

1

1

2008

2

2

2008

3

2

2008

8

2

2008

11

1

This represents cases that have been detected in the Newtownards Division, either at an official Tuberculosis test or by lesions detected during meat inspection in abattoirs, and had the disease confirmed by culture of the causal organism in the AFBI Laboratory.

Months with no confirmed cases have been omitted from the table.

Comprehensive information on the incidence of both bovine tuberculosis and brucellosis can be found on the DARD website at http://www.dardni.gov.uk/index/dard-statistics/animal-disease-statistics.htm . This site gives information for herds and animals in the north of Ireland and in addition gives a break down by month and by Divisional Office region.

Departmental Land

Dr A McDonnell asked the Minister of Agriculture and Rural Development if in light of the current economic crisis, and with rising fuel and food prices, she has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7615/09)

Minister of Agriculture and Rural Development: All agricultural land currently at the disposal of my Department is fully utilised (for example, for research, education and technology transfer purposes). Relinquishing this land would lead either to the ending of this important work, or the need to rent alternative land, thus displacing existing agricultural activities carried out by farmers.  Therefore, I have no plans to release Departmental lands. You may wish to note, however, that the Allotments Act (NI) 1932, as amended, gives local Councils the power to provide, at their discretion, allotments for use by residents in their areas.

This provides a ready means to respond to the specific demands of local communities.

Tree Planting and Hedgerow Replacement

Mr J Shannon asked the Minister of Agriculture and Rural Development how many applications have there been for grants for tree planting and hedgerow replacement, per constituency, in each of the last 3 years.

(AQW 7634/09)

Minister of Agriculture and Rural Development: The following table indicates the number of participants in agri-environment (AE) schemes who received payments, as part of their agreements, for tree planting and hedgerow restoration. Data regarding funding available through AE Schemes is not available by constituency, therefore I have provided it by county. AE Schemes include the Countryside Management Scheme (CMS) and the Environmentally Sensitive Areas (ESA) Scheme.

Field Boundary Restoration (FBR) includes hedge planting, hedge coppicing and interplanting, and hedge laying. It is not possible to present separate statistics for hedge planting/hedge coppicing and interplanting.

Number of participants in agri-environment schemes who applied to undertake field boundary management works and tree planting

 

Antrim Armagh Down Fermanagh Derry/ Londonderry Tyrone
AE SchemeTree Planting

 

 

 

 

 

 

2006 233 134 216 77 259 270
2007 12 2 17 15 13 9
2008 0 0 0 0 0 0
AE Scheme FBR            
2006 1552 799 911 583 1249 1659
2007 1299 696 767 445 1115 1362
2008 1153 618 677 366 1024 1214
Enhancement hedge planting            
2006 30 56 62 33 46 177
2007 19 50 48 37 0 115
2008 8 19 24 19 11 64
Annual Totals Antrim Armagh Down Fermanagh Derry/ Londonderry Tyrone
2006 1815 989 1189 693 1554 2106
2007 1330 748 832 497 1128 1486
2008 1161 637 701 385 1035 1278
Grand Total 4306 2374 2722 1575 3717 4870

The following table details number of applicants broken down by constituency who applied for tree planting to the Woodland Grant Scheme/Farm Woodland Premium Scheme and the Short Rotation Coppice Scheme 2007. The figures relate to applications for which approval has been granted and planting has been carried out.

Number of applicants who applied to tree planting schemes delivered by Forest Service

Constituency Year No. of applications
East Antrim 2006
2007
2008
3
1
0
    Total 4
East Derry/Londonderry 2006
2007
2008
9
4
21
    Total 34
Foyle 2006
2007
2008
4
8
3
    Total 15
Lagan Valley 2006
2007
2008
12
18
8
    Total 38
Mid Ulster 2006
2007
2008
27
16
11
    Total 54
Newry and Mourne 2006
2007
2008
40
27
12
    Total 79
North Antrim 2006
2007
2008
19
11
3
    Total 33
North Belfast 2006
2007
2008
1
0
0
    Total 1
North Down 2006
2007
2008
1
1
0
    Total 2
South Antrim 2006
2007
2008
30
9
7
    Total 46
South Down 2006
2007
2008
32
10
4
    Total 46
South Tyrone & Fermanagh 2006
2007
2008
42
48
35
    Total 125
Strangford 2006
2007
2008
6
11
6
    Total 23
Upper Bann 2006
2007
2008
16
13
4
    Total 33
West Tyrone 2006
2007
2008
57
15
22
    Total 94

Tree Planting and Hedgerow Replacement

Mr J Shannon asked the Minister of Agriculture and Rural Development what financial assistance and grants have been made available for tree planting and hedgerow replacement.

(AQW 7636/09)

Minister of Agriculture and Rural Development: The following grants and financial assistance have been made available since 2000:

  1. Funding for Field Boundary Restoration was available under the Rural Development Programme (RDP) 2000 – 2006 through options in the Countryside Management Scheme (CMS) and Environmentally Sensitive Areas (ESA) Scheme. Under the current RDP 2007 – 2013, the new Countryside Management Scheme (NICMS) offers similar funding. Field boundary restoration includes hedge planting, hedge coppicing, interplanting, and hedge laying.
  2. These schemes also include options which provide funding for tree planting on areas which are 0.2hectares or less.
  3. Participants in the CMS and ESA Scheme have also received assistance for hedge planting under capital grant enhancement plan measures.
  4. The Woodland Grant Scheme/ Farm Woodland Premium Scheme offers a capital payment which contributes towards the cost of establishing new woodland on a minimum area of 0.2 hectares.
  5. The Short Rotation Coppice Scheme 2007 aids the establishment and management of short rotation coppice willow for the purposes of producing woodchip to be used a renewable energy fuel.

Cull of Badgers

Mr J Shannon asked the Minister of Agriculture and Rural Development if she will consider a cull of badgers due to tuberculosis, similar to that initiated by the Welsh Assembly.

(AQW 7693/09)

Minister of Agriculture and Rural Development: In March, the Welsh Rural Affairs Minister announced the intention to carry out a badger cull, alongside additional cattle measures, within an Intensive Pilot Area in Wales.

Last December, I announced the new strategic approach for how we deal with TB in the North, including the issue of badgers. This is an agreed joint industry/Government approach, based on addressing three key strands together – real partnership between government and industry, controlling the spread of TB between cattle, and addressing the wildlife factor. To enable us to deal with TB comprehensively and conclusively we need to be able to deal effectively with all the risk factors.

In respect of badgers, the key question we are seeking to address is whether a badger intervention strategy would help to achieve a cost-effective reduction in TB incidence in cattle in the North.

I intend to pursue the actions and research needed to fill the key gaps in our scientific knowledge and build the evidence to inform what we do to deal effectively with the wildlife factor.

We are planning a number of actions which will help to generate the necessary evidence. These include a study of the prevalence and distribution of TB in badgers across the North, and a case control study in both TB infected and clear herds in a TB high incidence area. We are also developing plans for a badger removal trial. In addition, we will continue to explore how best we can contribute to the development of a vaccine for badgers. These actions will be subject to the agreement of the Environment Minister where necessary, and to bids for the additional funding that will be needed.

I will review the evidence these actions produce to inform my decision about what we do to reduce the transmission of TB between wildlife and cattle.

Our strategy recognises that eradicating TB is not just about tackling the wildlife aspect. Measures to deal with cattle to cattle transmission of TB will also continue to be an important element of the strategy as we move forward.

Departmental Land

Dr A McDonnell asked the Minister of Agriculture and Rural Development when the most recent audit of departmental land was undertaken; and how much unused land the Department currently holds.

(AQW 7707/09)

Minister of Agriculture and Rural Development: The NI Audit Office carries out an audit each year on the Department’s Interim Accounts as at 31 December and end of year Resource Accounts as at 31 March. As part of these audits, all land asset information is available for examination. The last audited accounts are those dated 31 March 2009.

The Department carries out verification exercises each September, December and March to confirm the accuracy of data that is held on the fixed asset register. This exercise requires business areas to review the list of assets, including land, and to provide assurance that the details are correct or of amendments to be made.

As part of these exercises business areas are also asked to provide details of assets declared as ‘Surplus to Requirement’. The current information being used in preparation of 2008/09 Resource Accounts is that a total of 143.29 hectares of land has been declared as surplus.

Equine Council for Northern Ireland

Mr D Simpson asked the Minister of Agriculture and Rural Development the reasons why a financial award was made to the non-constituted body, the Equine Council for Northern Ireland; and (ii) the amount of the award.

(AQW 7726/09)

Minister of Agriculture and Rural Development: My Department has not made any payments to the Equine Council for NI (ECNI).

Rural Development Programme

Mr B McElduff asked the Minister of Agriculture and Rural Development to detail when the funding in Axis three of the Rural Development Programme will be open for applications and what local councils are doing to ensure that farmers and rural dwellers are aware of how and when to apply.

(AQO 2739/09)

Minister of Agriculture and Rural Development:

I am pleased to report that four areas SWARD, GROW, LAGAN and the North East have now opened for full applications and indeed 639 applications have been submitted to the Axis 3 measures. All areas have been receiving expressions of interest and to date over 1,000 have been lodged with the administration units. The full applications are being processed and eligibility checks and site visits are under way. The first assessment panels are due to be held in June. There has been a significant publicity campaign lead by my Department and supplemented by Joint Council Committee public events to publicise the programme with numerous events across the North.

The full contract for delivery is currently being examined by Joint Council Committee legal representatives, officials are still aiming to have contracts signed in June. Detailed implementation plans have been received from all seven Joint Council Committees and Local Action Groups. Officials have now carried out a detailed review of these and are liaising with lead administration units to work towards these being signed off. A full set of operating rules has now been made public these have under gone a significant review by officials to make them as user friendly as possible. My officials have established strong links to other government Departments and Agencies to ensure that all programmes maximise the assistance available to applicants on the ground and to ensure complimentarity between programmes.

Bank Payments

Mrs D Kelly asked the Minister of Agriculture and Rural Development in relation to the significant changes in the lending and overdraft policies of the Banks, if she will consider a return to the era when farmers had the option of using the BACS system or receiving their cheques directly.

(AQO 2741/09)

Minister of Agriculture and Rural Development:

Unfortunately it is no longer possible to give farmers the option of how they receive their EC subsidy payments. From 16 October 2008 EU regulations made it mandatory for all paying agencies to issue EC subsidy payments by BACS. For those farm businesses who do not have a UK bank account I have made arrangements for their subsidy payments to be made to a credit union of their choice provided it operates a UK bank account.

Rural White Paper

Mrs C McGill asked the Minister of Agriculture and Rural Development what progress has been made with the Rural White Paper and how the improved rural proofing process and rural champion concepts are being developed in the interim.

(AQO 2742/09)

Minister of Agriculture and Rural Development:

My Department has developed proposals for a thematic approach to the development of the Rural White Paper and has established five stakeholder sub-groups to take forward the work. The five themes – Rural Vision, Rural Governance, Rural Services, Rural Places and Rural People – have been developed on the basis of the main issues identified by rural stakeholders and has been discussed with other Departments and my Assembly Committee.

Following several preparatory meetings the sub-groups are now beginning their work reporting back to the Department in the Autumn. It is proposed that other Departments with responsibility for issues affecting rural areas will begin formally engaging with stakeholders as part of sub-group work. On completion the stakeholder reports will be formally considered by DARD together with the other Departments. The Department is also looking at issues relating to the evidence and research required to underpin and inform the Rural White Paper.

The public consultation on the Rural Champion concept and enhanced rural proofing has reinforced the collaborative approach suggested. My officials are currently finalising proposals to deliver both an enhanced rural proofing process and a rural champion framework which will allow for better integration across government and with rural stakeholders. When I have agreed a final proposal which meets the best interests of rural communities I will bring my proposals to the Agriculture and Rural Development Committee – in the coming weeks - and then to the Executive.

Less Favoured Areas

Mr P Ramsey asked the Minister of Agriculture and Rural Development if she will consider extending the consultation period on the possible changes to the Less Favoured Areas.

(AQO 2743/09)

Minister of Agriculture and Rural Development:

I have received no representations from stakeholders to extend the consultation period. If an approach is made, an extension will be considered.

Dioxin Contamination

Mrs C Hanna asked the Minister of Agriculture and Rural Development if she could confirm that the investigation by the PSNI into the feedstuffs contaminated by Dioxins issue remains ongoing, and to update the Assembly, as far as possible, on the latest feed-back that she has had from the investigating team.

(AQO 2744/09)

Minister of Agriculture and Rural Development:

Following initial involvement by the PSNI the case has been passed to the Environmental Crime Unit of the NIEA, the competent authority in NI, to lead on. No further detail can be given at this time as the investigation is still ongoing.

Farm Modernisation Programme

Mr D Bradley asked the Minister of Agriculture and Rural Development if she has identified any legal risks that will, or may arise, as a result of her decision to deal with applications to the Farm Modernisation Programme on a first come first served basis.

(AQO 2745/09)

Minister of Agriculture and Rural Development:

Following the intervention of the European Commission on 17 February, my Department sought advice from the Departmental Solicitor’s Office on the scheme’s compliance with EU rules. This advice confirms that my Department has acted reasonably in its implementation of the EU rules. Correspondence from the European Commission also confirms that it is not for them to approve selection criteria for the scheme.

Taxation: Conacre System

Mr T Burns asked the Minister of Agriculture and Rural Development if she has met with senior Treasury officials to discuss the future tax implications for land owners who rent their agricultural lands by the conacre method of agreement.

(AQO 2746/09)

Minister of Agriculture and Rural Development:

The issue of taxation is not devolved to the Assembly as it is an Excepted Matter for determination by the British Treasury. It is therefore for the Minister of Finance and Personnel (Mr. Nigel Dodds) to make representations to the British Treasury.

Nevertheless the implications of the recent judgement of the Court of Appeal cause me considerable concern especially in relation to land let in conacre by landowners which may have development potential. Therefore I have written to the Minister of Financial and Personnel outlining my concerns and asking that he pursue the matter with Treasury.

I would refer you to the fact that the Minister of Finance and Personnel had already written to and recently met with the Chief Secretary to the Treasury (Ms. Yvette Copper) about this matter and that a further meeting is planned.

Dioxin Contamination

Mr R Beggs asked the Minister of Agriculture and Rural Development if she has ceased her attempts to attain compensation from the Republic of Ireland authorities in respect of the recent Dioxin contamination, which affected a number of farms and farmers in Northern Ireland.

(AQO 2749/09)

Minister of Agriculture and Rural Development:

I together with the First and deputy First Ministers and the Minister for Enterprise, Trade and Investment sought access for North’s farmers and processors to the South’s financial assistance arrangements.

On 28 January 2009, DAFF Minister Brendan Smith, confirmed that due to legal and financial constraints, the South could not provide financial assistance to producers and processors here. Once this was established we moved quickly to secure the Executive’s agreement for necessary budget allocation and to submit an application for an Exceptional Support Measure, through DEFRA, to the EU Commission.

This does not preclude legal action by individuals affected by this incident.

Countryside Management Scheme

Mr F Brolly asked the Minister of Agriculture and Rural Development (i) what progress has been made with the Countryside Management Scheme; and (ii) have there been any improvements in delivery.

(AQO 2750/09)

Minister of Agriculture and Rural Development:

Applications from the first tranche (in 2008) of the new Countryside Management Scheme (NICMS) were prioritised on the basis of land designations and 1,300 received farm visits. Around 1,000 of these have entered the Scheme.

There was an innovative approach in administrating Scheme applications in 2008 using a computerised process which allowed a paperless application. The on-going development of this process will lead to continued improvements for future applications. Another measure to reduce bureaucracy and improve customer service has been taken. Farmers who applied in 2008, but did not progress to the farm visit stage, will have their application automatically resubmitted. This means they will not need to re-apply during the next application period.

Department of Culture, Arts and Leisure

Regional and Minority Languages

Mr D Simpson asked the Minister of Culture, Arts and Leisure at what stage is Northern Ireland's input into the UK's 3rd Periodical Report on Regional and Minority Languages.

(AQO 2755/09)

Minister of Culture, Arts and Leisure (Mr G Campbell):

The Northern Ireland input to the UK’s 3rd Periodical Report on Regional or Minority Languages had not yet been agreed. It is still being considered by the Deputy First Minister and the input cannot proceed to an Executive Meeting until agreement is in place.

The Foreign and Commonwealth Office plan to issue the UK report in the coming weeks including the Northern Ireland Office input in relation to Irish and Ulster-Scots but without the Northern Ireland Executive input.

I will continue to seek to progress this with a view to securing agreement as soon as possible.

Public Record Office

Mr F Cobain asked the Minister of Culture, Arts and Leisure for an update on the new site for the Public Record Office.

(AQO 2758/09)

Minister of Culture, Arts and Leisure:

The construction phase of the new Public Record Office for Northern Ireland, which will be located in the Titanic Quarter, Belfast, commenced on 24 November 2008.

The construction programme is on schedule for completion in Autumn 2010 and it is estimated that the building, which will provide state of the art, larger and better facilities for accessing PRONI’s records, will open to the public early in 2011.

North West 200

Rev Dr R Coulter asked the Minister of Culture, Arts and Leisure what plans he has to increase his Department's 3 year investment of £175,000 in the North West 200 event.

(AQO 2759/09)

Minister of Culture, Arts and Leisure:

I am pleased to advise that the organisers of the North West 200 have made a successful application for a further funding of £45,000 in 2009/10 to the Events Growth Fund to support the introduction of two campaigns which were be "rolled out" during race week. The "Stay a While" campaign received £30,000 whilst the "We Want You" campaign received £15,000.

"Stay a While" will entice visitors to extend their visit to Northern Ireland. It highlights some of the world class tourist attractions and facilities we have to offer and will ensure that the economic impact of this international event is spread throughout Northern Ireland.

The "We Want You" at the North West 200 is focused on the recruitment of volunteers. It highlights the wide range of opportunities involvement in the event offers and will be key in ensuring the events continued success. This campaign will also enable Northern Ireland to develop a pool of experienced volunteers, qualified in all aspects of event management and this will support efforts to attract other major events to Northern Ireland.

Organisers of the North West 200 have submitted a business case to Sport Northern Ireland for funding towards resurfacing work at the Paddock area of the course. Up to £100,000 funding has been approved and work was completed on 8 May.

This represents a significant level of funding to the North West 200 from my Department of over £300,000 in recognition of the importance that this event brings to Northern Ireland annually and to road racing world wide.

Tourism: Inland Fisheries

Mr T Elliott asked the Minister of Culture, Arts and Leisure what discussions he has had with the relevant bodies on the promotion of inland fisheries as a tourist attraction.

(AQO 2760/09)

Minister of Culture, Arts and Leisure:

The Department promotes inland fisheries as a tourist attraction through the DCAL angling website www.dcal-fishingni.gov.uk and various other activities such as attending overseas angling shows and publishing guides which highlight what Northern Ireland’s inland fisheries have to offer to local and visiting tourists.

DCAL works with Tourism Ireland to promote angling in Northern Ireland internationally and have arranged to attend a number of angling shows with Tourism Ireland’s support in the next twelve months.

Public Appointments

Mr G Robinson asked the Minister of Culture, Arts and Leisure for his assessment of the importance of a wide geographical spread of appointments to publicly funded bodies.

(AQO 2761/09)

Minister of Culture, Arts and Leisure:

The principles of equal opportunity and diversity underpin Ministerial appointments to publicly funded bodies. Accordingly my Department conducts all public appointment processes in line with guidance as set out by the Commissioner for public appointments. This guidance offers Departments direction in ensuring a quality outcome to appointment competitions, and furthermore a process which commands public confidence.

The overarching principle of the public appointment process is that selection is based on merit. I am committed to achieving a greater geographical spread amongst public appointees provided that all action is consistent with the merit principle

Shared Future: Sport

Mrs D Kelly asked the Minister of Culture, Arts and Leisure to detail his plans for the integration of people through sport, in light of the decision not to go ahead with sports stadium at the Maze, in terms of providing a Shared Future; and how he proposes to ensure a high level of co-operation and co-ordination between the three sporting codes.

(AQO 2762/09)

Minister of Culture, Arts and Leisure: The Department of Culture, Arts and Leisure, in partnership with Sport Northern Ireland (SNI) has recently developed a new 10 year Strategy for Sport and Physical Recreation for Northern Ireland. This Strategy recognises that sport can make a significant contribution to local communities and promoting good relations. It proposes that Government should commit to promoting community cohesion through sport and contains a number of targets and actions to help achieve this. These include targets and actions to encourage under-represented groups to participate in sport and the provision of shared spaces for sport that promote community integration.

I am also currently discussing regional stadia requirements for football, rugby and Gaelic games with the respective Governing Bodies. The Governing Bodies already have well-developed strategies and mechanisms to bring reconciliation and community cohesion benefits to their individual sports and I will be encouraging them to avail of any opportunities which may present themselves to further promote the concept of a 'shared future'.

Ulster-Scots Culture and Heritage

Mr S Moutray asked the Minister of Culture, Arts and Leisure what his Department and its arms length bodies are doing to support the development of the Ulster/Scots culture and heritage within the community.

(AQO 2763/09)

Minister of Culture, Arts and Leisure:

My Department and its arms length bodies are involved in a number of projects relating to the development of Ulster-Scots culture and heritage in the community.

DCAL provides funding to the work of the Ulster-Scots Agency whose Development Officers are working with Ulster-Scots communities to enhance, develop and maintain Ulster-Scots culture and heritage. The Agency received £2.5m from my Department in 2008. The Ulster-Scots Agency has recently reviewed its Financial Assistance Scheme and included in the revision is a proposal to fund community support officers.

DCAL funding for arts is disbursed by the Arts Council of Northern Ireland and the Northern Ireland Screen Commission. The Arts Council has funded, and continues to fund, a range of programmes which support the development of Ulster-Scots culture and heritage within the community. It has provided a total of £1.458m in funding to Ulster-Scots related projects since 2005, and has in place a Language Arts Policy through which it aims to support the sector and encourage growth.

National Museums has a statutory role to promote the awareness, appreciation and understanding by the public of art, history and science, the culture and way of life of people, and the migration and settlement of people with particular regard to Northern Ireland.

Indigenous Languages

Mr D Bradley asked the Minister of Culture, Arts and Leisure for an update on the development of a strategy for indigenous languages.

(AQO 2765/09)

Minister of Culture, Arts and Leisure:

I am considering a number of issues surrounding the protection, enhancement and development of Ulster-Scots and Irish and I intend to present an initial paper to the Executive Committee on this matter in the near future.

Obesity

Mrs M O'Neill asked the Minister of Culture, Arts and Leisure to detail the efforts of Sport NI in helping to tackle obesity.

(AQO 2766/09)

Minister of Culture, Arts and Leisure:

The Department of Health, Social Services and Public Safety (DHSSPS) has lead responsibility for tackling obesity in Northern Ireland. Sport Northern Ireland (SNI) is responsible for the development of sport and physical recreation in Northern Ireland including the distribution of funding. Over the past few years DCAL, in partnership with SNI, has been developing a new 10 year Strategy for Sport and Physical Recreation for Northern Ireland. Work on the Strategy has uncovered evidence that regular and sustained participation in sport, as a form of physical activity, can make a significant contribution to reducing incidences of obesity. On this basis, SNI agreed to join DHSSPS’s Obesity Prevention Steering Group which was set up in 2008 to provide advice and strategic direction on all relevant issues relating to obesity. SNI also chairs the Obesity Prevention Steering Group’s Promoting Physical Activity Advisory Group. Both these groups are working towards the development of an Obesity Prevention Strategic Framework which is due to be published in the summer of 2010.

In addition, SNI has developed a number of sports programmes the purpose of which is to encourage increased participation in sport and physical activity across the population. These include Active8, Places For Sport: Surfaces and a proposed Active Communities programme.

Elite Facilities

Mr P Ramsey asked the Minister of Culture, Arts and Leisure to detail how much money is expected to be spent on Elite Facilities, in this financial year.

(AQO 2767/09)

Minister of Culture, Arts and Leisure:

Sport NI has indicated a current profiled spend on Elite Facilities of c£3.8m in this financial year. This is included in the current total profiled spend on Elite Facilities for the remainder of the present CSR period of c£13.2m.

Irish Language

Mr F Brolly asked the Minister of Culture, Arts and Leisure for an update on his Department's strategy to promote and enhance the Irish Language.

(AQO 2768/09)

Minister of Culture, Arts and Leisure:

I am considering a number of issues surrounding the protection, enhancement and development of Ulster-Scots and Irish and I intend to present an initial paper to the Executive Committee on this matter in the near future.

Sports Grounds

Mr B McElduff asked the Minister of Culture, Arts and Leisure to detail the process and timeline for dealing with the strategic requirements of the GAA, IRFU and IFA to develop stadia.

(AQO 2769/09)

Minister of Culture, Arts and Leisure: As you will be aware I asked the three governing bodies of the

Sports involved to bring forward preferred alternatives on stadium

provision. All three have now responded with their options and a process

for examining these has been determined, the key stages of which are:

I would expect this work to be completed by the Autumn, including consideration of economic appraisals by DFP. The proposals will be subject to the normal statutory processes, including planning and ultimately Executive consideration of the budgetary implications will be required.

Ulster Orchestra

Dr S Farry asked the Minister of Culture, Arts and Leisure for his assessment of funding for the Ulster Orchestra.

(AQO 2770/09)

Minister of Culture, Arts and Leisure:

The Department of Culture, Arts and Leisure does not fund the Ulster Orchestra directly as DCAL funding for the arts is disbursed by the Arts Council of Northern Ireland.

The Ulster Orchestra plays a very significant role in the cultural life of Northern Ireland. It is the only professional concert orchestra in Northern Ireland and its educational and outreach activities are at the very core of music provision in the region.

The Ulster Orchestra also provides a stable source of income for its 63 musicians and a platform to develop their professional skills.

I understand that a 2005 study produced by Millward Brown Ulster, in conjunction with Amethyst Business Solutions, concluded that the provision of public subsidy to the Ulster Orchestra is both socially and economically effective. The study found that the Orchestra has a positive impact on the NI economy by generating income for local businesses and direct spend. The study also highlighted that the Northern Ireland public is supportive of the principle of the Ulster Orchestra’s existence and its activities.

I am aware that the Ulster Orchestra has indicated that it will face a more difficult funding environment in 2009/10 as a result of the economic downturn. I understand that this is largely due to an anticipated reduction in the amounts of private sponsorship and donations.

The Orchestra’s funders include the Arts Council, BBC NI and Belfast City Council. Income is also derived from box office receipts, regional concerts, sponsorship, donations, lottery grants, programme sales and advertising.

I am pleased to confirm that the Arts Council, as the main funder, has provided substantial support to the Ulster Orchestra. The Arts Council awarded over £2m to the Orchestra in 2009/10, more than 50% of its income.

The Arts Council’s ongoing support of the Ulster Orchestra will enable the Orchestra to continue to provide a highly valued service to the people of Northern Ireland and beyond.

Department of Education

Teacher Retirement

Mr D Bradley asked the Minister of Education in relation to the Consultation on draft Teachers' (Compensation for Redundancy and Premature Retirement) Regulations (NI) 2009 and complementing amendments to the Teachers' Superannuation Regulations (NI) 1998;

(i) when the Section 75 screening process was commenced;
(ii) the method of consultation and where it was advertised;
(iii) how many organisations were contacted as part of the statutory screening process and how many responses were received and where these responses can be viewed;
(iv) if the recognised teachers unions and other stakeholders were offered an opportunity to be part of the consultation;
(v) who took the decision to screen out the policy, the date the decision was taken and the basis for it;
(vi) if the Minister was informed of the initiation of the Section 75 consultation and the outcome;
(vii) if the Minister approved the screening decision and if so, when; and
(viii) whether the Department deviated from its own equality scheme.

(AQW 7455/09)

Minister of Education (Ms C Ruane ): (i) Cuireadh tús leis an phróiseas scagtha Ailt 75 ar 28 Eanáir 2009. Rinneadh próiseas scagtha sa bhliain 2008 fosta i ndáil leis an chinneadh lena chinntiú go raibh fostóirí indlite na costais pinsin a bhain le bronnadh creidiúna seirbhíse breise ("blianta breise") a íoc.

(i) The Section 75 screening process was commenced on 28 January 2009. A screening process was also undertaken in 2008 in relation to the decision to make employers liable for the pension costs associated with the award of additional service credit ("added years").
(ii) Consultees were notified of the consultation by email or by post. The consultation documents, including the screening template, were placed on the Department’s website prior to the start of the consultation, which was advertised in the Belfast Telegraph, the Irish News, the Newsletter and Foinse.
(iii) Details of the consultation were sent to approximately 1,565 organisations/individuals. As at 11 May 2009, there were 35 responses, including two making no comment. At the end of the consultation period, i.e. 15 May 2009, all responses will be analysed and a summary of the responses will be published on the Department’s website as soon as is practicable.
(iv) The Teachers’ Superannuation Consultative Committee is the established forum for consultation with the teacher unions on matters relating to the Teachers’ Pensions Scheme. Members of the Committee were first made aware in February 2006 that action was required to control the escalating costs of the Premature Retirement Compensation Scheme (PRCS); and PRCS has been included on the agenda and discussed at all meetings of the Committee held since June 2006. In addition, a PRCS Working Group was established as a sub-group of the Committee and has met on five occasions since February 2008.
(v) The decision to screen out the policy was taken on 28 January 2009 by the Head of Teacher Negotiating & Pensions Policy Branch and agreed by the Equality Guidance and Co-ordination Unit. In over a year of consultation to date the Department has received no evidence of an adverse differential impact on Section 75 groups from any of the key stakeholders, nor any alternative that would promote good relations between persons of different religious belief, political opinion or racial group. In April 2008 a screening process was undertaken in relation to the decision to make employers liable for the pension costs associated with the award of additional service credit ("added years"). The Screening Template was placed on the Department’s website and comments invited from stakeholders, including representatives of Section 75 groups. None was received.
(vi) I have been fully informed of the policy development process and the Equality Screening for the draft Regulations. The responses to consultation are currently being analysed and the outcome will not be known until the analysis is completed. I will decide if a full Equality Impact Assessment is required on the basis of evidence provided by consultees of any material adverse impact on Section 75 groups.
(vii) I agreed on 12 March 2009 that the policy and screening should be published for consultation.
(viii) The Department has not deviated from its own Equality Scheme. The Department’s Equality Scheme gives a commitment that policies will be subject to consideration of a number of criteria. These criteria were addressed in the equality screening of the policy and both the policy and the screening were subject to public consultation which closed on 15 May 2009.

Senior Civil Servant Bonuses

Mr P McGlone asked the Minister of Education how much was paid in bonuses to senior Civil Servants in her Department in (i) 2003/04; (ii) 2004/05; (iii) 2005/06; (iv) 2006/07; and (v) 2007/08.

(AQW 7518/09)

Minister of Education:

Sonraítear thíos méideanna na mbónas feidhmíochta a íocadh le státseirbhísigh shinsearacha:

Performance bonuses paid to senior civil servants are detailed below:

2003/04

£40,000

2004/05

£52,000

2005/06

£77,500

2006/07

£94,000

2007/08

£106,000

There is widespread public anger at the large bonuses being paid to public servants who are already in receipt of substantial incomes. As Minister I share this concern and want a review to be undertaken on the matter.

Nursery Schools

Mr D Hilditch asked the Minister of Education how many children were refused admission to a nursery school or nursery unit in the North Eastern Education Library Board for September 2009.

(AQW 7556/09)

Minister of Education:

The North Eastern Education and Library Board have advised the Department that 501 children seeking a place in a nursery school or nursery unit in the North Eastern Education and Library Board area for September 2009 were unplaced when the admission processes ended on 1 May 2009. 102 of these children are in their final pre-school year.

Thug Bord Oideachais agus Leabharlainne an Oirthuaiscirt le fios don Roinn nuair a cuireadh na próisis iontrála i gcrích ar 1 Bealtaine 2009 nach raibh áit faighte ag 501 páiste a bhí ar lorg áit naíscoile nó áit in aonad naíscoile i limistéar Bhord Oideachais agus Leabharlainne an Oirthuaiscirt do mhí Mheán Fómhair. Tá 109 páiste as an líon sin sa bhliain réamhscoile dheireanach.

Classroom Assistants

Mr C Boylan asked the Minister of Education to provide figures for the cost, for each of the last three financial years, of classroom assistants employed to support children and young people in receipt of statements of educational need, broken down by (i) school; (ii) sector; and (iii) type, in the Belfast Education and Library Board area.

(AQW 7581/09)

Minister of Education:

The first principle of the Data Protection Act 1998 prohibits the disclosure of personal information relating to an individual. As an analysis of these costs, if provided in the format requested, could possibly identify an individual’s salary the costs involved can only be provided by sector.

Dá réir sin, tá curtha in iúl ag Príomhfheidhmeannach Bhord Oideachais agus Leabharlainne Bhéal Feirste gur mar seo a leanas atá costas na gcúntóirí ranga atá fostaithe le tacaíocht a thabhairt do pháistí agus do dhaoine óga a bhfuil ráitis ar riachtanas oideachais acu, do gach bliain le trí bliana airgeadais anuas:-

Accordingly the Chief Executive of the Belfast Education and Library Board has advised that the cost, for each of the last three financial years, of classroom assistants employed to support children and young people in receipt of statements of educational need is as follows:-

  SPEND
Type Yr 1
2006-2007
Yr 2
2007-2008
Yr 3
2008-2009
Maintained Nursery £89,562 £93,659 £58,934
Controlled Nursery £102,887 £147,381 £51,043
Maintained Primary £1,430,714 £1,865,016 £2,359,255
Controlled Primary £1,007,424 £1,472,048 £1,768,657
Maintained Post Primary £654,247 £871,088 £1,125,026
ControlledPost Primary £189,099 £312,456 £439,540
Controlled Grammar £751,159 £124,057 £155,980
Special £4,146,284 £4,571,424 £7,444,687

Specialised Teaching

Mr C Boylan asked the Minister of Education to provide figures for the cost, for each of the last three financial years, of specialised teaching to support children and young people in receipt of statements of educational need, broken down by (i) school; (ii) sector; and (iii) type, in the Belfast Education and Library Board area.

(AQW 7582/09)

Minister of Education:

Tá curtha in iúl ag Príomhfheidhmeannach Bhord Oideachais agus Leabharlainne Bhéal Feirste nach féidir na costais seo a mhiondealú de réir scoileanna aonair, as siocair go soláthraíonn an Bord tacaíocht shainmhúinteoireachta thar réimse na seirbhísí atá sonraithe sa tábla thíos.

The Chief Executive of the Belfast Education and Library Board has advised that as the Board provides specialist teaching support over the range of services identified in the table below it is not possible, therefore, to break these costs down by individual school.

The table below provides the specialist teaching by service to support children and young people in receipt of statements of educational need and the school sectors which are supported. Specialist teaching refers to any additional teaching support over and above that which may already be provided by the teacher in situ.

Sectors supported SPEND
Area of Need Nursery Primary Post Prim Grammar Special Yr 1 Yr 2 Yr 3

2006-2007 2007-2008 2008-2009

Learning Support with Pupils with MLD YES YES YES     £1,473,274 £1,503,358 £1,600,442
SPLD   YES       £985,468 £1,028,475 £1,037,051
Peripatetic   YES YES YES        
Hearing / Visual   YES YES YES        
SEBD outreach only - Clarawood / Harberton YES YES       £395,485 £405,626 £463,766
SPSS     YES     £540,554 £642,242 £739,509
ASD YES YES YES YES YES £187,129 £221,927 £219,898
                 
            £3,581,910 £3,801,628 £4,060,666

MLD – Moderate Learning Difficulties
SPLD – Specific Learning Difficulties
SEBD – Social and Emotional Behavioural Difficulties
SPSS – Secondary Pupil Support Service
ASD – Autistic Spectrum Disorder

School Attendance

Lord Morrow asked the Minister of Education to detail her policy in relation to parents and guardians ensuring that children attend school; and what action can be taken against those who fail to comply.

(AQW 7625/09)

Minister of Education:

There are various options open to an Education and Library Board (ELB) when a parent fails to ensure their child's regular attendance. Firstly, the ELB serves a notice on the parent or guardian which requires them, within 14 days, to satisfy the ELB that the child is, by regular attendance at school or otherwise, receiving efficient full-time education suitable to their age, ability and aptitude and to any special educational needs they may have.

If the parent or guardian fails to satisfy the ELB within 14 days, the ELB may serve a School Attendance Order on the parent or guardian which requires them to register their child at a school named in the Order.  If the parent or guardian fails to comply with a School Attendance Order, he/she is guilty of an offence and the ELB can institute proceedings.

The ELB can apply to the courts to issue fines to parents of children who are not attending school regularly. In the Magistrates Court the maximum fine that can be imposed is £1000 in respect of each child who is missing school.

The ELB can also apply to the Family Proceedings Courts to make an Education Supervision Order under Article 55 of the Children Order 1995. A court will make an Education Supervision Order when a child of compulsory school age is not being properly educated. The Order places a child under the supervision of the ELB.

An application for an Education Supervision Order may be refused if there are other concerns about the child’s welfare. In these circumstances the Court may direct Social Services to investigate a child’s circumstances under Article 56 of the Children’s Order.

The ELBs’ Education Welfare Service (EWS) also receives referrals from schools when pupils’ school attendance is a cause for concern or drops below 85%. The initial response to a referral is a home visit which provides the Education Welfare Officer with an opportunity to assess whether the absence is condoned by parents and if they are in a position to ensure regular attendance.

Oibreoidh an EWS leis an teaghlach agus le réimse gníomhaireachtaí eile lena chinntiú go mbeidh oideachas ag a gcuid páistí mar is cuí.

The EWS will work with the family and a range of other agencies to ensure that their children are educated appropriately.

Schools in East Antrim

Mr D Hilditch asked e Minister of Education to confirm which grammar and secondary schools in East Antrim are over-subscribed for the academic year 2009/10.

(AQW 7637/09)

Minister of Education:

Ní bheidh an próiseas aistrithe ón bhunscoil go dtí an iar-bhunscoil críochnaithe go dtí 29 Bealtaine 2009, agus mar sin de, ní bheidh na sonraí deiridh ar eolas againn maidir le meánscoileanna agus scoileanna gramadaí a bhfuil leibhéal ró-iarratais orthu go dtí sin.

The process of transfer from primary to post-primary school will not be completed until 29 May 2009, therefore, final details of secondary and grammar schools which are over-subscribed will not be known until then. The Department does, however, have details of the grammar and secondary schools in East

Antrim that were over-subscribed at first preference stage for the 2009/10 academic year and these are listed below:

Ulidia Integrated College
Carrickfergus Grammar School
Belfast High School

Schools Admissions Criteria

Mr D Hilditch asked the Minister of Education what action she is taking to ensure that pupils gain entry to either the grammar or secondary school of their choice for the academic year 2009/10.

(AQW 7638/09)

Minister of Education:

Faoi shocruithe Rollaithe Oscailte, cuireann tuismitheoirí a dtosaíochtaí in iúl maidir le hiontráil a gcuid páistí ar iar-bhunscoil ainmnithe, agus tá sé mar aidhm ag an chóras tosaíocht na dtuismitheoirí a shásamh nuair is féidir.

Under Open Enrolment arrangements parents express preferences for the admission of their children to a named post-primary school, and the system aims to satisfy parental preference where possible. Parents are advised to name a minimum of three schools on the Transfer Form as it is not realistic to offer every parent and child a guarantee of successful admission to the school named as a first preference.

In this regard the arrangements for 2009/10 are consistent with those that applied in previous years, with parents assessing the likelihood of a successful application based on an examination of published schools’ admissions criteria, and in the case of a selective school application, performance in the final Transfer Test. 86.5% of applicants were admitted to their first preference school for the 2008/09 school year and I expect the 2009/10 figure to be in line with this.

Credit Cards Issued to Departmental Staff

Mr T Burns asked the Minister of Education (i) how many credit cards have been issued her Department's staff for work purposes; and (ii) in relation to punitive bank charges on these cards, (a) how many have there been; (b) the total cost of the charges; and (c) the reasons for the charges, in each of the last five years.

(AQW 7669/09)

Minister of Education:

Tá cárta creidmheasa amháin ag an Roinn Oideachais a úsáideann Oifig Phríobháideach na Roinne. Bhí cárta creidmheasa ag Oifig an Rúnaí Buan go dtí mí Eanáir 2006 fosta.

The Department of Education currently holds one credit card for use by the Departmental Private Office. Until January 2006, the Permanent Secretary’s Office also held a credit card. No punitive bank charges have been incurred by either of these credit cards during the last five years.

South Eastern Education and Library Board

Mr P Weir asked the Minister of Education if it is her intention to re-appoint the elected and independent members of the South Eastern Education and Library Board, from June 2009 to the end of the Board's term.

(AQW 7676/09)

Minister of Education:

Tá athbhunú an bhoird a bhí ar fionraí ag Bord Oideachais agus Leabharlainne an Oirdheiscirt fós faoi bhreithniú agus fógróidh mé mo chinneadh in am is i dtráth.

The re-instatement of the suspended board of the South Eastern Education and Library Board remains under consideration and I will announce my decision at the appropriate time.

South Eastern Education and Library Board

Mr P Weir asked the Minister of Education if the South Eastern Education and Library Board will be reconstituted to remain in legal standing for June 2009.

(AQW 7677/09)

Minister of Education:

Bíonn foráil ag reachtaíocht reachtúil ar athbhunú na mBord Oideachais agus Leabharlainne gach ceithre bliana. Dheimhnígh comhairleoirí dlí na Roinne go gciallíonn seo gur féidir leis na Boird reatha fanacht mar atá go dtí deireadh na bliana 2009. Ní gá, mar sin, go ndéanfar athbhunú ar na Boird i mí Mheithimh 2009.

The statutory legislation provides for the Education and Library Boards to be reconstituted in every fourth year. The Department’s legal advisors have confirmed that this enables the current Boards to remain in place until the end of 2009. There is no need, therefore, for reconstitution of the Boards to take place in June 2009.

Education and Library Board Targets

Mr P Weir asked the Minister of Education what targets have been set for each Education and Library Board for 2009/10.

(AQW 7678/09)

Minister of Education:

Leagadh amach sna litreacha ar Leithdháileadh Bhuiséad 2009/10 na Roinne, a eisíodh chuig gach Bord Oideachais agus Leabharlainne ar 6 Márta 2009, an comhthéacs straitéiseach agus tosaíochtaí dá leithdháiltí buiséid agus tugadh comhairle faoi na tosaíochtaí le haghaidh phleanáil na seirbhísí gaolmhara.

The Department’s 2009/10 Budget Allocation letters, which issued to each Education and Library Board on 6 March 2009, set the strategic context and priorities for their budget allocations and advised of the priorities for the planning of related services.

Boards were advised that their allocations are provided to support the delivery of the Department's strategic objectives and the priorities for Education as reflected in the Public Service Agreements (PSAs) underpinning the Executive’s Programme for Government (PfG). In addition, Boards were advised that plans for 2009/10 should take account of the forthcoming establishment of the Education and Skills Authority through full and positive engagement in the various stands of the convergence, planning and development programmes. Boards were also advised that they need to reflect the priority that Government attaches to protecting front-line services and to ensure also that services are managed to maximise the use of resources, particularly those that are largely demand led e.g. transport, school meals; and that they would be expected to contain HQ administration spend within defined targets and take action to share back office and other services in ways that can release more resources to the front line.

Taking account of the above requirements, and in the interests of ensuring a consistent approach across the 5 Boards, the Department has been developing and finalising a range of key priorities and targets for the period immediately ahead and these were notified to the Boards on 15 May 2009. The key actions and targets include raising standards for all; improving access to high quality education; developing the education workforce; improving the learning environment; and transforming education administration.

Nursery Schools

Mr P Weir asked the Minister of Education how many children were refused entry to a nursery school or nursery unit in the South Eastern Education and Library Board area for September 2009.

(AQW 7680/09)

Minister of Education:

Thug Bord Oideachais agus Leabharlainne an Oirdheiscirt le fios don Roinn nuair a cuireadh na próisis iontrála i gcrích ar 1 Bealtaine 2009 nach raibh áit faighte ag 726 páiste a bhí ar lorg áit naíscoile nó áit in aonad naíscoile i limistéar Bhord Oideachais agus Leabharlainne an Oirdheiscirt do mhí Mheán Fómhair. Tá 243 páiste as an líon sin sa bhliain réamhscoile dheireanach.

The South Eastern Education and Library Board have advised the Department that 726 children seeking a place in a nursery school or nursery unit in the South Eastern Education and Library Board area for September 2009 were unplaced when the admissions processes ended on 1 May 2009. 243 of these children are in their final pre-school year.

Reducing the Spread of Infections in Schools

Mr J Shannon asked the Minister of Education whether there is a policy in schools to ensure that soap is provided in toilets; and what policy is in place to prevent the spread of viruses and infection in schools.

(AQW 7691/09)

Minister of Education:

Bíonn dualgas cúraim ar scoileanna chun áiseanna oiriúnacha leithris a sholáthar do dhaltaí agus do bhaill foirne. Áitítear ar dhaltaí scoile agus ar bhaill foirne scoile sláinteachas maith pearsanta a chleachtadh i gcónaí.

Schools have a duty of care to provide suitable toileting facilities for the use of pupils and staff. School pupils and staff are encouraged to practise good personal hygiene at all times.

In response to the current swine flu alert, my Department is working closely with the Department of Health, Social Services and Public Safety (DHSSPS) and the Public Health Agency to provide advice and guidance directly to schools and through the Department’s website, to reinforce the good personal hygiene message, including regularly washing hands with soap and water, to help reduce the spread of infection in schools.

Association for Quality Education Exams

Mr J Shannon asked the Minister of Education who will fund the Association for Quality Education exams; and if she is aware of any plans to put a policy in place for students with dyslexia.

(AQW 7692/09)

Minister of Education:

Department of Education policy on Transfer 2010 is described in guidance which will be finalised following a period of consultation.

Tá na teisteanna iontrála atá á reachtáil ag an Association for Quality Education Ltd taobh amuigh de na socruithe príomhshrutha le haghaidh Aistriú 2010 agus dá réir sin beidh na scoileanna sin a thaobhaíonn leis an eagraíocht seo freagrach as aon chostais a bhaineann leis an teist.

The entrance tests being offered through the Association for Quality Education Ltd sit outside the mainstream Transfer 2010 arrangements and accordingly any costs involved will fall to the schools that have aligned themselves to this organisation. This would include the cost of making any reasonable adjustments required by law and on which schools have been advised, and adjustments of this type may include provision for children with dyslexia.

Transportation of Children to Schools

Lord Morrow asked the Minister of Education to detail the total cost of taxi fares for the transportation of children to schools, broken down by Education Library Board areas, in each of the last three years.

(AQW 7717/09)

Minister of Education:

Ba é an costas iomlán le haghaidh iompar i dtacsaithe le trí bliana anuas ná £22,272,887, agus seo mar a leanas miondealú ar an chostas sin ag gach Bord Oideachais agus Leabharlainne i ngach bliain le trí bliana anuas:

The total cost for taxi transport for the last three school years was £22,272,887, broken down by Education and library Board for each of the last three years as follows:

Year

BELB

NEELB

SEELB

SELB

WELB

2007/08

£853,290

£1,615,000

£1,425,854

£1,917,000

£1,147,641

2006/07

£736,104

£1,790,000

£1,797,052

£1,838,000

£1,163,765

2005/06

£696,594

£2,012,000

£2,086,759

£2,097,000

£1,096,828

Total

£2,285,988

£5,417,000

£5,309,665

£5,852,000

£3,408,234

The majority of the expenditure relates to pupils with a statement of Special Educational Needs and where the statement has indicated that transport must be by taxi.

Departmental Land

Dr A McDonnell asked the Minister of Education when the most recent audit of departmental land was undertaken; and how much unused land the Department currently holds.

(AQW 7730/09)

Minister of Education:

Ní leis an Roinn Oideachais (DE) talamh ar bith agus is faoi bhainistíocht na Roinne Airgeadais agus Pearsanra, mar chuid d’Eastát an Rialtais, iad na suíomhanna atá áitithe ag mo Roinn.

The Department of Education (DE) does not own any land and the sites that my Department occupies form part of the Government Estate and are managed by the Department of Finance and Personnel. Consequently, my Department has not carried out an audit of Departmental land and does not hold any unused land.

Craigavon Area Learning Committee

Mr S Gardiner asked the Minister of Education to detail the reasons why her Department rejected the action plan submitted by the Craigavon Area Learning Committee.

(AQW 7744/09)

Minister of Education:

Sonraítear na Socruithe Tacaíochta don Chreatlach Theidlíochta (EF) san imlitir 2008/12 a eisíodh chuig scoileanna i Meitheamh 2008. Leagann seo amach go soléir na tosaíochtaí maidir le cur i bhfeidhm an EF, na critéir a bhaineann le leithdháileadh na heiliminte chomhoibrithe le tacaíocht a thabhairt don obair atá á déanamh ag Pobail Foghlama Ceantair (ALC) agus na hamscalaí a bhaineann le cur i gcrích na pleananna gníomhaíochtaí. Ní leithdháiltear acmhainní le tacaíocht a thabhairt do phleananna gníomhaíochta ach amháin nuair a fhreastalaíonn said ar riachtanais mar atá leagtha amach san imlitir agus tá sé tábhachtach mar sin go ndéantar breithniú ar na pleananna gníomhaíochtaí ó gach Pobal foghlama ar bhonn cothrom agus ar bhonn comhsheasmhach.

The Entitlement Framework (EF) Support Arrangements for 2008/09 are detailed in DE Curricular 2008/12 which was issued to schools in June 2008. This clearly set out the priorities for the implementation of the EF, criteria for the allocation of the collaboration element to support the work of Area Learning Communities (ALC) and the timescales for completion of action plans. Resources can only be allocated in support of action plans that meet the requirements set out in the circular and it is therefore important that the action plans from all learning communities are considered equitably and consistently.

Our review of the Craigavon ALC plan for 2008/09 raised a number of issues that required clarification. A revised Action Plan was submitted which did address some of these concerns, however a number remained outstanding and, following a meeting with the ALC Chair and the SELB Development Officers, a further revised action plan was resubmitted at the end of February. The level of funding allocated in March 2009 was in direct correspondence to the costs of actions identified within the plan.

Balmoral High School

Mr P Butler asked the Minister of Education to provide an update on the Post Project Evaluation report into the Balmoral High School, Private Financial Initiative/Public Private Partnerships project.

(AQW 7792/09)

Minister of Education:

Níor cuireadh an obair mheasúnaithe i gcrích go fóill. Soláthróidh mé an t-eolas seo nuair a chuirtear ar fáil é.

The evaluation work has still to be completed. I will provide the information when it is available.

St Colman’s Primary School

Mr P Butler asked e Minister of Education when the demolition of St Colman’s Primary School, Lambeg, will begin and when the building of the new primary school will commence.

(AQW 7793/09)

Minister of Education:

Tá sé sceidealaithe go mbeidh scartáil St Colman’s Primary School Lann Bheag mar chuid den chonradh le scoil nua a thógáil. Tá sé beartaithe tús a chur leis an obair níos moille i mbliana.

The demolition of St Colman’s PS Lambeg is scheduled to be part of the contract to build the new school. This work is currently programmed to start later this year.

As a result of increased vandalism and anti-social behaviour my Department has recently received a request from the school authorities to demolish the old school in advance of the new build contract. This is currently being considered and the school authorities will be advised of the outcome in due course.

Department for Employment and Learning

Work Placements

Mr M Durkan asked the Minister for Employment and Learning what measures are in place to facilitate (i) higher education students; and (ii) further education students, who are unable to secure obligatory work placements, because of the economic downturn.

(AQW 7558/09)

Minister for Employment and Learning (Sir Reg Empey):

I am advised by the University of Ulster that in the current economic downturn, it has been decided that students on sandwich courses with compulsory placements, leading to the award of a Diploma in Industrial Studies who had been unsuccessful, but who could demonstrate appropriate efforts to find a placement, should be permitted to proceed directly to the final year of study.

The University also agreed that students who had not made sufficient effort to find a place could opt to apply for a leave of absence, so that they could

continue to search for a placement which might possibly be completed before the following academic year.

Queen’s University has advised that it is aware that the number of work placements may be reduced due to the current economic climate and it is monitoring the situation.

The University is exploring additional options that will provide students with relevant experience.  These include:

In addition, through the University's Degree Plus programme, students are encouraged to reflect on and utilise all aspects of their University experience, including part time paid work, to enhance their employability.

To date, St Mary’s University College, Stranmillis University College and the six Further Education (FE) Colleges have advised that they are not experiencing any significant difficulties in finding work placements for students, despite the downturn.

Apprenticeship Placements

Mr D Hilditch asked the Minister for Employment and Learning detail the progress made by his Department in increasing apprenticeship placements.

(AQW 7575/09)

Minister for Employment and Learning:

Northern Ireland has seen a significant positive change in relation to Apprenticeships training provision over the past two years. The number of Modern Apprenticeships on the Jobskills programme at 31st August 2007 stood at 5,799. With the introduction of Level 2 apprenticeships in September 2007 and all age apprenticeships in September 2008, the number of apprentices, as of 13 May 2009, stands at 10,265 representing a 77% increase.

Changes in 2008 also gave opportunity for those working reduced contracted hours to avail of apprenticeships and this is believed to have impacted positively in regard to female participation which now stands at 41% compared to the historic trend of 30%.

I trust this information is helpful.

Apprenticeship Placements

Mr D Hilditch asked the Minister for Employment and Learning to detail what progress his Department has made in helping apprentices made redundant during their apprenticeship placement.

(AQW 7576/09)

Minister for Employment and Learning:

The Department has been proactive in its attempt to address the issue of redundant apprentices. Training suppliers are continuing to refer engineering, construction and automotive apprentices to the Pre-Apprenticeship and Steps to Work programmes. Updated figures will be made available soon. The Department has also been working with specific employers such as Wrightbus, to help stem apprentice redundancies by developing bespoke training support packages.

The economic downturn however, continues to have an effect on some apprentices sustaining employment. It is for this reason I will be making an announcement shortly to advise of other measures my Department will introduce to further assist apprentices and their employers throughout these challenging times.

Departmental Land

Dr A McDonnell asked the Minister for Employment and Learning if, in light of the current economic crisis and with rising fuel and food prices, he has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7703/09)

Minister for Employment and Learning:

The only land owned by my Department is the former Felden Training Centre in Newtownabbey. The Northern Regional College is currently using the Centre to deliver its Training for Success programmes. The College will be relocating this training to its main site when they have completed a new build and refurbishment programme. The target date for the relocation is September 2010. At that time the land will become surplus and will be sold in accordance with Land and Property Services guidelines. This will include a trawl within the public sector and will provide the opportunity for other public sector bodies to express an interest.

South Eastern Regional College

Mr J Shannon asked the Minister for Employment and Learning to explain why staff at the South Eastern Regional College have to wait for 12 months to receive their cost of living difference.

(AQW 7723/09)

Minister for Employment and Learning:

Pay and conditions of College staff are a matter for the employing authority, the South Eastern Regional College (SERC).

Staff in Further Education Colleges fall into three separate groups for the purposes of pay – non-teaching, teaching, and senior.

Non-teaching staff

The non-teaching pay award is negotiated at national level by the National Joint Council and is implemented locally. Because the Further Education Employers’ side and Trade Union Side were unable to reach agreement on the implementation of the 2008/09 pay award, the matter was referred to arbitration. Following a decision in March 2009, the pay agreement was approved by the Department of Finance and Personnel.

Non-teaching staff in the South Eastern Regional College (SERC) received their revised salary rates in April 2009, with arrears scheduled for payment in May 2009.

Teaching staff

Agreement on a three year pay deal for teaching staff, commencing in September 2008 was reached in March 2009. The pay remit was approved by the Department of Finance and Personnel and implemented by the College Employers in April 2009.

Senior Staff

A three year pay remit for Senior staff, commencing in September 2008 was agreed in March 2009. The pay remit has been approved by the Department of Finance and Personnel in April 2009 and is currently being implemented by the College Employers.

South Eastern Regional College

Mr J Shannon asked the Minister for Employment and Learning to explain why staff at the former East Down Institute are not being paid the same rate of pay as staff in Ards and Down as both are employed by the South Eastern Regional College.

(AQW 7724/09)

Minister for Employment and Learning:

Pay and conditions of College staff are a matter for the employing authority, the South Eastern Regional College (SERC).

I have been advised by the College that prior to the merger of East Down, North Down and Ards, and Lisburn Institutes, in August 2007, each of these colleges had separate organisational structures, job descriptions and pay rates for staff. Following merger, SERC began the process of reviewing and evaluating all posts. The College is finalising this process in consultation with trade unions, with the aim of ensuring parity in terms and conditions for staff undertaking similar roles throughout the College.

Management and Leadership Development Programme

Mr R Newton asked the Minister for Employment and Learning if he intends to take action to address the problem of companies/applicants for the Management and Leadership Development Programme, who after being accepted to participate, have been told that funding is no longer available and the programme cancelled.

(AQW 7755/09)

Minister for Employment and Learning: The Management and Leadership Development Programme provides bursary support to assist small to medium sized companies to participate on a range of approved management development programmes offered by commercial training providers. Acceptance by the provider to participate in a specific training programme does not guarantee either eligibility or approval for bursary support from the Department. Companies are advised to apply for support well in advance of the intended programme and not to agree any specific start date for training before approval for bursary support has been given from the Department.

Earlier this year, I approved 100% funding across the full range of support available from my Department for management development training to help, particularly small companies, with the difficult economic conditions. For budgeting purposes the support will be offered in tranches throughout the year until the available budget is exhausted. The Management and Leadership Development Programme, in particular, was heavily oversubscribed in the first tranche and the Department announced a temporary suspension of new applications to avoid an over-commitment of available resource.

My officials are examining all existing applications to determine the scope to redirect client companies to less heavily subscribed funding streams to achieve the desired training. As the training programmes take place over the next few weeks it will become clear the extent to which funding commitments will crystallise into actual expenditure and will determine the budget available for subsequent tranches. Far from cancelling the programme, I expect that approvals for the second tranche of the Management and Leadership Development Programme will begin in June.

Department of Enterprise, Trade and Investment

European Sustainable Competitiveness Programme

Mr P Ramsey asked the Minister of Enterprise, Trade and Investment (i) to detail the money that is available under the sub priority 2.3 NITB under the European Sustainable Competitiveness Programme for Northern Ireland 2007-13; and (ii) how monies under this have been or will be allocated to the various signature projects in Northern Ireland.

(AQW 6632/09)

Minister of Enterprise, Trade and Investment (Mrs A Foster):

To date, the Executive has approved the allocation of £25 million European Regional Development Fund to the Northern Ireland Tourist Board (NITB) from the EU Sustainable Development Programme. Up to £21.7 million has been allocated to the Titanic Signature Project and the remainder to Product and Market Development.

The requirement for further EU allocations to Signature Projects is being kept under review by NITB and the Department.

Manufacturing Audit

Ms J McCann asked the Minister of Enterprise, Trade and Investment for an update on the manufacturing audit that her Department is undertaking.

(AQW 7402/09)

Minister of Enterprise, Trade and Investment: Invest NI have commissioned an Overview of the Northern Ireland Manufacturing Sector report which I am expecting to receive in the near future.

Additionally, the Economic Development Forum (EDF), which I Chair, has recently established a Manufacturing Advisory Sub-Group with the aim of developing and agreeing an action plan to address the current difficulties faced by manufacturers in Northern Ireland.

My officials recently met with the Managing Director of Wrightbus, and he agreed to Chair the sub-group. The terms of reference and membership have been agreed and the first meeting took place on the 8 May 2009.

DETI remains fully committed to Northern Ireland’s manufacturing sector and recognises the significant contribution it makes to the Northern Ireland economy. It is for this reason that DETI’s Corporate Plan (2008/9 – 2010/11) has made improving Northern Ireland’s manufacturing and private services productivity its top priority.

Chief Executive of the Consumer Council

Mr S Hamilton asked the Minister of Enterprise, Trade and Investment for a breakdown of the total cost of the leaving party for the Chief Executive of the Consumer Council; and if this includes an audio visual film, presentation or DVD, who owns the copyright.

(AQW 7470/09)

Minister of Enterprise, Trade and Investment: I am advised that, on 24 March 2009, the Board of the Consumer Council decided to hold a stakeholder and partnership engagement event, the first of its kind the Council had held since 2004. This event, which was held on 8 April 2009, was designed to mark the Chief Executive’s departure and to allow stakeholders to meet the new Chairperson informally. The Consumer Council has informed the Department that the itemised direct and indirect costs (including VAT) of the event were as follows:

Direct Costs    
    £
Food and drinks (including £70 for alcoholic drinks)   1,360
Waiter service   375
Music   450
Invitations   150
Decorations   150
Hire of audio visual equipment   500
Hire of plasma screens   665
  Subtotal £3,650
Indirect Costs    
Filming and making of DVD   3,622
  Total £7,272

The Consumer Council has advised that the DVD was produced as a corporate resource and will be used over the next number of years to demonstrate the significant transformation and achievements delivered by the Consumer Council over the last four years. Copyright remains the property of the Consumer Council.

The Department contacted the Council on 9 April to obtain details of the cost of the event and assurances relating to the use of the DVD. On 15 April it received the Council’s rationale for the event, and an assurance from the Chairperson that the Consumer Council is committed to delivering value for money and being a careful custodian of public funds. The importance of adherence to these principles was reinforced by Departmental representatives at its normal quarterly Oversight and Liaison meeting with the Council held on 12 May. For my part, I regard it as essential, especially in the current economic circumstances, for public bodies such as the General Consumer Council to give the taxpayer and ratepayer maximum value for money.

Wind and Sea Turbines

Mr J Shannon asked the Minister of Enterprise, Trade and Investment what contact he has had with private enterprises to help introduce off-shore wind and sea turbines.

(AQW 7568/09)

Minister of Enterprise, Trade and Investment: I visited the MCT turbine in Strangford Lough in July 2008 and have received and responded to two letters on this subject: one from an offshore wind developer and one from a tidal stream developer. My officials have also had a series of meetings with potential investors in tidal stream energy and offshore wind in Northern Ireland as part of work aimed at securing marine energy resources.

DETI is paving the way for investment in offshore energy by conducting a Strategic Environmental Assessment (SEA) of its proposals to develop offshore wind and marine renewables in NI waters. This will allow environmental matters to be considered at an early stage in the development of our plans and programmes to promote sustainable marine energy development. It is intended that this process will lead to a commercial call for leases of the sea bed for renewable energy purposes by The Crown Estate in 2010.

Departmental Land

Dr A McDonnell asked the Minister of Enterprise, Trade and Investment if, in light of the current economic crisis, and with rising fuel and food prices, she has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7644/09)

Minister of Enterprise, Trade and Investment: Invest NI’s land is held primarily as serviced sites at industrial estates to be leased to client companies with growth plans based on an eligible business case.

I have no large-scale plans to release this land for the use of local communities to grow affordable food. Industrial estates by their very nature can be dangerous places, given the high level of heavy goods vehicle traffic using the estate roads, and therefore I would not wish to encourage any increase in non-industrial and pedestrian traffic on Invest NI’s industrial landholding.

However, recently Invest NI has been approached by, and is in discussions with, a community group regarding the use of 5 acres of its land. The proposed use is on a seasonal basis, as temporary allotments, and part of a community initiative for unemployed people in that area. The land in question is isolated from the rest of the industrial estate and has its own separate access, therefore mitigating the safety concerns in this particular case.

In addition, where Invest NI has undeveloped land which would be capable of being used for agricultural purposes, Invest NI will let it out to farmers on a seasonal basis for conacre use, at a rent set by Land & Property Services.

Invest NI’s landholding is ultimately available for the strategic growth plans of Invest NI client companies. All of its conacre lets can be terminated at 4 weeks notice, to ensure immediate availability of land for this purpose. However, within the current economic climate, these small-scale agricultural uses are deemed to be an effective use of the land whilst at the same time deriving benefit for the local community.

New Small Businesses

Mr A Easton asked the Minister of Enterprise, Trade and Investment to outline what grants are available to start up a new small business.

(AQW 7714/09)

Minister of Enterprise, Trade and Investment:

Invest NI’s new Enterprise Development Programme has been operational from April 2009, and has replaced the Start a Business Programme. The Enterprise Development Programme, is the umbrella name for 2 programmes:

(i) The Go For It Programme is targeted at Early Stage and Start-Ups and offers a range of provision to improve business capability in the form of training, mentoring, signposting and referrals. Whilst there is no grant available within the new programme, participants will be given advice on their finances, marketing, sales and other fundamentals which are likely to give their business the best possible chance of success in these more difficult times.

(ii) The Growth Programme is for existing small businesses with growth potential. All participating companies will be assigned a Personal Business Advisor to assess their needs and guide them towards the right mix of training and advice. All participating companies are eligible for the training workshops, which will address the most common skills gaps among growing businesses.

The Programmes are delivered by Enterprise Northern Ireland. Enterprise NI operates a loan fund which can be used to enable companies which cannot get bank loans to fund their start-up.

Invest NI can also offer support to start-up businesses through the Export Start portfolio. This support is focused on innovative local businesses that can demonstrate the potential for substantial export growth and covers product and process innovation, capability development, exporting and investment. This leads such clients into a wider suite of programmes which can assist with innovation, market support, business improvements etc.

Chicken Waste Incinerator

Mr M McLaughlin asked the Minister of Enterprise, Trade and Investment if her Department and Invest NI have held any discussions with Rose Energy about subsidising operational costs on an ongoing basis, if its application for a chicken waste incinerator at Glenavy were to receive planning approval.

(AQW 7756/09)

Minister of Enterprise, Trade and Investment: Neither DETI nor Invest NI has held discussions with Rose Energy about subsidising operational costs. If Rose Energy were to receive planning approval, Invest NI would not subsidise operational costs on an ongoing basis.

Department of the Environment

Road Safety Grants

Mr P Weir asked the Minister of the Environment what will be the timescale for applications for Road Safety Grants for local groups following the proposed abolition of funding to the Road Safety Council.

(AQW 7293/09)

Minister of the Environment (Mr S Wilson): The Department wrote to local road safety committees on 18 December 2008 asking them to submit their bids for funding for the 2009/2010 financial year. The Road Safety Council (RSC) took great exception to the Department contacting local committees directly and instructed them not to do so. Following my meeting with representatives of the RSC on 27 February 2009, when I confirmed that the decision to channel funding away from central administration and into front line activities would stand, the RSC hand delivered bids from fourteen local committees on 13 March 2009. The Belfast committee, having decided not to accept instructions from the RSC, had sent their bid directly to the Department on 4 March 2009.

Historically, bids for financial assistance had to be with the Department by 30 January of each year, in order to allow sufficient time for proper evaluation prior to the start of the new financial year. Unfortunately, the RSC instructions to local committees resulted in considerable slippage in the normal financial timetable.

Bids from local committees are treated as a priority, and the Department aims to turn them around in a matter of weeks, if not days. Any offer of financial assistance is left open for three months from the date of the letter of offer.

Due to the lateness of the bids, local committees, who have been offered financial assistance by way of a ‘Letter of Offer’ were asked to accept and formally respond to the offer within two weeks, but of course that did not affect the three-month period of validity.

To compensate for the unfortunate delay in the receipt of bids, the Department has not yet set a deadline for the receipt of applications for financial assistance. However, the Department will write to local committees soon to confirm that a deadline of 30 June 2009 will be applied.

Public Procurement Contracts

Ms J McCann asked the Minister of the Environment to detail the companies that were successful in securing public procurement contracts in works, services and goods through the Department, in the last two years and the percentage of those that were from the SME or the Social Economy sectors.

(AQW 7437/09)

Minister of the Environment:

In the last two years the companies in the list below were successful in securing public procurement contracts in works, services and goods through my Department. Where it has been possible to identify their status, I can confirm that 42% of these companies were from the SME sector or Social Economy sector.

Aardvark Geological Services
Abacus Business Forms
ACR
Addleshaw Goddard
Advance Stamp & Plate
AEA Energy & Environment
AFIC
Agri-Food Biosciences Institute
Allen-Mellon Environmental Ltd
Amtec
Andrew Rushworth
Antrim Supplies Ltd
Arthur Cox Northern Ireland
Atkins Ltd
Banner Business Supplies
BDO StoyHayward
Bearing Point Consultancy
Blueprint Appointments
Bond Solon Training
Bryan Hynds
BT Training Solutions
Burlington Uniforms Ltd
Capita Business Services Ltd
Capita Symonds Ltd
CDM Ireland
CDS
Classic Career Clothing
Colin Buchanan & Partners
Colin Hatrick
Community Technical Aid
Compass Service UK Ltd
Comtrol
DAP
De La Rue Smurfit
Deli Lites
Deloitte & Touche
Deloitte MCS Ltd
Dennis McCoy Consulting
Document Processing Agency Ltd
Elite Promotions
Enfonic
ENSIS Ltd
Entec UK Ltd
Environment Agency
ERIC Ltd
Evolve
Excite Exhibition and Display
Faber Maunsell
Fortoak Ltd
Gaia Law
Golder Associates (UK) Ltd
Grafton Recruitment Ltd
HELM Corporation
i2 Ltd
Information Risk Management
Insight
Irish Arms Historical Reproductions
iSonic Ltd
Jackie Morgan
Jacobs
JH Print & Packaging
JNCC
Julie Martin Associates
JVA Analytical Ltd
KBS Computer Supplies Ltd
KOREC
KPMG
Manns Williams
Manogue Architects
MBA Group Ltd
McClure Watters
McGovern Contracts
Minprint
Morrow Communications
Mr Kerry Leonard
National Museums and Galleries of N.I.
Natural Environment Research Council
Neopost
Nick Brannon
Northern Ireland Environment Link
Nukey Services
Oakdene Services
Office Depot
PA Consulting Group
Paul Logan Architects
Piaggio Ltd
Plastisign
PriceWaterhouseCoopers
Priory Press
Pro-Arc Limited
Queen’s University of Belfast
Quercus
Quicks Office Supplies
Redfinn Boats
Research and Marketing Plus
RPS Consultants Ltd
RSK Ireland
RSPB
Rusk Design
RW Pierce & Co
Sam Hutchinson & Co
SGS (UK) Ltd
Shred-It Northern Ireland
Simon Jersey Limited
SM Cuffey Landscapes
Social and Market Research
Sopra Group
Sustainable NI
Telford Training Consultants
Tennants UK Ltd
Tim Birley Consultancy
TSO
TSO Ireland
TTC 2000
Unicomarine Ltd
Universities Press / Graham & Heslip
University of Ulster
Veolia Environmental Services
Waters Chromatography Ireland Ltd
White Young Green Consulting
Wildfowl and Wetlands Trust
Windmill Print
WS Atkins
Zing Design

Planning Applications

Mrs N Long asked the Minister of the Environment (i) to what degree Planning Circular PC 0307 is material in the consideration and determination of Planning Applications; and (ii) if this is reflected in (a) Planning Service; and (b) Planning Appeals Commission decisions, prior to and subsequent to its issue in August 2007.

(AQW 7456/09)

Minister of the Environment: Planning Circular (PC 03/07): "Assessing Planning Applications for Residential Development in Urban Areas, Villages and Other Small Settlements" is internal guidance which seeks to remind Planning Service staff of the full policy context when assessing planning applications for residential development in Urban Areas, Villages and other Small Settlements as a matter of good practice. It is not new policy but the pulling together of existing policy and guidance, which is already in the public domain, in a format which is easily accessible for staff.

The circular and the policy context are material considerations reflected in Planning Service decisions. Prior to issue of the Circular in August 2007, the existing policy context was a material consideration in the determination of planning applications.

Decisions issued by the Planning Appeals Commission are a matter for the Commission.

Infill Developments

Mrs N Long asked the Minister of the Environment if he has raised the issue of the cumulative effects of successive infill developments on character, amenity and infrastructure with (a) the Minister for Regional Development; (b) the Roads Service; or (c) NI Water; and whether the Departments take a coordinated approach to this issue.

(AQW 7461/09)

Minister of the Environment: The assessment of the impact of any development proposals on the character of the area or on residential amenity rests solely with Planning Service.

DRD Roads Service and NI Water provide consultation advice to Planning Service in relation to their stakeholder functions, including the cumulative effects on infrastructure where this is appropriate. This is standard procedure and I have not had to raise this issue with the relevant Minister.

Tree Preservation Orders

Mrs N Long asked the Minister of the Environment what criteria, processes, and considerations are involved when deciding to apply a temporary Tree Preservation Order on a site subject to development proposals.

(AQW 7464/09)

Minister of the Environment: There is no provision in legislation for "temporary" Tree Preservation Orders. The Department can impose a Provisional Tree Preservation Order which protects trees for a period of six months. This allows the Department time to carry out a detailed tree survey and decide if all or some of the trees in question should be protected.

The key considerations used for imposing a Provisional Tree Preservation Order include the following: the amenity value of the tree/trees, group of trees or woodland in question individually or collectively within their context; degree of public visibility; historical importance; rarity value; and whether they can assist in strengthening a planning condition.

Other considerations include the condition, age and species of such trees and any health and safety issues arising especially in relation to adjoining structures and roads.

Based on the above considerations the Department will decide, following a landscape and visual assessment, whether or not to proceed with a Provisional Tree Preservation Order.

Bumblebee Numbers

Mr J Shannon asked the Minister of the Environment has he had any discussion with countryside bodies or other departments in light of recent decreases in bumblebee numbers.

(AQW 7475/09)

Minister of the Environment: The Northern Ireland Environment Agency (NIEA) has recently published two documents; a Regional Red Data List of Bees; and The State of Ireland’s Bees; in conjunction with the National Parks and Wildlife Service in the Republic of Ireland.

These reports have highlighted habitat loss and fragmentation as an important factor causing the decrease in bumblebee numbers. NIEA has encouraged the adoption of a range of site and habitat measures which benefit bumblebees in discussions with Northern Ireland Government Departments, most notably DARD, and voluntary conservation bodies.

In the new Countryside Management Scheme administered by DARD, farmers can receive payment to plant a ‘pollen and nectar mixture’ as one of the habitat measures. This positive initiative will provide additional habitat for bumblebees.

Enforcement Staff

Mr J Shannon asked the Minister of the Environment for the reasons that enforcement staff were not available to go out to enforcement calls for almost four weeks March and April 2009.

(AQW 7477/09)

Minister of the Environment: Enforcement staff from throughout the Department were available for enforcement calls in March and April 2009. The Northern Ireland Environment Agency’s (NIEA) Water Management Unit enforcement staff attended 320 reports of alleged pollution during March and April 2009. Their Environmental Crime Unit colleagues carried out 165 visits and inspections during this period.

Visits were conducted as normal by staff from the Driver and Vehicle Agency (DVA) and Planning Service. During March and April 2009, the DVA planned and conducted 55 Enforcement Operations. Likewise, all Planning Service enforcement staff were available to carry out normal enforcement duties (including site inspections) during this period.

M2 Widening Scheme

Mr T Burns asked the Minister of the Environment to detail any water pollution incidents his Department investigated which occurred during the M2 widening scheme.

(AQW 7510/09)

Minister of the Environment: The Northern Ireland Environment Agency has not investigated any pollution incidents as a result of the M2 widening scheme.

Ulster Farm By-Products Operation in Glenavy

Mr T Burns asked the Minister of the Environment to detail any recent reports of pollution his Department has investigated in relation to the Ulster Farm By- products operation in Glenavy.

(AQW 7511/09)

Minister of the Environment: In the period 1 September 2008 to 7 May 2009, four reports of water pollution in the vicinity of Ulster Farm By-Products were made to the Northern Ireland Environment Agency.

Pollution was reported on 9 November, 16 November, 2 December and 21 December 2008. All four cases were investigated and no pollution was detected in the vicinity of Ulster Farm By-Products.

Road Safety Council

Mr M McLaughlin asked the Minister of the Environment to explain the decision of his Department to cease funding for the Road Safety Council.

(AQW 7522/09)

Minister of the Environment: Three successive reports by independent consultants, over the last eleven years, have indicated that the Road Safety Council is no longer fit for purpose in its present form, hence my decision to channel funding away from central administration and into the front line road safety activities of local committees.

The British Institute of Traffic Education Research (BITER) reviews of 1997 and 2002 concluded that the work of the Council did not significantly enhance the Department’s road safety activities or represent good value for money.

The current review by PA Consulting Group is the most comprehensive and critical evaluation of the Council to date. The 37 key findings in the report cover a number of deficiencies ranging from a lack of strategic direction, leadership and control, through the absence of targeted local activities, to the inability of the Council to bring added value to the delivery of the Road Safety Strategy 2002-12.

It detailed the disproportionate central overhead cost, which did not represent reasonable value for money, and it also reported that the Council and the committees had failed to address key recommendations identified in previous reviews.

Senior Civil Servant Bonuses

Mr P McGlone asked the Minister of the Environment how much was paid in bonuses to senior Civil Servants in his Department in (i) 2003/04; (ii) 2004/05; (iii) 2005/06; (iv) 2006/07; and (v) 2007/08.

(AQW 7538/09)

Minister of the Environment: The following table provides a breakdown of the number and total of bonuses paid to the Senior Civil Servants in DOE from 2003/04 to 2007/08.

Dept

2003/04 2004/05 2005/06 2006/07 2007/08
  No. Total No. Total No. Total No. Total No. Total
DOE 10 £40,000 14 £57,250 14 £78,500 12 £84,000 11 £86,750

River Pollution

Mr T Burns asked the Minister of the Environment to detail (i) the sum total of all fines imposed by the courts for river pollution offences; and (ii) the sum total of all ‘payment of costs’ sanctions ordered by courts against river polluters, in each of the last five years.

(AQW 7590/09)

Minister of the Environment: In the last 5 years, January 2004 to December 2008, fines totalling £271,125 in relation to offences under the Water (NI) Order 1999, have been imposed by Courts throughout Northern Ireland.

The sum of all costs payable through sanctions ordered totalled £32,097.09.

The breakdown of these figures is detailed in the table below.

FINES AND COSTS FOR PERIOD 2004 – 2008
YEAR FINES ANALYSIS COSTS COURT COSTS TOTAL
2004 £88,575 £4,119.63 £7,262.00 £99,956.63
2005 £42,700 £1,294.52 £1,949.16 £45,943.68
2006 £74,100 £6,179.66 £1,269.49 £81,549.15
2007 £48,700 £5,868.41 £1,171.00 £55,739.41
2008 £17,050 £2,513.22 £470.00 £20,033.22
T0TALS £271,125 £19,975.44 £12,121.65 £303,222.09

River Pollution

Mr T Burns asked the Minister of the Environment whether the money paid in fines and costs imposed by courts for river pollution offences is allocated to his Department, to the Department of Finance or to the Treasury of the United Kingdom.

(AQW 7591/09)

Minister of the Environment: Fines imposed by Courts are credited by the Northern Ireland Court Service to the UK Consolidated Fund and paid to the Treasury. The Northern Ireland Environment Agency can claim for reimbursement of costs (incurred for the investigation and clean-up) directly from the polluter.

PSV Tests for Taxis

Mr B McElduff asked the Minister of the Environment to detail the reasons for the recent price rise for PSV tests for taxis; and to provide a breakdown of this cost.

(AQW 7596/09)

Minister of the Environment: Under the HM Treasury Fees and Charges Guide the Agency is required to recover in full the costs associated with a particular activity.

The recent PSV Taxi Licence fee increase of £12 (9%) covers increased costs arising from inflation and pay awards over the 3 year period from April 2007 to March 2010.

PSV Taxi Licence Fee
Direct Costs  
Labour £ 44.64
Enforcement Cost £ 20.00
Taxi Plating £ 22.05
Taxi IT System Costs £ 9.93
Booking System £ 2.03
Testing Equipment PFI £ 4.11
Overhead Costs  
Labour (e.g. IT, finance, personnel & customer services staff) £ 15.82
Overheads (e.g. IT, stationery, training, travel, telephone) £ 8.40
Accommodation (rent, rates, heat, light, security, cleaning) £ 8.17
Central DOE/DRD/DFP charges £ 3.28
TOTAL COSTS £138.43
PROPOSED FEE £138.50

PSV Tests for Taxis

Mr B McElduff asked the Minister of the Environment to detail (i) the costs of; and (ii) the reasons for the differences in costs between a taxi taking a PSV test and a car taking an MOT test.

(AQW 7597/09)

Minister of the Environment: Under the HM Treasury Fees and Charges Guide the Agency is required to recover in full the costs of its operations.

The cost of the PSV Taxi licence is £138.50 and the cost of an MOT test for a private car is £30.50

The difference in the cost of a taxi PSV licence and a car MOT test is due to significant differences in the PSV and MOT processes. An MOT test involves a physical inspection of the vehicle. A PSV test is made up of a physical inspection of the vehicle, an assessment of the suitability of the applicant to operate a taxi and the production and issue of taxi plates. IT system costs and a contribution to enforcement activity are also included in the PSV fee.

Wind Turbines

Mr P Doherty asked the Minister of the Environment which planning policies apply to domestic and commercial wind turbines.

(AQW 7627/09)

Minister of the Environment: Planning applications for wind turbines are assessed in the context of Policy PSU 12 ‘Renewable Energy’, contained in "A Planning Strategy for Rural Northern Ireland". Other material considerations in the assessment of such proposals include any other relevant planning policy, such as the policies contained in area plans, the responses of statutory consultees such as the Environmental Health Department and the District Council, and any third party representations.

Draft Planning Policy Statement (PPS) 18 ‘Renewable Energy’ which was published for consultation on 23 November 2007, also became a material consideration for determining applications at that time. Subject to Executive clearance, I hope to publish PPS 18 in June 2009. It will supersede PSU 12 when it is published in final form.

These policies do not apply to off-shore wind turbines as these are not subject to control under the land use planning system.

Planning Enforcements

Mr J Shannon asked the Minister of the Environment how many incidences involving planning enforcements have been responded to within the target response times in 2007 and 2008.

(AQW 7629/09)

Minister of the Environment: My Department did not compile statistics on enforcement cases prior to 31 March 2009 hence the information requested is not available.

My Department has been working to improve the recording of enforcement cases and this work has involved modifying the existing enforcement data base. An exercise to input data into the new system is ongoing. It is anticipated that statistical information on performance against agreed targets will be available from September 2009 for live enforcement cases as at 1 April 2009.

Irish Hare

Mr J Shannon asked the Minister of the Environment, given the latest figures that show a significant increase in the number of hares, when he will consult on hare preservation.

(AQW 7630/09)

Minister of the Environment: The consultation on the review of the Wildlife (NI) Order 1985, which took place last year considered the issue of statutory protection for the Irish hare for the longer term. There was a broad agreement from respondents that efforts to support the maintenance and restoration of suitable habitat offers the best means of achieving long term sustainability of the Irish hare population, rather than giving the species permanent protection under the Wildlife Order. This is the approach I propose to pursue.

Departmental Land

Dr A McDonnell asked the Minister of the Environment if, in light of the current economic crisis, and with rising fuel and food prices, he has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7645/09)

Minister of the Environment: The vast majority of lands owned by the Department fall into one of three categories: Country Parks, Nature Reserves and Historic Monuments in State Care.

I have no plans at present to release any of the Department’s land for the use of local communities to grow affordable food, but will keep this possibility under review.

Abstraction Licenses

Mr D McKay asked the Minister of the Environment to list the abstraction licenses that are used on the Moyola River and when they are due to expire.

(AQW 7648/09)

Minister of the Environment: The Table below lists the authorisations/licences issued for abstractions and impoundment activities on the Moyola River. Licences are not time limited but the Department of the Environment has powers to review, modify and/or revoke licences if required under the Water Abstraction and Impoundment (Licensing) Regulations (Northern Ireland) 2006.

Company Name Volume M3 per day Sector Date Authorised Licence Issued
Northern Ireland Water 20,000 Public Water Supply N/A 26/03/2007
Moyola Trustees 175,000 Hydro Power 20/03/2008  

Abstraction Licenses

Mr D McKay asked the Minister of the Environment (i) what his Department is doing to ensure that abstraction license owners on the Moyola River are abiding by the EU Water Framework Directive; and (ii) what enforcement measures are in place.

(AQW 7649/09)

Minister of the Environment: The Water Abstraction and Impoundment (Licensing) Regulations (Northern Ireland) 2006 came into operation on the 1 February 2007. The implementation of this legislation fulfils Northern Ireland’s obligation to the European Commission under both the Water Framework and Habitats Directives, to establish a water resource management, assessment and licensing regime.

Once an authorisation/licence is issued, the Northern Ireland Environment Agency (NIEA) will inspect the relevant operation to assess compliance. NIEA has powers under the legislation to serve an enforcement notice where conditions of an authorisation or licence are not being complied with or where an authorised activity has had, is having, or is likely to have a significant adverse impact on the water environment.

Enforcement notices will stipulate the steps required to remedy the non-compliance and to address the adverse, or likely adverse impact, on the environment.

Irish Hare

Mr D McKay asked the Minister of the Environment to detail what evidence his Department has received that the rural community and the general public support permanent protection of the Irish Hare.

(AQW 7660/09)

Minister of the Environment: My Department has received correspondence from members of the public, many from rural areas, supporting permanent protection for the Irish hare. However, the majority of such correspondence related to banning hare coursing, which I do not believe is a primary conservation issue.

My Department is also aware of post card campaigns undertaken by the League Against Cruel Sports calling for permanent protection, principally as a means of preventing hare coursing.

Irish Hare

Mr D McKay asked the Minister of the Environment if he would consider giving permanent protection to the Irish Hare.

(AQW 7661/09)

Minister of the Environment: The consultation on the review of the Wildlife (NI) Order 1985, which took place last year considered the issue of statutory protection for the Irish hare for the longer term. There was a broad agreement from respondents that efforts to support the maintenance and restoration of suitable habitat offers the best means of achieving long term sustainability of the Irish hare population, rather than giving the species permanent protection under the Wildlife Order. This is the approach I propose to pursue.

Irish Hare

Mr D McKay asked the Minister of the Environment if the Irish Hare's inclusion on the Quarry Species list, has created confusion over its temporary protected status.

(AQW 7662/09)

Minister of the Environment: I am not aware of any confusion arising during the periods that temporary Special Protection Orders have been in operation. My Department has worked closely with relevant bodies representing the country sports community to ensure that the level of legal protection has been clear.

Planning Applications

Mr P McGlone asked the Minister of the Environment pursuant to his answer to AQW 7317/09, to detail (i) the quality assurance process, including the date of public consultation and implementation; and (ii) the delay implications it has for freedom of information requests and requests to Divisional Planning Offices from members of the public.

(AQW 7683/09)

Minister of the Environment: In 2007, the Statistics and Registration Service Act established an independent UK Statistics Authority to promote and safeguard the production and publication of Official Statistics. The Act required the UK Statistics Authority to prepare and publish a Code of Practice for Official Statistics and assess compliance against it. Ministers in Northern Ireland supported the extension of the legislation, and thus the Code to Northern Ireland. Further details on The Statistics and Registration Service Act 2007 may be obtained from The Office of Public Sector Information
http://www.opsi.gov.uk/acts/acts2007/ukpga_20070018_en_1).

The Code of Practice was published on 6th January 2009 and contains eight principles and, in relation to each, a statement of associated practices. It also contains three more detailed protocols – on user engagement; on the release of statistics; and on the use of administrative data for statistical purposes. The Code has been framed to support the assessment of compliance by the UK Statistics Authority. Taken together, the principles and protocols of the Code are intended to ensure: that the range of official statistics meets the needs of users; that the statistics are produced, managed and disseminated to high standards; and that the statistics are well explained. Further details on the code of practice may be obtained from the Statistics Authority website at, www.statisticsauthority.gov.uk.

As required under Section 11(1) of the Act, the Code does not cover requirements in relation to ‘pre-release’ access to statistics. Pre-Release Access Orders provide the rules and principles relating to the granting of such access. The Code applies as if it included these Orders. Further details regarding The Pre-release Access to Official Statistics Order (Northern Ireland) 2009 is available from The Office of Public Sector Information,
http://www.opsi.gov.uk/sr/sr2009/nisr_20090071_en_1.

To protect the integrity of the Official Statistics advance, or pre-release access to the statistics is restricted to a small number of officials and the Minister. As of 1st April 2009, upon enactment of the legislation the pre-release access period reduced to 24 hours. This applies across all departments and agencies for the dissemination of Official Statistics.

Planning Applications entered and stored in the Agency’s computer system are raw un-cleansed, un-validated and incomplete. Planning Service undertakes a quality-assurance process which seeks to remove inaccuracies in the raw data. This work takes time to complete but is essential to ensure that statistics released are produced using information which has been cleansed and verified to the quality principles outlined in the code of practice. This is fundamental to the release of statistical information and there is a number of quality-assurance protocols developed.

With regards to the quality-assurance process and the public consultation and implementation, Planning Service along with all NI Departments and Agencies who produce Official Statistics adhere to the Code of Practice and its principles and protocols. This was determined when NI Assembly Ministers agreed to the extension of the legislation to Northern Ireland. The Statistics Authority and The Office for National Statistics produced the Code of Practice and the protocols and further information and details regarding the quality-assurance protocols, pubic consultation and implementation may be obtained from the Office for National Statistics at, www.ons.gov.uk.

In response to the delay implications it has for freedom of information requests and requests to Divisional Planning Offices from members of the public, my predecessor wrote to members in December 2007 informing of the changes to the dissemination of statistical information from Planning Service. The public were informed of the new service and changes in a press release of 24 October 2007. Since these notifications, all data provided in response to queries from either members of the assembly or the public is sourced from the Official Statistics publication databases. The timetable for release of Official Planning Statistics is available from the Agency website at

http://www.planningni.gov.uk/index/tools/stats_timetable.pdf. Only cleansed, validated, quality assured and published data is provided in response to a request for information.

There is a delay between the reporting period end and when the Official Statistics are published. This is the same for all Departments and Agencies who produce Official Statistics.

However, Planning Service is seeking to reduce the time taken to prepare statistics for publication. If a request for information refers to data that has been through the quality assurance process, it will be responded to as normal. If the data requested has not been through the quality assurance process, the requester will be informed, within 20 working days, that the information cannot yet be disclosed as it would not be in the public interest to release information that has not been fully quality assured as required by the Statistical Code of Practice. The requester will be informed of when the information will become available.

Planning Service will continue to regularly review statistical procedures to keep cleansing, validation and quality assurance process times to a minimum.

Planning Applications

Mr P McGlone asked the Minister of the Environment pursuant to his answer to AQW 7317/09, to detail (i) the new statistical code of practice, including date of implementation; and (ii) what delay implications it has for freedom of information requests and requests to Divisional Planning Offices from members of the public.

(AQW 7685/09)

Minister of the Environment: In 2007, the Statistics and Registration Service Act established an independent UK Statistics Authority to promote and safeguard the production and publication of Official Statistics. The Act required the UK Statistics Authority to prepare and publish a Code of Practice for Official Statistics and assess compliance against it. Ministers in Northern Ireland supported the extension of the legislation, and thus the Code to Northern Ireland. Further details on The Statistics and Registration Service Act 2007 may be obtained from The Office of Public Sector Information
http://www.opsi.gov.uk/acts/acts2007/ukpga_20070018_en_1).

The Code of Practice was published on 6th January 2009 and contains eight principles and, in relation to each, a statement of associated practices. It also contains three more detailed protocols – on user engagement; on the release of statistics; and on the use of administrative data for statistical purposes. The Code has been framed to support the assessment of compliance by the UK Statistics Authority. Taken together, the principles and protocols of the Code are intended to ensure: that the range of official statistics meets the needs of users; that the statistics are produced, managed and disseminated to high standards; and that the statistics are well explained. Further details on the code of practice may be obtained from the Statistics Authority website at, www.statisticsauthority.gov.uk.

As required under Section 11(1) of the Act, the Code does not cover requirements in relation to ‘pre-release’ access to statistics. Pre-Release Access Orders provide the rules and principles relating to the granting of such access. The Code applies as if it included these Orders. Further details regarding The Pre-release Access to Official Statistics Order (Northern Ireland) 2009 is available from The Office of Public Sector Information,
http://www.opsi.gov.uk/sr/sr2009/nisr_20090071_en_1.

To protect the integrity of the Official Statistics advance, or pre-release access to the statistics is restricted to a small number of officials and the Minister. As of 1st April 2009, upon enactment of the legislation the pre-release access period reduced to 24 hours. This applies across all departments and agencies for the dissemination of Official Statistics.

Planning Applications entered and stored in the Agency’s computer system are raw un-cleansed, un-validated and incomplete. Planning Service undertakes a quality-assurance process which seeks to remove inaccuracies in the raw data. This work takes time to complete but is essential to ensure that statistics released are produced using information which has been cleansed and verified to the quality principles outlined in the code of practice. This is fundamental to the release of statistical information and there is a number of quality-assurance protocols developed.

With regards to the quality-assurance process and the public consultation and implementation, Planning Service along with all NI Departments and Agencies who produce Official Statistics adhere to the Code of Practice and its principles and protocols. This was determined when NI Assembly Ministers agreed to the extension of the legislation to Northern Ireland. The Statistics Authority and The Office for National Statistics produced the Code of Practice and the protocols and further information and details regarding the quality-assurance protocols, pubic consultation and implementation may be obtained from the Office for National Statistics at, www.ons.gov.uk.

In response to the delay implications it has for freedom of information requests and requests to Divisional Planning Offices from members of the public, my predecessor wrote to members in December 2007 informing of the changes to the dissemination of statistical information from Planning Service. The public were informed of the new service and changes in a press release of 24 October 2007. Since these notifications, all data provided in response to queries from either members of the assembly or the public is sourced from the Official Statistics publication databases. The timetable for release of Official Planning Statistics is available from the Agency website at

http://www.planningni.gov.uk/index/tools/stats_timetable.pdf. Only cleansed, validated, quality assured and published data is provided in response to a request for information.

There is a delay between the reporting period end and when the Official Statistics are published. This is the same for all Departments and Agencies who produce Official Statistics.

However, Planning Service is seeking to reduce the time taken to prepare statistics for publication. If a request for information refers to data that has been through the quality assurance process, it will be responded to as normal. If the data requested has not been through the quality assurance process, the requester will be informed, within 20 working days, that the information cannot yet be disclosed as it would not be in the public interest to release information that has not been fully quality assured as required by the Statistical Code of Practice. The requester will be informed of when the information will become available.

Planning Service will continue to regularly review statistical procedures to keep cleansing, validation and quality assurance process times to a minimum.

High Hedges

Mr A Easton asked the Minister of the Environment when he intends to bring forward legislation on high hedges.

(AQW 7686/09)

Minister of the Environment: As any scheme to deal with the issue of high hedges will be operated by local government I must be conscious of the impact on Councils of the Review of Public Administration and our intention to implement the agreed local government reorganisation package by 2011. I also have to be mindful of the competing priorities and resource constraints I am facing. In these circumstances, I intend to undertake the engagement process with the eleven new Councils after they have been elected in May 2011.

Irish Hare

Mr D McKay asked the Minister of the Environment how his Department and the PSNI co-operate to prevent hare coursing.

(AQW 7695/09)

Minister of the Environment: Coursing of Irish Hares has been banned in Northern Ireland since 2004 by a Special Protection Order issued on an annual basis by the Department of the Environment. This makes it an offence to hold a coursing event or to course Irish Hares.

Any reports of illegal hare coursing brought to the attention of the Wildlife Officer in the Northern Ireland Environment Agency (NIEA) are reported to the PSNI’s Wildlife Liaison Officer for investigation.

The NIEA also chairs the local Partnership Against Wildlife Crime Group. This Group has representatives from nature conservation, animal welfare, Government Agencies and Departments, PSNI and from country sports clubs. The Group meets regularly to share information on wildlife crime including illegal hare coursing.

Irish Hare

Mr D McKay asked the Minister of the Environment for his assessment of whether the Irish hare should continue to be a game species.

(AQW 7696/09)

Minister of the Environment: The Wildlife Order review has considered the issue of statutory protection for the Irish hare in the longer term for conservation purposes. The consultation on the Order indicated general agreement that the Irish Hare should continue to be a game species.

Irish Hare

Mr D McKay asked the Minister of the Environment to outline how the Irish hare population has changed over the past ten years.

(AQW 7697/09)

Minister of the Environment: During the mid 1990s, the Department of the Environment funded a study at Queen’s University into the distribution and ecology of the Irish Hare in Northern Ireland. The study demonstrated that although widespread throughout Northern Ireland, the Irish Hare occurred at low densities of around 1-2 per km2. This was the first comprehensive survey of the Irish Hare population and the observation prompted the Department to publish an Irish Hare Species Action Plan in 2000. The Plan had the following three main targets:

  1. Maintain the existing range and demonstrate a population increase by 2005;
  2. Double the present population by 2010 over as much of the range as possible; and
  3. Maintain and increase the area and quality of suitable hare habitat.

To follow up on the first two targets, the Department funded Queen’s University to undertake a series of night driven spotlight transect surveys to estimate the hare population throughout Northern Ireland. This survey commenced in 2002. After the 2004 results were published, and to provide sound evidence for future Special Protection Orders, it was decided that there should be annual surveys up to 2010.

The full published series of Irish Hare surveys acquired to date is as follows:

Year Mean estimated density hares/km2 (Confidence Intervals)* Total estimated abundance (Confidence Intervals)*
2002 1.00 (0.50-1.80) 14,000 (7,000 - 25,200)
2004 5.11 (4.23 – 6.16) 72,000 (59,700 - 86,900)
2005 3.10 (2.49 – 3.87) 43,700 (35,000 - 54,400)
2006 2.57 (1.91 – 3.46) 42,600 (28,600 – 63,400)
2007 4.03 (2.81-5.79) 57,100 (39,800 – 82,000)
2008 2.86 (2.16 - 3.79) 40,500 (30,613 – 53,700)

*Range as confirmed by statistics

Department of Finance and Personnel

Civil Service

Mr M Durkan asked e Minister of Finance and Personnel for an update on the equal pay claim for Civil Service staff; and when these payments will be made.

(AQW 7231/09)

Minister of Finance and Personnel (Mr N Dodds): Equal pay claims have been lodged with the Industrial Tribunals and are now the subject of legal processes. At the same time, discussions with NIPSA are on-going in effort to establish the parameters within which a negotiated settlement to this issue might be reached. This will inform consideration by me, in conjunction with my colleagues in the Executive, as to how the matter should be taken forward. I am unable to provide any further specific details at present as regards when this matter will be resolved but I am keen that it is brought to a conclusion as quickly as possible.

Public Procurement Contracts

Ms J McCann asked the Minister of Finance and Personnel to detail the companies that were successful in securing public procurement contracts in works, services and goods through the Department, in the last two years and the percentage of those that were from the SME or the Social Economy sectors.

(AQW 7438/09)

Minister of Finance and Personnel: The following firms have entered into contracts with the Department of Finance and Personnel in the period 1 April 2007 to 31 March 2009.

Works

Cannon Pest Control

John Graham (Dromore) Ltd

CM3 Ltd

JJ McAdam & Sons

Faithful & Gould

NIAVAC Communication Ltd

George Watson Joinery

Walls to Workstations Ltd

H&J Martin, Belfast

Wm Dowling Ltd, Belfast

Services

Access to Benefits

ISTMET Ltd

Apple Recruitment

Jones and Cassidy Solicitors

Aspect

Joseph Flanigan & Son

Asset Management Ireland

Kainos

Baker Tilly Mooney Moore

Lagan Technologies

Banner Business Supplies

Lockheed Martin UK

BrownMack

Lyle Bailie International

BSS

Market Research NI Ltd

British Telecom PLC

McConnells Off site storage

Cable & Wireless

Mentoring Connection

Capita Business Services Ltd

Microsoft

Carlton Baxter

Navigator Blue

Centroid Systems

Neueda

CMC Limited

Nicholson and Bass

Change Management Consultancy Support

Northgate Information Solutions Plc

Dell

PA Consulting

Deloitte & Touche

Pearn Kandola

DLA Piper

Pentagon Solutions

DMG Services

Photoarc Surveys

Dr Donncha Hanna

PricewaterhouseCoopers

Dr Pamela Campanelli

Radisson Roe Park Hotel

DX Network Services

RMA Systems

EG Information Consulting Limited

Robert Campton

Eircom (UK) Ltd

Royal Mail

Envita

RW Pierce & Co

FGS McClure Watters

School & Office Supplies

Fire IMC

Selex Communications

Fitzroy Contracts

Senator International

Fonacab

Siemens

Grafton Recruitment

Social and Market Research

Hamilton Architects

Sodexho

Help the Aged  

Sopra Newell & Budge

Hewlett-Packard Ltd

Steria

Ian Brown

The Stationery Office

Information Risk Management PLC

TSO Ireland

Intuit

UUJ

IRRV

The Whitehall and Industry Group

Goods

ARCO

PlanNet 21 Communications

City Comm

Sinclair Voicenet

Excite Promotional Merchandise

Workwear

NI Hospice

 
Percentage of companies from the SME or Social Economy sector:

Works - 60%
Services - 66%
Goods - 57%

These figures are based on information provided by the companies themselves.

HR Connect

Mr M Durkan asked the Minister of Finance and Personnel how many complaints have been received by (i) HR Connect; and (ii) public sector employers, in relation to the activities of HR Connect, broken down by Department and agency.

(AQW 7440/09)

Minister of Finance and Personnel: The total number of complaints received by HRConnect since November 2007 is 3838. The attached table provides details broken down by employing Department/Agency/organisation.

The HRConnect complaints process requires employees to raise complaints directly with HRConnect. The Department of Finance and

Personnel does not hold information about HRConnect complaints made directly to other public sector employers.

Table to show by participant the number of complaints recevied by HRConnect from November 2007 up to and including April 2009
                                       
  Number of Complaints Received By Month By Participant
  2007 2008 2009 Total by
Department
Name of Participant Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr  
External Applicants                   1 2 1 2 9 0 1 7 12 35
Agri-Food and Biosciences Institute                   1   3 11 9 25 49 77 31 206
Northern Ireland Office                     2 2 1 1 2 3 125 56 192
NI Ombudsman                           1         1
NI Policing Board                       1     1 11     13
Department of Agriculture and Rural Development       1   2   4 2 2 3 7 19 13 48 96 186 89 472
Department of Culture, Arts and Leisure         1     1 2       1 4 6 11 12 4 42
Public Records Office NI               1                     1
Department of Education                         2 3 8 5 15 3 36
Department for Employment and Learning         1     1   1     2 4 6 22 41 15 93
Department of Enterprise, Trade and Investment   2           1 4 2   4 4 7 17 17 63 39 160
Health and Safety Executive NI                   1                 1
Department of Finance and Personnel 1       1     3   1   7 10 17 51 64 137 48 340
Office of the First Minister and Deputy First Minister     2         4 5 9 1 4 12 6 12 12 15 18 100
Deprtment of Health, Social Services and Public Safety       3   1   2 3 8   4 8 4 31 33 65 44 206
Department of the Environment       1 4 1       1   6 7 23 81 93 89 58 364
Driver and Vehicle Agency                                     0
Planning Service     -     1                         1
Environment and Heritage Service/now known as NI Environment Agency       1                             1
Department for Regional Development               2 4   2 5 19 12 59 66 72 44 285
Department for Social Development       2   2   4 2 3 2 12 13 20 53 79 125 62 379
Child Maintenance Enforcement Division 1             1 1 6 1 11 21 32 68 65 72 43 322
Social Security Agency       3   1 1 5 1 1   17 30 35 91 152 183 68 588
Total by Month 2 2 2 11 7 8 1 29 24 37 13 84 162 200 559 779 1284 634 3838

Civil Service

Mr K Robinson asked the Minister of Finance and Personnel if (i) a sum of approximately £100 million has been ring fenced from Treasury to address the back pay issue for lower grade Civil Servants following an industrial tribunal judgement in favour of an equal pay claim lodged by NIPSA; and (ii) will he ensure that grades AA to EO2 in the Civil Service will have parity with comparable staff in I.T. and technical grades, when back pay is awarded.

(AQW 7476/09)

Minister of Finance and Personnel: As a result negotiations with the Prime Minister in November 2008, the Executive secured access to £100m to address a range of issues with public expenditure implications, one of which was equal pay.

Officials in the Department of Finance and Personnel are currently in discussion with NIPSA in an effort to establish as clearly as possible the parameters within which a negotiated settlement might be reached so that I, in conjunction with my Ministerial colleagues in the Executive, can consider how the matter should be taken forward.

I am determined that any unlawful inequalities in pay in the NICS, should be put right.

Civil Service

Mr K Robinson asked the Minister of Finance and Personnel (i) when he expects the review of technical grade Civil Servants to be completed; and (ii) is he aware of the impact on the AA to EO2 grade personnel that the delay in resolving their back pay is having, especially during the current economic climate.

(AQW 7480/09)

Minister of Finance and Personnel: The review of technical grades is expected to take around 3 months once the analysts commence their work, with the cooperation of both the unions and staff. I am conscious of the intense interest among Civil Service staff regarding resolution of this issue, but in view of its complexity and also the very significant implications for public expenditure in Northern Ireland, it is important that we deal with it properly.

Civil Service

Mrs D Kelly asked the Minister of Finance and Personnel when will the Civil Servants involved in the equal pay claim receive their back pay.

(AQW 7513/09)

Minister of Finance and Personnel: As discussions with NIPSA are on-going and the equal pay claims already lodged are now the subject of legal processes in the Industrial Tribunal, I am unable to provide any further specific details at present as regards when this matter will be resolved. However, I am keen that the matter is brought to a conclusion as quickly as possible.

Civil Service

Mrs D Kelly asked the Minister of Finance and Personnel if, he has ring fenced, within his budget, the financial settlement required for Civil Servants' equal pay claim.

(AQW 7514/09)

Minister of Finance and Personnel: Officials in the Department of Finance and Personnel are currently in discussion with NIPSA in an effort to establish as clearly as possible the parameters within which a negotiated settlement might be reached so that I, in conjunction with my Ministerial colleagues in the Executive, can consider how the matter should be taken forward. It is only when that process is completed, that I will be in a position to determine the nature of any financial settlement that might be required to resolve this matter.

Office Rent

Mr D McNarry asked the Minister of Finance and Personnel under what circumstances the Civil Service would pay office rent that was significantly above market rental levels.

(AQW 7523/09)

Minister of Finance and Personnel: All Civil Service office procurement decisions whether at market rental levels or higher, require a business case to ensure value for money.

Domestic Ratepayers

Mr J Shannon asked the Minister of Finance and Personnel, since the introduction of capital value in the rating system, what percentage of properties have witnessed an increase in rates payable in (i) Portaferry; (ii) Ards Borough Council area; and (iii) Northern Ireland.

(AQW 7603/09)

Minister of Finance and Personnel:

It is not possible to say exactly what percentage of domestic ratepayers in these areas experienced an increase or decrease in rates payable following the introduction of the capital value system.

Domestic Ratepayers

Mr J Shannon asked the Minister of Finance and Personnel, since the introduction of capital value in the rating system, what percentage of properties have witnessed a decrease in rates payable in (i) Portaferry; (ii) Ards Borough Council area; and (iii) Northern Ireland.

(AQW 7604/09)

Minister of Finance and Personnel:

It is not possible to say exactly what percentage of domestic ratepayers in these areas experienced an increase or decrease in rates payable following the introduction of the capital value system.

Foetal Alcohol Syndrome

Lord Morrow asked the Minister of Finance and Personnel what is the number of fatalities caused by Foetal Alcohol Syndrome in the past two years.

(AQW 7641/09)

Minister of Finance and Personnel: Foetal alcohol syndrome can often be difficult to diagnose, both at birth and later on in life, as it can be difficult to isolate the effects of the syndrome from other factors, particularly those relating to general maternal health during pregnancy and other inequalities that the mother and child may have experienced in the years following the birth.

In Northern Ireland in the years 2007 and 2008P there were no deaths registered where foetal alcohol syndrome1 was listed as a cause of death or where foetal alcohol syndrome was mentioned on the death certificate.

1 International Classification of Diseases, Tenth Revision code Q86.0.

P Provisional data.

Departmental Land

Dr A McDonnell asked the Minister of Finance and Personnel if, in light of the current economic crisis, and with rising fuel and food prices, he has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7646/09)

Minister of Finance and Personnel: The department does not have any plans to release departmental land for the purposes you have outlined.

Civil Service

Ms M Anderson asked the Minister of Finance and Personnel, in relation to the Civil Service Equal Pay issue, to detail (i) the position of the Minister and the Executive; (ii) recent contacts with, and representations to, Trade Union; (iii) recent contacts with, and representations to, the Treasury in Whitehall; (iv) a breakdown of the obstacles preventing an immediate resolution; and (iv) the way ahead.

(AQW 7664/09)

Minister of Finance and Personnel: I met with representatives of the Northern Ireland Public Service Alliance NIPSA on 7 May to discuss the equal pay claims in respect of female members of the NICS. The meeting provided me with the opportunity to hear at first hand the issues of concern to NIPSA and to assure them of my commitment to resolving the Civil Service equal pay issue, if possible, through a negotiated settlement and without the need for litigation.

I have had no further contacts with the Treasury on the matter of NICS Equal Pay since November 2008. However, I do not rule out further discussions with the Chief Secretary on this issue, should that prove necessary.

I have instructed my officials to engage with NIPSA in order to establish the parameters within which a negotiated settlement might be reached so that I, in conjunction with my Ministerial colleagues in the Executive, can consider how the matter should be taken forward. A review of Technical Grades across NI Departments is a necessary part of that process.

However, in parallel with this work, Departments will also be required to respond in due course to equal pay claims that have been lodged with the Industrial Tribunal.

Civil Service

Ms M Anderson asked the Minister of Finance and Personnel, in relation to the Civil Service Equal Pay issue, (i) to comment on complaints raised by trade union representatives and constituents that the his declared commitment to serious negotiations is being frustrated by the actions of officials in senior Civil Service management; and (ii) to confirm a commitment by his Department to the urgent resolution of this issue through meaningful negotiations.

(AQW 7665/09)

Minister of Finance and Personnel: I have instructed my officials to work intensively with NIPSA in order to establish the parameters within which a negotiated settlement might be reached so that I, in conjunction with my Ministerial colleagues in the Executive, can consider how the matter should be taken forward. The review of TG grades that is now to be taken forward as a matter of urgency, is a necessary part of that work but it in no way prevents the current discussions between Civil Service management and NIPSA from continuing, on a without prejudice basis. I regard it as essential that this process continues to move forward with the aim of securing an early resolution to the issue.

I met with representatives of the Northern Ireland Public Service Alliance on 7 May and assured them of my commitment to resolving the Civil Service equal pay issue, if possible, through a negotiated settlement and without the need for litigation.

Credit Cards

Mr T Burns asked the Minister of Finance and Personnel (i) how many credit cards have been issued to his Department's staff for work purposes; and (ii) in relation to punitive bank charges on these cards, (a) how many has there been; (b) the total cost of the charges; and (c) the reasons for the charges, in each of the last five years.

(AQW 7667/09)

Minister of Finance and Personnel: There is one credit card account currently held by the Department of Finance and Personnel, and there are 2 cards issued on it to officials from the DFP Minister’s Office.

In the previous 5 years this is the only account that the Department has operated, with a maximum of 2 cards issued on it at any time.

There have been no punitive bank charges incurred on this account as monthly balances on this account are paid by direct debit to avoid the chance of interest being accumulated.

Alcohol Related Deaths

Mr N McCausland asked the Minister of Finance and Personnel (i) the number of alcohol related deaths; and (ii) the number per 100,000 of the population, for each year since 1991.

(AQW 7675/09)

Minister of Finance and Personnel: The attached table gives the number of alcohol related1 deaths registered in Northern Ireland and the number of alcohol related deaths per 100,000 of the population2 by year, 1991 to 2008P.

1Alcohol related deaths are defined using International Classification of Diseases, Tenth Revision codes F10, G31.2, G62.1, I42.6, K29.2, K70, K73, K74, K86.0, X45, X65 and Y15. The Ninth Revision codes used for alcohol related deaths are 291, 303, 305.0, 425.5, 571 and E860.

2The rate for 2008 is calculated using 2008 projected population. The 2008 mid-year population estimates will be published in July 2009.

P 2008 data is provisional

Table: Number of alcohol related deaths registered in Northern Ireland and the number of alcohol related deaths per 100,000 of the population, 1991 – 2008P.

Registration Year Number of alcohol related deaths Rate per 100,000 Population
1991 105 6.5
1992 95 5.9
1993 96 5.9
1994 118 7.2
1995 120 7.3
1996 141 8.5
1997 152 9.1
1998 158 9.4
1999 174 10.4
2000 190 11.3
2001 206 12.2
2002 238 14.0
2003 214 12.6
2004 255 14.9
2005 246 14.3
2006 248 14.2
2007 283 16.1
2008P 276 15.6

Departmental Land

Dr A McDonnell asked the Minister of Finance and Personnel when the most recent audit of departmental land was undertaken; and how much unused land the Department currently holds.

(AQW 7733/09)

Minister of Finance and Personnel: The Department carried out a review of its buildings and land in December 2008. The Department does not hold any unused land.

Equal Pay Claim

Mr K Robinson asked the Minister of Finance and Personnel, in relation to the Civil Service equal pay claim and the decision to conduct a review of TG1 and TG 2 grades, (i) when the review will be completed; (ii) how many staff are affected; (iii) when payments will be made to staff; and (iv) will the £100 million received from Treasury to facilitate a settlement, and any interest accrued, be allocated to the Civil Servants concerned.

(AQW 7760/09)

Minister of Finance and Personnel: Arrangements are well underway to conduct the review of TG staff with the aim of completing the work by the end of the summer. A sample of between 100 and 150 of posts in the relevant grades will be examined as part of the review. It is still too early to say when this matter will be resolved as discussions with the Trade Union are on-going in order to establish whether a negotiated settlement is possible. No interest will accrue in respect of the £100 million facility I negotiated with the Prime Minister in late 2008, to address the cost pressures faced by the Executive.

Department of Health, Social Services and Public Safety

Patients Discharged from Hospital

Mr P Weir asked the Minister of Health, Social Services and Public Safety what duty of care GPs have to elderly or seriously ill patients discharged from hospital.

(AQW 7452/09)

Minister of Health, Social Services and Public Safety (Mr M McGimpsey): The Health and Social Care Board contracts GP practices, under the terms of the new General Medical Service Contract (GMS), to provide essential services required for the management of their patients and to deliver those services in a manner determined by the practice in discussion with the patient. A GP must provide appropriate ongoing treatment and care, taking into account the specific needs of the registered patients. The GP is also required to provide advice in connection with the patient’s health, including relevant health promotion advice. In addition, if appropriate, the GP is required to liaise with other health care professionals involved in the patient’s treatment and care and, if necessary, refer the patient for any other health or social services.

Patients Discharged from Hospital

Mr P Weir asked the Minister of Health, Social Services and Public Safety what continuity of care is provided for patients following their discharge from hospital.

(AQW 7453/09)

Minister of Health, Social Services and Public Safety:

Health and Social Care Trusts are required to have arrangements in place for the discharge of patients in consultation and collaboration with appropriate hospital and community personnel, and to ensure that these are fully integrated as necessary with community-based assessment and care management arrangements. Trusts are required to ensure that there is clarity with regard to the roles and responsibilities of all professionals involved in discharge arrangements so that timely intervention is provided in accordance with the patient’s assessed need.

The level of care provided following discharge from acute hospital care will depend on the individual patient’s assessed needs.

Integrated Clinical Assessment and Treatment Services

Mr A Easton asked the Minister of Health, Social Services and Public Safety to detail what ICAT( Integrated Clinical Assessment and Treatment Services) does.

(AQW 7503/09)

Minister of Health, Social Services and Public Safety: Integrated Clinical Assessment and Treatment Services (ICATS) are provided by multi-disciplinary teams of health service professionals, including GPs with special interests, specialist nurses and other allied health professionals. ICATS are provided in a variety of primary and secondary care settings and include assessment, treatment, diagnostic and advisory services for patients referred to the service.

ICATS ensures that patients are referred to the most appropriate next step in a defined care pathway. Patients assessed as needing to see a hospital consultant will do so after having had all the necessary diagnostic tests completed.

I am advised that five GPs within the South Eastern Health and Social Services Trust area are taking part in ICATS.

The ICATS service commenced in December 2006, initially dealing only with orthopaedics. The present service covers orthopaedics, ENT, ophthalmology, dermatology, urology and cardiology.

Substantial investment has been available to Boards for the development and implementation of ICATS services. I allocated £2m to support the initial implementation of ICATS in 2006/07 and have increased this allocation to £9m recurrently from 2007/08.

Family Support Workers

Mr P Weir asked the Minister of Health, Social Services and Public Safety how many children currently receive assistance from family support workers in the North Down constituency.

(AQW 7544/09)

Minister of Health, Social Services and Public Safety: As at 11 May 2009, 78 children in the North Down constituency currently receive assistance from family support workers.

Comprehensive Estates Strategy

Mr C Boylan asked the Minister of Health, Social Services and Public Safety if he will require the Southern Health and Social Care Trust to produce a comprehensive estates strategy for the St Luke's site, in consultation with Armagh City and District Council.

(AQW 7557/09)

Minister of Health, Social Services and Public Safety:

I am currently considering the Southern HSC Trust’s efficiency proposals, which involve the relocation of some services currently provided on the St Luke’s hospital site.

The Southern HSC Trust has advised, subject to my decisions on the their proposals and the future of the St Luke’s hospital site, that they will work with local stakeholders, including Armagh City and District Council, to develop a strategic plan for the development of the St Luke’s / Longstone site.

Service Delivery

Mr C Boylan asked the Minister of Health, Social Services and Public Safety if he can ensure that public bodies within his Department consider the impact on the social and economic well-being of the community, when developing proposals for service delivery.

(AQW 7559/09)

Minister of Health, Social Services and Public Safety:

My Department and its related bodies have arrangements in place to ensure appropriate equality impact assessment of proposals for service delivery, in line with the provisions of section 75 of the Northern Ireland Act. This includes the assessment of the extent to which policies and services will have a positive impact on the wellbeing of people. My overriding priority is to improve the health and social well-being of the people of Northern Ireland and reduce health inequalities, so that every member of society can achieve their full potential.

Health Services in Armagh City

Mr C Boylan asked the Minister of Health, Social Services and Public Safety, in relation to the consultation on the proposed future for health services in Armagh City and District Council area, if he is aware of the concerns about the manner in which the consultation was conducted, the quality of the information published by the Southern Health and Social Care Trust, and the level of consideration given to the consultation responses.

(AQW 7560/09)

Minister of Health, Social Services and Public Safety: Concerns have been expressed to me by Council and Assembly representatives for the Armagh area. As with all proposals, I will have the final say and I have not made a decision on those that pertain to Armagh hospitals yet.

Closure of Mullinure Hospital

Mr C Boylan asked the Minister of Health, Social Services and Public Safety if he can give assurances to stakeholders in Armagh City and District unconvinced by the Southern Health and Social Care Trust that the closure of Mullinure hospital is in the interests of the patients that the hospital will not be closed on purely financial grounds and that patients will be put first.

(AQW 7561/09)

Minister of Health, Social Services and Public Safety: The Southern HSC Trust propose that Mullinure will no longer provide non acute inpatient beds it will become a local centre for specialist services for older people and will therefore continue to provide a very valuable resource in supporting the needs of older people in the Armagh area. It is also important to bear in mind that no final decision has been made.

Nut Allergies

Mr J Shannon asked the Minister of Health, Social Services and Public Safety what contact he has had with his counterparts in Westminster and medical staff at Cambridge in relation to the breakthrough addressing nut allergies.

(AQW 7567/09)

Minister of Health, Social Services and Public Safety: Medical advisers in my Department and local allergy specialists are aware of the findings published in the Allergy journal in February 2009. Whilst the preliminary findings are encouraging, the study is still at an early stage and will require further clinical studies before a full evaluation can be made. The research team has emphasised that the treatment should not yet be tried outside of clinical trials.

Cerebral Palsy

Mr D Hilditch asked the Minister of Health, Social Services and Public Safety to detail the suppport services available for parents of children with Cerebral Palsy.

(AQW 7572/09)

Minister of Health, Social Services and Public Safety: There is a wide range of support services available to parents of children with Cerebral Palsy, including social workers, Allied Health Professionals working in multidisciplinary teams, Community Children’s Nurses, as well as family outreach support. Parents may also avail of Direct Payments which increase choice and promote independence and provide more flexible arrangements than may otherwise be possible for the service user, parents and carer. Parents can avail of Respite Care, which includes domiciliary care, short breaks and residential care. By 2011 an additional 200 packages of respite care will be provided for children and adults with a physical and/or sensory disability, including those with Cerebral Palsy. Furthermore, in February 2009, I announced an investment of £9m over three years to improve community services and support for children with complex physical needs and their families.

Cerebral Palsy

Mr D Hilditch asked the Minister of Health, Social Services and Public Safety what steps his Department is taking to improve the quality of life for children who have Cerebral Palsy.

(AQW 7573/09)

Minister of Health, Social Services and Public Safety: I am committed to improving the lives of all children and young people with disabilities, including those with Cerebral Palsy. My Department is currently developing a draft Physical and Sensory Disability Strategy, which will consider the needs of adults and children with disabilities, including those children with Cerebral Palsy. The emphasis of the strategy, which will be ready for consultation by the end of 2009, will be to help those with a physical and/or sensory disability to lead as full and inclusive lives as possible in society.

Mobile Phone Base Stations

Mrs I Robinson asked the Minister of Health, Social Services and Public Safety (i) how many people have died from cancer during the last five years; (ii) if proximity to mobile base phone stations was a factor in any of these deaths; and (iii) what measures are being taken by his Department to monitor the proximity of mobile phone base stations in the diagnosis of new cancer cases.

(AQW 7594/09)

Minister of Health, Social Services and Public Safety: The number of cancer deaths in the last five years is presented in the table below.

Registration Year

Number of Deaths

2004

3,757

2005

3,735

2006

3,848

2007

3,870

2008

3,971

There is no evidence available of a direct causal relationship between mobile phone masts and cancer deaths. The Northern Ireland Cancer Registry (NICR), funded by my Department, has responsibility to monitor the incidence and mortality of cancer in Northern Ireland, and investigate any potential cancer clusters around mobile phone masts. My Department also contributes to the funding of the UK Mobile Telecommunications and Health Research (MTHR) programme which was set up in 2001. To date, neither the work of NICR nor the MTHR programme has provided any evidence that proximity to telecommunication masts increases the risk of cancer.

Palliative Care

Lord Morrow asked the Minister of Health, Social Services and Public Safety to detail the provision of palliative care currently provided at South Tyrone Area Hospital, and if there are any plans to have this expanded.

(AQW 7622/09)

Minister of Health, Social Services and Public Safety: Patients with palliative care needs at the South Tyrone Hospital are supported by a multidisciplinary team, consisting of doctors, nurses and allied health professionals. Patients also have access to a weekly outpatient clinic, led by a palliative care consultant.

In addition, there are two Macmillan specialist nurses working in the Armagh and Dungannon area, providing domiciliary care to patients with a cancer diagnosis. The Southern Health and Social Care Trust is currently working with the Southern Area Hospice to develop an additional palliative care specialist nurse post to work in this area, as well as establishing a day therapy unit on the hospital site.

Foetal Alcohol Syndrome

Lord Morrow asked the Minister of Health, Social Services and Public Safety what the number of diagnosed cases of Foetal Alcohol Syndrome is in the last two years.

(AQW 7624/09)

Minister of Health, Social Services and Public Safety: The information requested is not available.

Foetal alcohol syndrome (FAS) is a difficult condition to diagnose accurately because of the wide range of symptoms with which it can present. These signs and symptoms can be indicative of other conditions such as behavioural problems. In addition there are also difficulties associated with ascertaining or establishing the mother’s alcohol intake before and during pregnancy.

Departmental Land

Dr A McDonnell asked the Minister of Health, Social Services and Public Safety if, in light of the current economic crisis, and with rising fuel and food prices, he has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7647/09)

Minister of Health, Social Services and Public Safety: I currently have no plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

Current policy is that any surplus land will be sold at the best price that can reasonably be obtained. These sales proceeds are then re-invested in my Department’s capital programme.

Victimisation

Lord Morrow asked the Minister of Health, Social Services and Public Safety what guarantee can he give that nurses and medical staff who report patient welfare issues will not suffer victimisation.

(AQW 7659/09)

Minister of Health, Social Services and Public Safety: Health and Social Care staff who raise concerns responsibly and reasonably are given statutory protection against victimisation under the Public Interest Disclosure (Northern Ireland) Order 1998.

Royal Victoria Hospital

Mr G Robinson asked the Minister of Health, Social Services and Public Safety, pursuant to AQW 7331/09, to confirm that the Royal Victoria Hospital is not exempt from inspection by the Belfast City Council Health and Environmental Services Department.

(AQW 7722/09)

Minister of Health, Social Services and Public Safety: The Royal Victoria Hospital is not exempt from inspection by the Belfast City Council Environmental Health Department.

Medical Students

Mr D Bradley asked the Minister of Health, Social Services and Public Safety, what arrangements are in place for prospective medical students to engage in work shadowing in hospitals, as a number of university medical facilities have this as a prerequisite for entrance.

(AQW 7821/09)

Minister of Health, Social Services and Public Safety:

The only Medical School in Northern Ireland, the Queens University of Belfast, does not require applicants to undertake work shadowing experience in a clinical environment prior to admission to study medicine, therefore no arrangements are required.

Department for Regional Development

Safety Procedures on Trains

Mr A Ross asked the Minister for Regional Development what additional safety procedures have been implemented following the serious safety breach on a train on the Larne line on 5 February 2009.

(AQW 7276/09)

Minister for Regional Development (Mr C Murphy):

The door mechanism of the Class 80 trains is safe if operated according to proper procedures. The mechanism has been approved for use by HM Railway Inspectorate. The incident on 5 February occurred because staff failed to implement the correct procedures properly. Translink has confirmed that all relevant rail staff have been briefed again on the correct procedure for the dispatch of trains from stations. It further advises that staff performance will continue to be monitored.

Maintenance of Trains

Mr A Ross asked the Minister for Regional Development how much money has been spent on maintenance of trains used on the Larne Line, and how this compares with other trains on the NIR network.

(AQW 7446/09)

Minister for Regional Development:

Translink have provided me with the following information regarding the maintenance cost of the Larne line trains compared to the maintenance cost of trains on the other local lines.

2006/2007 Total Train MaintenanceCost Cost per train mile
Larne Line (Class 450) £2,102,544 £4.39
Other local lines (Class 3000) £3,081,406 £1.78
     
2007/2008    
Larne line (Class 450) £1,854,630 £3.87
Other local lines (Class 3000) £3,324,815 £1.66
     
2008/2009    
Larne line (Class 450) £2,154,194 £4.50
Other local lines (Class 3000) £3,643,294 £1.80

Train maintenance costs include all labour and materials for heavy and running maintenance plus overhaul work. Consequently, maintenance costs for the older Class 450 stock are higher than the still relatively young Class 3000’s.

Maintenance of Trains

Mr A Ross asked the Minister for Regional Development how much money has been spent on trains, lines and stations in East Antrim over the last 3 years, and how this compares with other areas.

(AQW 7447/09)

Minister for Regional Development:

Translink have provided me with the following information regarding the maintenance cost of the Larne line trains compared to the maintenance cost of trains on the other local lines over the last three years.

2006/2007 Total Train MaintenanceCost Cost per train mile
Larne Line (Class 450) £2,102,544 £4.39
Other local lines (Class 3000) £3,081,406 £1.78
     
2007/2008    
Larne line (Class 450) £1,854,630 £3.87
Other local lines (Class 3000) £3,324,815 £1.66
     
2008/2009    
Larne line (Class 450) £2,154,194 £4.50
Other local lines (Class 3000) £3,643,294 £1.80

Train maintenance costs include all labour and materials for heavy and running maintenance plus overhaul work. Consequently, maintenance costs for the older Class 450 stock are higher than the still relatively young Class 3000’s.

Capital

Translink have also provided me with the following information regarding capital expenditure on lines and stations in East Antrim.

Project Name 2006/07 2007/08 2008/09 2009/10(Projected Spend)
Magheramorne Passing Loop     £196 £416,150
UB424 Carrickfergus- Edge Beams   £10,332 £13,114 £2,552
Downshire to Whitehead Sea Defence Strengthening - Section 1     £738,037 £181,563
Downshire to Whitehead Sea Defence Strengthening - Section 3   £420,385 £178,441  
Track Condition Retention Programme - Larne Line     £334,737 £145,250
Carrickfergus P&R   £91,292    
Whiteabbey P&R £16,301 £6,074 £13,537 £377,001
Greenisland P&R     £150,539  
Jordanstown Halt P&R £10,881 £2,117 £22,983  
Whitehead P&R £7,473 £2,273 £111,548  
Magheramorne Train Radio Signal Booster     £24,138  
Bleachgreen to Whitehead Relay £62,658      
Total £97,313 £532,473 £1,587,270 £1,122,516
Projects which include expenditure in East Antrim
New Trains Two     £16,500,000 £12,500,000
Train Protection and Warning System £2,343,510 £17,840    
Total Capital Outturn for Rail £10,633,070 £27,377,790 £36,050,046 £36,100,000

In relation to comparison with other areas, assuming that the query relates to other constituencies, there was insufficient time available to extract relevant data. However, the table above also includes total capital expenditure on railways.

Roads Service

Dr S Farry asked the Minister for Regional Development to outline the Roads Service policy on the provision of hitching posts for horses in rural areas.

(AQW 7459/09)

Minister for Regional Development: My Department’s Roads Service has advised that it has no policy for the provision of hitching posts for horses in rural areas.

Aviation Inquiry

Dr S Farry asked the Minister for Regional Development if any evidence has been provided to the House of Commons Transport Select Committee in relation to its current inquiry into aviation.

(AQW 7460/09)

Minister for Regional Development:

My Department has not been asked by the Transport Select Committee to submit evidence nor has it offered any evidence to this inquiry, which relates mainly to aviation matters that are not the responsibility of the devolved administration.

Road Realignment Measures

Dr S Farry asked the Minister for Regional Development to provide an update on timescales for the introduction of road realignment measures across the Craigantlet Hills.

(AQW 7462/09)

Minister for Regional Development:

My Department’s Roads Service has advised that it is currently assessing a number of options to improve safety and the flow of traffic in the Craigantlet Hills area. Once this assessment is completed and an optimum layout has been identified, detailed design will be undertaken, which will allow the statutory processes to commence. However, taking into account the timescale required to develop and complete these procedures, it is unlikely that improvement works could commence before 2011.

I should further advise that the inclusion of any potential scheme for the Craigantlet Hills area, on a future works programme, would be subject to the various competing priorities, as well as the availability of the necessary land and finance.

Roads Service

Mr P Weir asked the Minister for Regional Development what compensation is available to commercial premises for loss of trade as a result of disruption caused by the work of Roads Service.

(AQW 7469/09)

Minister for Regional Development:

Compensation, subject to one exceptional situation, is not ordinarily payable to the owners of commercial premises for loss of trade due to disruption by the works of Roads Service or, indeed, other utilities or parties or their contractors. This loss is in law referred to as "economic loss". The general legal principle is that there is no entitlement to economic loss.

The exception to the general legal principle occurs where it is established that economic loss has arisen out of physical damage caused to the commercial premises in the course of the works and where such loss is capable of being quantified and proved in accordance with usual legal requirements.

Every claim for loss of trade is considered on its own facts and merits against these established legal principles.

Roads Service

Mr P Weir asked the Minister for Regional Development what notification is given by Roads Service to commercial premises when work is about to commence on the road on which they are situated.

(AQW 7471/09)

Minister for Regional Development:

My Department’s Roads Service arrangements for notifying commercial premises will vary according to the nature of works being completed. Where a roads scheme will cause traffic disruption, or inconvenience is expected to be prolonged, notification is provided by means of:

When completing routine short term maintenance work, such as gully emptying and patching and the disruption to traffic is expected to be minimal, no notification is generally provided.

Public Procurement Contracts

Ms J McCann asked the Minister for Regional Development to detail the companies that were successful in securing public procurement contracts in works, services and goods through his Department, in the last two years and the percentage of these that were from the SME or the Social Economy sectors.

(AQW 7484/09)

Minister for Regional Development:

I attach a list of companies that were successful in securing public procurement contracts in works, services and goods through my Department in the period 1 April 2007 to 31 March 2009. The information on status has largely been provided by the companies themselves and has not been verified by the Department. It has not been possible to ascertain the status of all the companies involved.

Contracts were let to 122 companies. From the information available, I can confirm that (96) 79% were from the Small and Medium Enterprise sector and (2) 2% were from the Social Economy Sector.

Company SME Social Economy Sector
Abco Divers Ltd  ü  
Advance Coaching ü  
Anderson Fuels ü  
Atkins NEITHER
Balfour J & Sons Ltd ü  
Ballentine J&T (Sales) Ltd ü  
BC Plant Ltd ü  
BDO Stoy Hayward ü  
Belfast & Down Oil Supplies  ü  
Belfast City Council NEITHER
Blyth Bridges Marine Consultants Ltd ü  
Booz Allen & Hamilton Ltd UNKNOWN
Bradley Patrick Ltd ü  
BRC Partnership ü  
Bridge Accessible Transport Enterprises   ü
British Telecom NEITHER
Castle catering ü  
Clearview Traffic Group ü  
Colleen Bros Quarries Ltd ü  
Commercial Graphics, Greenway Industrial Estate ü  
Conor McClean ü  
CPCR Ltd ü  
Crozier W J ü  
Cybertrust NEITHER
David Robinson Associates UNKNOWN
Disability Action Tradable Services   ü
Driver Hire Ltd/Driver Hire Foil ü  
E J Magee ü  
Edentrillick Quarries Ltd ü  
Engineering Distributors ü  
Entec (UK) Ltd NEITHER
EOS Systems ü  
Eward J. Magee ü  
Excite Exhibition and Display ü  
Experian Ltd NEITHER
Fire IMC ü  
Fox Building & Engineering Ltd ü  
FP McCann NEITHER
Francis Dunn ü  
Fugro-BKS Ltd ü  
GB Electrics ü  
Gibson (Banbridge) Ltd ü  
Goldblatt McGuigan ü  
Gordons Electrical Supplies ü  
GPS Colour Graphics ü  
Graham & Heslip ü  
Herbert Smith NEITHER
Hogg R & Sons Ltd ü  
Holiday Inn Belfast NEITHER
Impression Print & Design ü  
Impro Printing ü  
Inform Communications ü  
James Balfour ü  
John Graham (Dromore) Ltd NEITHER
John Hagan Ltd Builders Supplies  ü  
John Hunter Belfast ü  
John McQuillan (Contracts) Ltd ü  
Keenan Patrick - Magherafelt ü  
Kennedy & Morrison  ü  
Kennedy Recruitment ü  
Kilkeel Steel Products ü  
KPL Contracts ü  
KPMG ü  
Lagan Construction (Ltd) NEITHER
Lagan Ferrovial Agroman NEITHER
Leica Geosystems Ltd UNKNOWN
M & P Bradley ü  
McCallan Bros Ltd NEITHER
McClure Watters UNKNOWN
McLaughlin & Harvey Ltd NEITHER
MFV Swiftsure Donaghadee ü  
Minprint ü  
Miskelly Bros Ltd ü  
Mitten R J & Sons ü  
Morrow Group ü  
Mrs Maire Young ü  
N McMullan & Son ü  
Nelsons Boats and Marine Services  ü  
Neueda ü  
NI Fish Producers Organisation Ltd  ü  
Nicholson & Bass, Newtownabbey ü  
Noilin Nic Bhloscaidh ü  
Northern Whig ü  
Northstone NI Ltd ü  
Norwest Holst Ltd ü  
Oakdene Services ü  
ORICA Blast & Quarry Surveys ü  
Oxford Economics ü  
Patrick Bradley Ltd ü  
Patrick Keenan ü  
Pentagon Solutions ü  
Pod Print Ltd ü  
PriceWaterhouseCoopers ü  
Printsol NI Ltd ü  
Rathlin Island Ferry Ltd ü  
Road Safety Contracts Ltd ü  
Rodgers Contracts Ltd ü  
Roger Tym & Partners ü  
Rubber Stamp Company ü  
RW Pierce ü  
Salt Sales Co UNKNOWN
Sam Hutchinson & Co ü  
Six West ü  
Sky High Technology Ltd UNKNOWN
Soil Mechanics ü  
Sopra Group Ltd ü  
SPSS NEITHER
Sureskills Ltd ü  
Symology ü  
Tarmac Quarry Products Ltd UNKNOWN
The TAS Partnership Limited ü  
Thorn Lighting Ltd UNKNOWN
Total Boat Kinnego Marina  ü  
Tullyraine Quarries Ltd ü  
W & G Baird, Antrim ü  
W J McCormick & Sons Ltd ü  
W McKay & Sons Ltd ü  
Watts Group PLC ü  
WDM Limited ü  
Wells Tyres Batteries Exhausts & Auto Servicing  ü  
White Mountain Quarries ü  
Willis UNKNOWN

Bus Stop Signs

Mr D McKay asked the Minister for Regional Development how many bus stop signs and timetables have been erected in the North Antrim constituency over the past 12 months.

(AQW 7489/09)

Minister for Regional Development:

Provision of bus stops and timetables is an operational matter for Translink. The table below sets out the number of bus stop signs and timetables that have been erected in the North Antrim Constituency in the last 12 months. It should be noted that these figures include new bus stops and those refurbished due to damage.

Location Standard bus stop flag Enhanced bus stop flag Timetable
Ballymena 120 114 50
Ballycastle 20   5
Ballymoney 10   4
Dunloy 8   4
Rasharkin 8 4  
Cushendall 4 2  
Cushendun   2 2
Ahoghill 10   2
Total 180 122 67

Note: A standard bus stop has the normal service flag. An enhanced flag has the stop name and route number.

Translink

Mr T Burns asked the Minister for Regional Development to detail the number of accidents involving Translink buses in the last five years, broken down by bus type.

(AQW 7509/09)

Minister for Regional Development:

Translink has informed me that it does not hold the information in the form requested. The table below shows the number of accidents involving Translink buses in each of the last five financial years.

BUS ACCIDENTS 04/05 - 0809

YEAR

ULSTERBUS

CITYBUS/METRO

TOTAL

2004/05 898 474 1372
       
2005/06 834 516 1350
       
2006/07 1076 516 1592
       
200/708 966 583 1549
       
2008/09 906 591 1497
       
TOTAL 4680 2680 7360

Senior Civil Servant Bonuses

Mr P McGlone asked the Minister for Regional Development how much was paid in bonuses to senior Civil Servants in his Department in (i) 2003/04; (ii) 2004/05; (iii) 2005/06; (iv) 2006/07; and (v) 2007/08.

(AQW 7537/09)

Minister for Regional Development: The total amount paid during each of the years in question was as follows:

2003/04: £47,500

2004/05: £72,250

2005/06: £91,000

2006/07: £87,000

2007/08: £90,250

There is widespread public anger at the large bonuses being paid to public servants who are already in receipt of substantial incomes. As Minister, I share this concern and want a review to be undertaken on this matter.

Vehicles Damaged by Potholes

Mr D McClarty asked the Minister for Regional Development in relation to vehicles damaged by potholes in the East Londonderry constituency, (i) how many compensation claims have been received by his Department; and (ii) how much money has been paid out in compensation in each of the last five years.

(AQW 7554/09)

Minister for Regional Development:

Unfortunately, my Department’s Central Claims Unit does not hold the information in the format requested. However, Central Claims Unit does maintain a record of compensation claims details for each Roads Service Section Office. The area of the East Londonderry constituency includes all of the Coleraine and Limavady Section Offices plus two Wards which fall within the Derry Section Office area. The following figures show the number of compensation claims received and the amounts of compensation paid by the Central Claims Unit for each of the last five financial years in respect to damage to motor vehicles caused by potholes in the Coleraine and Limavady Section Office areas. Disaggregation of the Derry Section Office figures to isolate the two Wards within the East Londonderry constituency could only be extracted at disproportionate cost.

  No.of Claims Received Compensation Paid
2008/2009    
Coleraine Section Office 35 £2,364.02
Limavady Section Office 3 £578.20
TOTAL 38 £2,942.22
2007/2008    
Coleraine Section Office 26 £577.98
Limavady Section Office 5 £796.39
TOTAL 31 £1,374.37
2006/2007    
Coleraine Section Office 22 £1,456.30
Limavady Section Office 11 £238.52
TOTAL 33 £1,694.82
2005/2006    
Coleraine Section Office 24 £3,382.10
Limavady Section Office 2 £35.50
TOTAL 26 £3,417.60
2004/2005    
Coleraine Section Office 13 £329.49
Limavady Section Office 9 £523.00
TOTAL 22 £852.49

Speed Limits in East Belfast

Mr R Newton asked the Minister for Regional Development if he intends to put in place a restricted speed limit of 20 mph within the Cameronian Drive and surrounding areas of the East Belfast constituency.

(AQW 7565/09)

Minister for Regional Development:

My Department’s Roads Service has advised that 20mph zones are an extension of traffic calming schemes. As such, they are generally implemented in residential areas, where there is an extensive network of streets, and self-enforcing measures are in place to reduce vehicle speeds to approximately 20mph.

Roads Service receives many requests for traffic calming schemes and, as demand greatly exceeds the capacity to supply these measures, all proposals are required to be assessed, scored and prioritised.

An assessment of the Cameronian Drive area has been carried out, as requested by the Member. Unfortunately, this has indicated that it would not be highly placed in relation to other competing schemes, which are already in Roads Service’s traffic calming programme. Therefore, Roads Service does not have any plans to provide a 20 mph speed limit in this area, at this time.

Road Calming Measures in East Belfast

Mr R Newton asked the Minister for Regional Development if he plans to introduce road calming measures within the Cameronian Drive area of the East Belfast constituency.

(AQW 7566/09)

Minister for Regional Development:

My department’s Roads Service has advised that it receives many requests for traffic calming schemes. As demand greatly exceeds the capacity to supply these measures, all proposals are required to be assessed, scored and prioritised.

An assessment of the Cameronian Drive area has been carried out, as requested by the Member. Unfortunately, this has indicated that it would not be highly placed in relation to other competing schemes, which are already in Roads service’s traffic calming programme. Therefore, Roads Service does not have any plans to provide a traffic calming scheme in this area, at this time.

Translink

Mr D Hilditch asked the Minister for Regional Development for his assessmant of the impact of Translink's price increases on the usage of the Larne to Belfast train and bus routes.

(AQW 7574/09)

Minister for Regional Development:

The average fares increases are 2% for bus travel and 3% for rail.

Under Translink’s proposals, cash fares would be increased, but most multi journey ticket prices would remain at present levels. This would provide positive benefits for regular public transport users on the Larne route by encouraging the use of pre-paid tickets, the use of which reduces boarding times and keeps buses running on schedule. Overall Regional Transportation targets for passenger levels are expected to be maintained during 2009/2010.

Bus Stop Signs

Mr P Weir asked the Minister for Regional Development how many bus timetables and bus stop signs have been ereected in the North Down constituency over the past 12 months.

(AQW 7586/09)

Minister for Regional Development:

Provision of bus stops and timetables is an operational matter for Translink. The table below sets out the number of bus stop signs and timetables that have been erected in the North Down Constituency in the last 12 months. It should be noted that these figures include new bus stops and those refurbished due to damage.

LOCATION Standard bus stop flag Enhanced bus stop flag Timetable
Bangor 121 217 70
Holywood 8 0 2
Donaghadee 5 0 1
Millisle 8 0 2

Note: A standard bus stop has the normal service flag. An enhanced flag has the stop name and route number.

Road Junctions

Mr T Burns asked the Minister for Regional Development to detail (i) the 20 busiest road junctions, intersections or roundabouts in terms of traffic volume (not congestion); and (ii) the average traffic flow at these locations on a daily basis.

(AQW 7589/09)

Minister for Regional Development:

My Departments Roads Service has advised that traffic flows at individual road junctions are generally only measured if there is a specific reason to do so. However, as part of the Annual Traffic Census, traffic surveys are carried out on strategic and other specified routes.

The table below details the Annual Average Daily Traffic (AADT) at the North’s 20 busiest routes, or links along a route, in terms of traffic volume, as recorded in the Annual Traffic Census, together with an indication of the key junctions on each route.

Route
No.

Road
Number

Road Description

Busiest Links

24 HR AADT (7 Day)

Major Junctions (Jct)

1

M2

York Street to Dunsilly Jct 1 M22

Greencastle (Junction 2) – Sandyknowes

59,520

 

 

 

York Street/M3 Jct

Fortwilliam Interchange

Jct Greencastle / M5

Jct Sandyknows / A8(M)

Jct Templepatrick

Jct Rathbeg, Jct M22

 

 

Fortwilliam Interchange – Inbound

50,430

Fortwilliam Interchange – Outbound

45,000

Sandyknowes (Junction 4) – Templepatrick

42,320

Rathbeg (Junction 6) – Templepatrick (Junction 5)

40,500

Rathbeg (Junction 6) – Dunsilly M22 (Jct 11)

35,040

2

A2

Belfast to Bangor

Sydenham By-Pass, at Airport

55,730

Dee St/M3 Jct, Tillysburn Jct, Ballyrobert Road Jct

A2 at Seahill Road

Holywood By-Pass, east of Belfast Road

43,970

Belfast - Bangor, at Cultra, east of Folk Museum

38,020

Belfast - Bangor, at Springhill

24,300

 

Derry

Strand Road

 35,920

 

Jct Buncranna Rd, Jct Foyle Embankment

Jct Crescent Link Roundabout, Jct Broad

Bridge, Jct Carlisle Road, Jct Duke Street

Jct Culmore Rd Round-about, Jct Strand Road Roundabout

Jct Strand Road Round-about, Jct Foyle Embankment

Limavady Road

27,970

Craigavon Bridge

25,240

Culmore Road

22,350

Queen's Quay

22,230

 

Belfast to Carrickfergus

 

Carrickfergus - Belfast

 

25,950

 

Jct M5, Jct Station Road (B513), Jct Jordanstown Road, Jct Station Rd (B90), Jct Davy's St (B90 at Roundabout.

3

M1

Broadway to Ballynacor

Blacks Road - Saintfield Road (Junction 6)

54,100

Jct Blacks Road, Jct Saintfield Road

 

Jct A12 Westlink, Jct Stockmans Lane

Jct Moira, Jct Lough Rd, Jct Ballynacor

Sprucefield, Jct Blaris (A101)

Broadway - Stockman's Lane

43,590

Lough Road (Junction 10) – (Ballynacor Junction 11)

35,420

Sprucefield (Junction 7) – Moira (Junction 9)

35,260

4

A1

Belfast to Newry

Lisburn – Hillsborough

39,510

Jct Sprucefield, Jct A101

Jct B77 at Hillsborough

Jct B2-Lurgan, Jct A50 at Banbridge

Jct Armagh Road, Jct Dublin Road

Stockmans Lane/Balmoral Ave Jct

Hillsborough By-Pass,

30,790

Dromore – Banbridge,

27,280

Newry By-Pass (Stage 2)

26,190

Lisburn Road, Belfast, at King's Hall

23,470

Banbridge By-Pass,

22,160

Jct A50 at Banbridge

5

A55

Outer Ring Road Belfast

Upper Knockbreda Road, Belfast

39,210

Jct A24 Saintfield Rd / Upper Galwally

Jct A55 Malone Road at House of Sport

Jct A20 Upper Newtownards Road, Jct Parkway

Shaws Bridge, Belfast

31,650

Parkway, Belfast

22,620

6

A12

Westlink

Clifton Street, towards M2

35,350

Jct M2/M3/York St, Jct Clifton St

Jct Divis Street, Jct Broadway, M1

Clifton Street, towards M1

28,900

7

M5

Belfast to Whiteabbey

Greencastle - Whiteabbey

32,650

Jct M2 at Greencastle, Jct A2 Shore Road

8

A515

Foyle Bridge Derry

At Foyle Bridge

31,520

Jct Roundabout Madamsbank Rd, Jct Culmore Road Roundabout.

9

A26

Antrim to Ballymoney

Antrim - Ballymena, North of Dunsilly

30,950

Jct M2 at Antrim,

Jct M2 at Ballymena Ballykeel Rd

Jct M2 at Ballymena (north)

Ballymena - Ballymoney, north of M2

21,510

10

A24

Belfast to Carryduff

At Baronscourt

30,570

Jct A55 Ring road,

Jct A27 Saintfield Rd

Jct Carinshill road

At Saintfield Road

27,320

11

A29

Coleraine

Coleraine Ring Road,

29,370

Jct Dunhill Road

Roundabout,

Jct Newbridge Road

Jct Ballycastle Road Roundabout

Coleraine Ring Road,

22,250

12

A3

Portadown

Northway, Portadown,

28,340

Jct Mill Ave, Jct A3 Craigavon 

13

A6

Dungiven Road Derry

Dungiven Road

27,760

Jct A514 Crescent Link

Jct Shephards Glen roundabout

Dungiven Road

26,820

14

A501

Falls Road

Falls Road between Springfield Road and Broadway

26,170

Jct A55 Kennedy Way, Jct Whiterock Road, Jct Broadway

15

A20

Dundonald to Newtownards

Upper Newtownards Road at Quarry Inn

23,820

Jct A20 Kempstone Road, Jct Dunlady Rd

16

A514

Crescent Link Derry

Crescent Link at Caw

23,630

Jct Glenshane Road Roundabout

17

B507

Branch Road Derry

Branch Road at Branch Road Roundabout

22,300

Jct Branchroad Roundabout

18

A5

Omagh Throughpass

Omagh Throughpass

21,420

Jct Tamlaght Road

Omagh By-Pass, at footbridge

21,270

19

A513

Dunmurry

At Wilmar Road

21,290

Jct Princewilliam Road, Jct McKinstry Road

20

A25

Newry

Camlough, at Egyptian Arch

20,900

Jct Craigmore Way

Roads Maintenance Projects in Ards

Mrs I Robinson asked the Minister for Regional Development to detail (i) the road maintenance projects completed in the Ards Peninsula area; and (ii) the amount of money invested in such projects for each of the last five years.

(AQW 7592/09)

Minister for Regional Development:

It is assumed that when you refer to road maintenance projects, this relates to road resurfacing schemes.

On this basis, the table below details the expenditure and lists all roads in the Ards Peninsula area which were resurfaced during the last five financial years.

ANNUAL EXPENDITURE ON RESURFACING SCHEMESIN THE ARDS PENINSULA
Financial Year Resurfacing Scheme
2008/09 New Road, Donaghadee
Greyabbey Road, Ballywalter
Bowtown Road (1), Newtownards
Bowtown Road (2), Newtownards
Ballyblack Road East, Newtownards
Portaferry Road, Cloughey
Mountstewart Road, Newtownards
Main Road, Portavogie
Rubane Road, Kircubbin
Kircubbin Road, Cloughey
Grangee Crossroads
Total Resurfacing Expenditure 2008/09 - £821,000
Year Resurfacing Scheme
2007/08 A2 Portaferry Road, Cloughey (Watson’s Garage – Loughdoo Road)
Ballyphillip Road, Portaferry (Cloughey Road – Ballyblack Road)
Victoria Road, Ballyhalbert (Main Road – The Moatlands)
Springvale Road, Ballywalter (Strand Park – Kircubbin Road)
Greyabbey Road, Ballywalter (At Ballyatwood Road junction)
Bowtown Road, Newtownards (Stanwell Road – 30 MPH Signs)
Bowtown Road, Newtownards (30 MPH Signs – Lougheries Road)
Ballyblack Road East, Newtownards
C254 Finlay’s Road, Newtownards
Mountstewart Road, Newtownards (Portaferry Road – McCullough’s Corner)
Total Resurfacing Expenditure 2007/08 - £997,000
Year Resurfacing Scheme
2006/07 High Street / Victoria Road, Ballyhalbert (Moatlands – Post Office)
Movilla Road, Newtownards
A2 Portaferry Road, Cloughey (Watson’s Garage – Loughdoo Road)
Ballyphillip Road, Portaferry (Cloughey Road – Ballyblack Road)
Victoria Road, Ballyhalbert (Main Road – The Moatlands)
Springvale Road, Ballywalter (Strand Park – Kircubbin Road)
Total Resurfacing Expenditure 2006/07 - £572,000
Year Resurfacing Scheme
2005/06 A20 Main Street, Kircubbin (Blackhall Street – Roden Street)
Mountstewart Road, Carrowdore (At McCullough’s House)
Bog Road, Portavogie
A48 Newtownards Road, Donaghadee (Bailie Road – Hogstown)
A2 Shore Road, Ballyhalbert (At Caravan Park)
Ballyblack Road East, Newtownards
C253 Killaughey Road, Donaghadee
Movilla Road, Newtownards
Total Resurfacing Expenditure 2005/06 - £455,000
Year Resurfacing Scheme
2004/05 Ballywalter Main - Street Stage 1 (Stump Road – The Square)
  A20 Main Street, Kircubbin (Blackhall Street – The Green)
  Main Street, Greyabbey (Mini Roundabout – School)
  Manor Street, Donaghadee
  Cloughey Road, Portavogie
  A20 Rowreagh Road at Ardkeen (End of Asphalt – ‘S’ Bends)
  A48 Cotton Road, Newtownards
  Mountstewart Road, Carrowdore (At McCullough’s House)
Total Resurfacing Expenditure 2004/05 - £146,000

Roads Maintenance Projects in Ards

Mrs I Robinson asked the Minister for Regional Development to detail roads maintenance projects which are currently scheduled for commencement or completion in the Ards Peninsula area.

(AQW 7595/09)

Minister for Regional Development:

My Department’s Roads Service’s budget allocation for the Ards council area is currently being finalised, after which the proposed work programmes can be confirmed. Details of the work programmes will then be presented to the council in the Roads Service Report at the Spring meeting with Ards Borough Council, which is scheduled for the 22 June 2009.

Following this meeting, the Council report will be available to view online at the following web address:

http://www.roadsni.gov.uk/index/publications/publications-council_reports.htm

Crockanboy Road, Greencastle, Omagh

Mr P Doherty asked the Minister for Regional Development to outline what plans his Department has to address the dangerous condition of the Crockanboy Road, Greencastle, Omagh.

(AQW 7621/09)

Minister for Regional Development: My Department’s Roads Service has advised that the Crockanboy Road is maintained in accordance with their Roads Maintenance Standards, and would therefore not consider it to be in a dangerous condition.

I am further advised that three sections of the Crockanboy Road, from Gortin to the Cookstown Road, were substantially reshaped in April 2009 and other minor patching is currently underway in preparation for a future surface dressing scheme.

Crockanboy Road, Greencastle, Omagh

Mr P Doherty asked the Minister for Regional Development to give an indicative timeline for commencement and completion of work to improve the condition of the Crockanboy Road, Greencastle, Omagh.

(AQW 7623/09)

Minister for Regional Development:

As I advised the Member in my response to his Assembly Question, AQW 7621/09, three sections of the Crockanboy Road from Gortin to the A505, Cookstown Road, were substantially reshaped in April 2009 and other minor patching is currently underway in preparation for a future surface dressing scheme. Roads Service has advised that it is expected that the surface dressing will be finished by the end of July 2009, however, this will be dependent on the weather conditions.

Departmental Land

Dr A McDonnell asked the Minister for Regional Development if, in light of the current economic crisis and with rising fuel and food prices, he has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7704/09)

Minister for Regional Development:

My Department’s Roads Service has advised that any lands it declares surplus to requirements, must be disposed of in line with guidelines set down by the Department of Finance and Personnel, Land and Property Services (LPS). Therefore any such proposal, in relation to surplus land would require LPS endorsement. However, land being held for future road schemes can, as an interim measure, be let provided the timing of the road scheme permits.

Northern Ireland Water has advised that while it has no plans to release any of its land for the purposes of growing food, it does help sustain farming in the North, by leasing land on a commercial basis to local farmers, for grazing sheep and cattle.

Door to Door Transport Scheme

Mr S Gardiner asked the Minister for Regional Development for the number of members of the Door to Door Transport Scheme in (i) Lurgan; (ii) Portadown; and (iii) Banbridge.

(AQW 7745/09)

Minister for Regional Development:

On 15 May 2009 there were 80 members of the Door-to-Door Transport scheme in the Lurgan operational area, 104 members in the Portadown operational area, and 61 members in the Banbridge operational area.

M5 Safety Barrier at Greencastle

Mr K Robinson asked the Minister for Regional Development, pursuant to AQW 7051/09, in light of previous accidents on the citybound section of the M5, which resulted in fatalities, to explain why no barrier is required to protect vehicles from leaving the carriageway, crossing an unprotected pedestrian and cycle route and facing the water hazard represented by Belfast Lough.

(AQW 7758/09)

Minister for Regional Development:

I understand that your question has been revised to relate to the "city bound" section of the M5.

My Department’s Roads Service has advised that the sections of safety barrier on the M5 Motorway have been provided in accordance with the standards that were applicable, when the work was originally carried out.

While standards may change periodically, they do not normally apply retrospectively. However, this section of motorway would be assessed again, under the appropriate standards, as part of any future planned work or major maintenance in the immediate vicinity.

Audio-Visual Information on Buses

Mr J Shannon asked the Minister for Regional Development for his assessment of the delay in the pilot of audio-visual information (AV) on buses; if his Department has found the mislaid funding applications and when funding will be made available, in line with the Accessible Transport Strategy, to pilot AV on buses to improve the quality of life of many disabled people.

(AQW 7881/09)

Minister for Regional Development:

There has been no delay in the Department’s consideration of proposals for an audio-visual pilot on buses nor have any applications for funding been mislaid.

The Accessible Transport Strategy Action Plan for 2007-2009 included a measure to "examine the practicalities of introducing audio visual announcements of travel information on buses." This was to be undertaken by DRD and Translink and was achieved with an original business case being submitted in January 2008.

The Accessible Transport Strategy draft Action Plan for 2009-2012 includes two measures relating to audio visual systems on buses. The first is that Translink would, by April 2009 "submit a revised business case for the introduction of audio and visual announcements of travel information on buses". The second is that my Department’s Ports and Public Transport Division would "examine the business case of introducing audio visual announcements of travel information on buses" to be completed by September 2009. This Action Plan is presently out for public consultation.

My Department has now received the revised business case from Translink, which officials are considering at the moment. The funding of any pilot to provide audio-visual information on buses will, of course, be dependent on the necessary resources being available at that time.

Audio-Visual Information on Buses

Mr J Shannon asked the Minister for Regional Development if his Department is fully committed to the pilot of audio-visual information on buses as outlined in the Accessible Transport Strategy (ATS); the reasons why the pilot was not undertaken within the ATS 2007 to 2009 workplan; and why his Department appears to have mislaid 3 funding applications submitted by Translink, further delaying the pilot within the ATS 2010 to 2012 workplan.

(AQW 7882/09)

Minister for Regional Development:

There has been no delay in the Department’s consideration of proposals for an audio-visual pilot on buses nor have any applications for funding been mislaid.

The Accessible Transport Strategy Action (ATS) Plan for 2007-2009 included a measure to "examine the practicalities of introducing audio visual announcements of travel information on buses." This was to be undertaken by DRD and Translink and was achieved with an original business case being submitted in January 2008.

The ATS draft Action Plan for 2009-2012 includes two measures relating to audio visual systems on buses. The first is that Translink would, by April 2009 "submit a revised business case for the introduction of audio and visual announcements of travel information on buses". The second is that my Department’s Ports and Public Transport Division would "examine the business case of introducing audio visual announcements of travel information on buses" to be completed by September 2009. This Action Plan is presently out for public consultation.

My Department has now received the revised business case from Translink, which officials are considering at the moment. The funding of any pilot to provide audio-visual information on buses will, of course, be dependent on the necessary resources being available at that time.

Department for Social Development

Housing Benefit Claims in North Down

Mr P Weir asked the Minister for Social Development to detail (i) how many properties in the North Down constituency have been found to be unoccupied and resulted in housing benefit claims being terminated; and (ii) the total number of housing benefit claims that have been terminated as a result of unoccupied properties, since May 2007.

(AQW 7473/09)

Minister for Social Development (Ms M Ritchie): The information is not available on a constituency basis. The North Down Constituency comprises the Bangor District Office along with a small part of Newtownards District.

The Housing Executive completed an exercise during 2008, to identify properties which were suspected of being unoccupied. As a result of this exercise the number of housing benefit claims that were terminated from the Bangor and Newtownards District Offices totalled 22 and the number of properties recovered was 11.

Additionally, the Housing Executive’s local district offices routinely take action where they consider that properties are tenanted, but not being occupied which regularly result in tenancy terminations without the need for court action (irrespective of whether or not housing benefit is payable). There were a further 12 properties recovered in Bangor, and 30 in Newtownards, through recovery action during 2008/09.

Housing Benefit Claims in Coleraine

Mr G Robinson asked the Minister for Social Development (i) how many people are claiming housing benefit in Coleraine; and (ii) how this compares with a year ago.

(AQW 7490/09)

Minister for Social Development: The number of people claiming Housing Benefit in Coleraine as at 1 April 2009 was 4,594. The number claiming as at 1 April 2008 was 4,253.

Neighbourhood Renewal

Ms C Ní Chuilín asked the Minister for Social Development (i) when the last inter-departmental meeting on neighbourhood renewal was; and (ii) when the next meeting is scheduled.

(AQW 7525/09)

Minister for Social Development: (i) The last meeting of the inter-departmental Ministerial Group on Neighbourhood Renewal was held on 13 May 2009. (ii) The next meeting will take place in the autumn.

Urban Renewal Area Status

Ms C Ní Chuilín asked the Minister for Social Development when she will make a decision on the urban renewal area status for deprived areas of north Belfast.

(AQW 7533/09)

Minister for Social Development: There are currently a number of proposals with my Department for regeneration activity across 15 different communities, including several in North Belfast.

Once the Department and the Housing Executive has identified the most appropriate approach to meeting this housing need, I will ensure the members who represent those constituencies are notified.

Housing Benefits

Mr J Shannon asked the Minister for Social Development how many applications for Housing Benefit have been lodged with Ards Housing Executive in each of the last 12 months.

(AQW 7569/09)

Minister for Social Development: The number of Housing Benefit applications received by the Housing Executive’s Housing Benefit Service Unit in Newtownards between April 2008 and March 2009 is broken down as follows:

April 2008 459 applications were received
May 2008 526
June 2008 601
July 2008 459
August 2008 490
September 2008 579
October 2008 654
November 2008 600
December 2008 396
January 2009 593
February 2009 784
March 2009 789
Total 6930

Housing Benefit Applications

Mr J Shannon asked the Minister for Social Development how long the Housing Executive in Ards took to process Housing Benefit applications in each of the last 12 months.

(AQW 7570/09)

Minister for Social Development: The Housing Executive’s target is to assess 90% of Housing Benefit claims within 14 days of receiving all of the necessary supporting documentation.  The following information details performance against that target by the Housing Executive’s Housing Benefit Service Unit in Newtownards for each month between April 2008 and March 2009 -

Housing Benefit

  Month Applications cleared within 14 days of receiving all necessary supporting documentation
2008 April 78.89%
  May 71.54%
  June 75.28%
  July 71.24%
  August 78.27%
  September 67.04%
  October 75.98%
  November 60.96%
  December 55.18%
     
2009 January 52.21%
  February 64.42%
  March 63.76%
     
  Total 68%

These performance figures reflect the significant recent increase in the level of housing benefit claims received by the Housing Executive.

Income Support Claims

Mr P Weir asked the Minister for Social Development how many fresh Income Support claims were received in the Bangor Social Security office in (i) 2007/08; and (ii) 2008/09.

(AQW 7583/09)

Minister for Social Development: The information requested is detailed in the table below.

Financial Year No. of Income Support fresh claims received in Bangor Social Security Office
2007/2008 890
2008/2009 777

This information has been extracted from Social Security Agency internal monitoring systems.

Housing in West Green, Holywood

Mr P Weir asked the Minister for Social Development when her Department will make a decision on the future of housing in West Green in Holywood.

(AQW 7588/09)

Minister for Social Development: The Housing Executive is currently preparing an economic appraisal outlining options for the West Green area of Holywood.

These are expected to be submitted for approval in late summer 2009 and thereafter delivery of the proposed works will be dependent on the availability of resources at that time.

Armagh Neighbourhood Renewal Partnership Board

Mr M Brady asked the Minister for Social Development if her Department's officials and the Armagh Neighbourhood Renewal Partnership Board are in contravention of their own guidelines by continuing to hold meetings and make decisions without community representation at board meetings.

(AQW 7631/09)

Minister for Social Development: No meetings have been held or decisions taken by the Armagh Neighbourhood Renewal Partnership Board without a community representative being present.

Armagh Neighbourhood Renewal Partnership Board

Mr M Brady asked the Minister for Social Development if she can ensure that the action plan agreed by the Armagh Neighbourhood Renewal Partnership Board, with community input, will be delivered in full.

(AQW 7633/09)

Minister for Social Development: Officials from my department have been engaging with all the relevant parties to ensure that the action plan agreed by the Armagh Neighbourhood Renewal Partnership Board will be delivered to the fullest extent possible.

Armagh Neighbourhood Renewal Partnership Board

Mr M Brady asked the Minister for Social Development to investigate how decisions taken by the Armagh Neighbourhood Renewal Partnership Board can be over -ruled or changed by her Department's officials, leading to community representatives losing confidence in the Board and believing they are not equal partners.

(AQW 7635/09)

Minister for Social Development: The Department has produced guidelines on the role of Neighbourhood Renewal Partnerships. Partnerships are advisory bodies whose role is to focus on identifying local priorities and work to influence and contribute to the determining of Government spending priorities for their neighbourhoods. I am satisfied that my officials have acted in accordance with these guidelines in its engagements with the Armagh Neighbourhood Renewal Partnership Board.

Bonfires in East Antrim

Mr D Hilditch asked the Minister for Social Development to detail the total expenditure in 2008 resulting from bonfires in the East Antrim area.

(AQW 7639/09)

Minister for Social Development: The clean-up costs associated with bonfires for the Housing Executive’s Carrickfergus, Larne and Newtownabbey 1 District Office areas (which comprise the East Antrim parliamentary constituency) for 2008 are detailed in the table below.

District office

Clean-up costs

   

Carrickfergus

£3,410

Larne

£100

Newtownabbey 1

£5,048

   

Total

£8,558

Bonfires in East Antrim

Mr D Hilditch asked the Minister for Social Development to detail the estimated costs of the July bonfires in the East Antrim area for 2009.

(AQW 7640/09)

Minister for Social Development: The Housing Executive no longer provides funding for bonfire initiatives. The Office of the First Minister and deputy First Minister has agreed to directly support those Council bonfire initiatives which had previously been funded by the Housing Executive, as well as all new requests for financial support for such projects in the coming year.

Strategic Review Plan for Social Security Offices

Mr A McQuillan asked the Minister for Social Development for an update on the Strategic Review Plan for Social Security Offices in (i) Coleraine; (ii) Ballymoney; and (iii) Limavady.

(AQW 7642/09)

Minister for Social Development: The current Strategic Business Review proposals covering the SSA local operations network which includes the Jobs & Benefits offices in Coleraine, Ballymoney and Limavady are set out in the Equality Impact Assessment document. This was issued for public consultation on 23 April 2009 with comments due by 17 June 2009. Decisions will not be made on any of the proposals until public consultation is complete and the responses assessed.

Social Housing Projects

Ms A Lo asked the Minister for Social Development when the annual list of social housing projects receiving funding will be published.

(AQW 7687/09)

Minister for Social Development: The Northern Ireland Housing Executive is still finalising the Social Housing Development

Programme. They expect to submit it to me in the coming weeks and when approved will be published on www.nihe.gov.uk. I will also place a copy in the Assembly Library.

Departmental Land

Dr A McDonnell asked the Minister for Social Development if, in light of the current economic crisis and with rising fuel and food prices, he has any plans to release departmental land for the use of local communities to grow affordable food and make local food more sustainable.

(AQW 7705/09)

Minister for Social Development: My Department currently has no plans to release departmental land. However, I have recently provided £19,000 for a community based project to help re-establish allotments on Northern Ireland Housing Executive land in the Enniskillen Neighbourhood Renewal Area.

Social Housing

Mr M Brady asked the Minister for Social Development how many social houses have been bought 'off the shelf' since she came into office.

(AQW 7708/09)

Minister for Social Development: 270 units were purchased on an ‘off the shelf’ basis in 2007/08 and a further 299 in 2008/09.

Disability Living Allowance

Mr T Elliott asked the Minister for Social Development to detail (i) the total number; and (ii) the percentage of the population in, receipt of Disability Living Allowance, in each electoral ward.

(AQW 7710/09)

Minister for Social Development: The table below sets out the information requested for part (i) The number of people in receipt of Disability Living Allowance by electoral ward area. The figures given reflect the number of Disability Living Allowance recipients at the date of extract which is 21st March 2009.

(ii) The percentage of the population in receipt of Disability Living Allowance is not available as population figures are not held at ward level.

DLA Recipients split by Ward (March 2009)
WARD Frequency WARD Frequency
ABBEY 244 GLEN ROAD 1016
ABBEY PARK 304 GLENAAN 105
ACADEMY 131 GLENARIFF 137
AGHAGALLON 358 GLENARM 93
AGHANLOO 313 GLENAVY 349
AGIVEY 143 GLENCAIRN 627
AHOGHILL 244 GLENCOLIN 1286
ALDERGROVE 305 GLENDERG 412
ALTMORE 276 GLENDUN 78
ALTNAGELVIN 507 GLENGORMLEY 275
ANDERSONSTOWN 953 GLENRAVEL 173
ANNAGH 294 GLENSHESK 47
ANNALONG 308 GLENTAISIE 165
ANTIVILLE 160 GLENWHIRRY 156
ARDBOE 377 GLYNN 122
ARDEEVIN 141 GORTALEE 167
ARDGLASS 394 GORTALOWRY 288
ARDOYNE 1260 GORTIN 216
ARMOY 91 GORTRUSH 469
ARTIGARVAN 305 GRAHAMS BRIDGE 310
ATLANTIC 165 GRANGE 167
AUDLEYS ACRE 252 GRANSHA 204
AUGHER 139 GREENISLAND 178
AUGHNACLOY 242 GREGSTOWN 317
BALLEE 251 GRESTEEL 295
BALLINAMALLARD 206 GREYSTONE (ANTRIM) 243
BALLINDERRY 270 GREYSTONE (LIMAVADY) 241
BALLOO 213 GROOMSPORT 180
BALLYBAY 295 GULLADUFF 196
BALLYBOT 420 HAMILTONSBAWN 215
BALLYCARRY 124 HARBOUR (LARNE) 142
BALLYCLARE NORTH 264 HARBOUR (NORTH DOWN) 176
BALLYCLARE SOUTH 286 HARMONY HILL 195
BALLYCOLMAN 350 HARRYVILLE 206
BALLYCRAIGY 245 HAWTHORNE 269
BALLYCROCHAN 294 HIGHFIELD 766
BALLYDOWN 283 HIGHTOWN 225
BALLYDUFF 271 HILDEN 326
BALLYGAWLEY 298 HILLFOOT 133
BALLYGOWAN 203 HILLHALL 317
BALLYHACKAMORE 348 HILLSBOROUGH 163
BALLYHANWOOD 192 HOCKLEY 166
BALLYHENRY 287 HOLLY MOUNT 402
BALLYHOE AND CORKEY 131 HOLYWOOD DEMESNE 174
BALLYHOLME 92 HOLYWOOD PRIORY 124
BALLYKEEL 174 HOPEFIELD 203
BALLYKELLY 161 IRVINESTOWN 316
BALLYLORAN 149 ISLAND 567
BALLYLOUGH 67 ISLAND MAGEE 130
BALLYLOUGHAN 118 JORDANSTOWN 309
BALLYMACARRETT 917 KATESBRIDGE 182
BALLYMACASH 162 KEADY 247
BALLYMACBRENNAN 134 KELLS 251
BALLYMACONNELL 128 KERNAN 416
BALLYMACOSS 508 KESH EDERNEY AND LACK 318
BALLYMAGEE 235 KILFENNAN 286
BALLYMAGLAVE 272 KILKEEL CENTRAL 383
BALLYMAGUIGAN 169 KILKEEL SOUTH 330
BALLYMARTRIM 267 KILLEEN 219
BALLYMOTE 497 KILLINCHY 116
BALLYNAFEIGH 406 KILLOQUIN LOWER 152
BALLYNAHINCH EAST 287 KILLOQUIN UPPER 96
BALLYNASHALLOG 330 KILLOUGH 366
BALLYNURE 154 KILLYCLOGHER 423
BALLYORAN 331 KILLYCOLPY 280
BALLYRAINEY 233 KILLYCOMAIN 249
BALLYROBERT 220 KILLYCROT 338
BALLYSAGGART 329 KILLYLEA 220
BALLYSALLY 251 KILLYLEAGH 267
BALLYSILLAN 683 KILLYMAN 231
BALLYWALTER 333 KILLYMEAL 219
BALLYWARD 185 KILLYMOON 289
BANAGHER 233 KILMORE 184
BANBRIDGE WEST 314 KILREA 217
BANGOR CASTLE 237 KILWAUGHTER 255
BANNSIDE 176 KILWEE 586
BEECHILL 403 KINBANE 55
BEECHMOUNT 1010 KIRCUBBIN 329
BEECHWOOD 458 KNOCK 384
BELCOO AND GARRISON 167 KNOCKAGH 118
BELLAGHY 191 KNOCKAHOLET 101
BELLEEK AND BOA 213 KNOCKBRACKEN 159
BELLEVUE 492 KNOCKCLOGHRIM 174
BELMONT 479 KNOCKLAYD 195
BENBURB 210 KNOCKLYNN 201
BENVARDIN 163 KNOCKMORE 375
BERAGH 291 KNOCKNASHANE 273
BESSBROOK 357 LADYBROOK 1067
BINNIAN 278 LAGAN VALLEY 336
BLACKCAVE 157 LAMBEG 255
BLACKHEAD 158 LAURELVALE 221
BLACKSTAFF 507 LAWRENCETOWN 281
BLARIS 210 LECUMPHER 197
BLEARY 329 LEGONIEL 862
BLOOMFIELD (BELFAST) 582 LISANELLY 400
BLOOMFIELD (NORTH DOWN) 337 LISBANE 108
BLUEFIELD 164 LISBELLAW 176
BOHO CLEENISH AND LETTERBREEN 178 LISNACREE 286
BONAMARGY AND RATHLIN 75 LISNAGARVY 228
BONEYBEFORE 123 LISNAGELVIN 459
BOTANIC 566 LISNARRICK 138
BRADSHAWS BRAE 220 LISNASHARRAGH 225
BRANDYWELL 549 LISNASKEA 330
BROADWAY 140 LISSAN 181
BROOKEBOROUGH 163 LOUGHBRICKLAND 262
BROUGHSHANE 190 LOUGHGALL 262
BROWNSTOWN 336 LOUGHRIES 236
BRYANSBURN 123 LOUGHVIEW 237
BURLEIGH HILL 255 LOVE LANE 177
BURNTHILL 194 LOWER BRANIEL 229
BURREN AND KILBRONEY 266 LOWER GLENSHANE 189
BUSHMILLS 65 MACOSQUIN 150
CAIRNSHILL 176 MAGHABERRY 286
CALEDON 206 MAGHERA 269
CALLAN BRIDGE 343 MAGHERALAVE 182
CAMLOUGH 369 MAGHERALIN 336
CAMOWEN 365 MAGILLIGAN 185
CARN HILL 505 MAGUIRESBRIDGE 199
CARNANY 207 MALLUSK 354
CARNCASTLE 165 MALONE 205
CARNLOUGH 173 MARKETHILL 303
CARNMONEY 257 MASSEREENE 353
CARNMOON 93 MAYOBRIDGE 275
CARRIGATUKE 225 MAZE 212
CARROWDORE 256 MILEBUSH 138
CARROWREAGH 368 MILFORD 203
CARRYDUFF EAST 252 MILLISLE 333
CARRYDUFF WEST 179 MINNOWBURN 319
CASTLE DEMESNE 216 MOAT 218
CASTLECAULFIELD 250 MOIRA 275
CASTLECOOLE 343 MONEYMORE 239
CASTLEDAWSON 247 MONEYREAGH 222
CASTLEDERG 460 MONKSTOWN 395
CASTLEROCK 171 MOSS-SIDE AND MOYARGET 78
CASTLEVIEW 504 MOSSLEY 327
CASTLEWELLAN 357 MOUNT SANDEL 114
CATHEDRAL 482 MOURNEVIEW 337
CAVEHILL 296 MOVILLA 264
CAW 381 MOY 213
CENTRAL (ARDS) 362 MOYGASHEL 212
CENTRAL (COLERAINE) 218 MULLAGHMORE 322
CENTRAL (LARNE) 194 MURLOUGH 336
CHARLEMONT 252 MUSGRAVE 454
CHERRYVALLEY 339 NEW BUILDINGS 356
CHICHESTER PARK 606 NEW LODGE 1255
CHURCH 296 NEWBUILDINGS 238
CHURCHILL 187 NEWHILL 303
CHURCHLAND 287 NEWTOWNBREDA 151
CLADY 147 NEWTOWNBUTLER 256
CLANABOGAN 296 NEWTOWNHAMILTON 268
CLANDEBOYE 318 NEWTOWNSAVILLE 222
CLARE 371 NEWTOWNSTEWART 303
CLAUDY 346 NORTH 391
CLIFTONVILLE 785 NORTHLAND 205
CLIPPERSTOWN 195 OAKLANDS 167
CLOGH MILLS 127 OBSERVATORY 224
CLOGHER 207 OLD WARREN 340
CLONALLAN 435 OLDTOWN 323
CLONARD 975 ORANGEFIELD 382
CLONDERMOT 470 OWENKILLEW 240
CLOUGHFERN 306 PARK 101
COAGH 249 PARKGATE 128
COALISLAND NORTH 495 PARKLAKE 392
COALISLAND SOUTH 432 PENNYBURN 268
COALISLAND WEST AND NEWMILLS 280 PLUMBRIDGE 221
COLLIN GLEN 1136 POLEGLASS 581
COLLINBRIDGE 223 POMEROY 264
COMBER EAST 264 PORTAFERRY 457
COMBER NORTH 230 PORTAVOGIE 561
COMBER WEST 145 PORTGLENONE 219
CONLIG 506 PORTORA 346
COOLE 333 PORTSTEWART 150
COOLESSAN 227 POYNTZ PASS 239
COOLHILL 211 PRINCETOWN 150
COOLNAGARD 489 QUILLY 153
CORCRAIN 415 QUOILE 281
COURT 637 RANDALSTOWN 243
CRAIGAVAD 124 RATHBRADY 149
CRAIGY HILL 225 RATHFRILAND 284
CRAIGYWARREN 108 RATHGAEL 137
CRANFIELD 189 RAVENHILL 334
CRAWFORDSBURN 95 RICH HILL 212
CREGAGH 262 RINGSEND 159
CREGGAN 348 ROESIDE 193
CREGGAN CENTRAL 529 ROSEMOUNT 375
CREGGAN SOUTH 451 ROSETTA 372
CREVAGH 793 ROSSLEA 171
CROSS GLEBE 274 ROSSORRY 244
CROSSGAR 200 ROSTREVOR 233
CROSSMAGLEN 412 ROSTULLA 200
CRUMLIN (ANTRIM) 369 ROUTE 214
CRUMLIN (BELFAST) 1035 ROYAL PORTRUSH 199
CULLYBACKEY 219 SAINTFIELD 181
CULMORE 999 SANDHOLES 180
CULTRA 65 SCRABO 290
DAISY HILL 524 SEACON 213
DALRIADA 113 SEAFORDE 272
DEMESNE 246 SEAPATRICK 220
DERGMONEY 297 SEAVIEW 324
DERRYAGHY 809 SEYMOUR HILL 248
DERRYBOY 168 SHAFTESBURY 1214
DERRYGONNELLY 190 SHANKILL 863
DERRYLECKAGH 371 SHANTALLOW EAST 510
DERRYLIN 128 SHANTALLOW WEST 914
DERRYMORE 398 SHILVODAN 159
DERRYNOOSE 285 SHIMNA 292
DERRYTRASNA 455 SILVER BRIDGE 329
DERVOCK 133 SILVERSTREAM 220
DEVENISH 271 SION MILLS 398
DOAGH 155 SIXMILECROSS 266
DONAGH 188 SLEMISH 91
DONAGHADEE NORTH 207 SLIEVEKIRK 252
DONAGHADEE SOUTH 309 SOUTH 400
DONAGHCLONEY 197 SPELGA 324
DONAGHMORE (DUNGANNON) 221 SPRING HILL 189
DONAGHMORE (NEWRY AND MOURNE) 281 SPRINGFARM 305
DONARD 301 SPRINGTOWN 452
DOWNS 348 ST MARYS 338
DOWNSHIRE 202 ST PATRICKS 425
DRAPERSTOWN 263 STEEPLE 226
DROMARA 252 STEWARTSTOWN 291
DROMORE 350 STILES 236
DROMORE NORTH 211 STORMONT 222
DROMORE SOUTH 264 STRAND (COLERAINE) 77
DRUMALANE 396 STRAND (DERRY) 543
DRUMANAWAY 135 STRANGFORD 241
DRUMANESS 359 STRANMILLIS 158
DRUMBO 120 STRANOCUM 124
DRUMGASK 624 STRULE 271
DRUMGLASS 303 SUMMERFIELD 184
DRUMGOR 447 SUNNYLANDS 239
DRUMGULLION 451 SWATRAGH 205
DRUMNAKILLY 344 SYDENHAM 534
DRUMNAMOE 584 TAGHNEVAN 480
DRUMQUIN 268 TANDRAGEE 237
DRUMRAGH 352 TAVANAGH 313
DUFFERIN 286 TEMPLEPATRICK 109
DUNANNEY 335 TEMPO 191
DUNCAIRN 774 TERMON 355
DUNCLUG 194 THE BIRCHES 255
DUNDONALD 180 THE CUT 267
DUNDOOAN 158 THE CUTS 274
DUNDRUM 263 THE DIAMOND 417
DUNGIVEN 209 THE HIGHLANDS 161
DUNLOY 148 THE LOOP 221
DUNLUCE 105 THE MALL 182
DUNMINNING 149 THE MOUNT 805
DUNMORE 221 THE VOW 139
DUNMURRY 313 TOBERMORE 212
DUNNAMANAGH 272 TOLLYMORE 335
DUNNAMORE 240 TONAGH 313
DUNSEVERICK 57 TOOME 218
EAST 406 TOWN PARKS 144
EBRINGTON 327 TOWN PARKS EAST 284
EDEN 298 TOWN PARKS WEST 181
EDENDERRY (BANBRIDGE) 361 TRILLICK 193
EDENDERRY (CRAIGAVON) 319 TULLAGH 265
EGLINTON 336 TULLYCARNET 295
ENAGH (DERRY) 463 TULLYHAPPY 221
ENAGH (LIMAVADY) 272 TWINBROOK 616
ENLER 345 UNIVERSITY 240
ERNE 344 UPPER BRANIEL 183
FAIR GREEN 163 UPPER GLENSHANE 179
FAIRHILL 214 UPPER MALONE 414
FAIRY WATER 201 UPPER SPRINGFIELD 1261
FALLS 1254 UPPERLANDS 217
FALLS PARK 889 VALLEY (MAGHERAFELT) 182
FARRANSHANE 242 VALLEY (NEWTOWNABBEY) 389
FATHOM 311 VICTORIA (CARRICKFERGUS) 224
FEENY 174 VICTORIA (DERRY) 362
FINAGHY 294 VICTORIA BRIDGE 299
FINN 366 WALLACE PARK 132
FINTONA 314 WARINGSTOWN 234
FIVEMILETOWN 185 WASHING BAY 329
FLORENCECOURT AND KINAWLEY 162 WATER WORKS 1014
FOREST 204 WATERSIDE 115
FORKHILL 349 WEST 444
FORT 262 WESTLAND 410
FORTWILLIAM 458 WHITEHEAD 111
FOUNTAIN HILL 232 WHITEHILL 245
FOYLE SPRINGS 468 WHITEHOUSE 327
GALGORM 147 WHITEROCK 1441
GALWALLY 131 WHITESPOTS 164
GARDENMORE 168 WINDSOR 359
GARVAGH 189 WINDSOR HILL 314
GILFORD 286 WOODBURN 165
GILNAHIRK 118 WOODSTOCK 695
GLACK 191 WOODVALE 788
GLEBE (BALLYMONEY) 145 WOODVILLE 428
GLEBE (MAGHERAFELT) 273 WYNCHURCH 171
GLEBE (NEWTOWNABBEY) 256 Not Recorded 1109
GLEN 212 Total 176847

In producing this analysis individual benefit records were attributed to Electoral Wards on the basis of their postcode. Not all records can be correctly allocated to a ward using this method, and some cannot be allocated at all.

Environmental Improvement Schemes

Mr A Maskey asked the Minister for Social Development pursuant to AQW 7442/09, to detail the cost for the completion of Phase One of the Environmental Improvement Schemes in the Market area, South Belfast.

(AQW 7727/09)

Minister for Social Development: The final value of Phase One was £165,241.

Environmental Improvement Schemes

Mr A Maskey asked the Minister for Social Development pursuant to AQW 7442/09, to detail the cost for the completion of Phase Two of the Environmental Improvement Schemes in the Market area, South Belfast.

(AQW 7728/09)

Minister for Social Development: The final value of Phase Two was £384,820.

Social Housing

Mr W Irwin asked the Minister for Social Development, for each of the last two years, the number of properties her Department has purchased for social housing in the Newry and Armagh constituency; and how many of those are occupied.

(AQW 7735/09)

Minister for Social Development: The number of properties purchased for social housing in the Newry and Armagh constituency in each of the last two years is as follows:-

- 2007/08 34

- 2008/09 70

Of the 104 properties purchased, 79 are occupied. The other 25 are not occupied because the schemes are not completed.

Warm Homes Scheme

Mr M Brady asked the Minister for Social Development when the Warm Homes Scheme will be resumed; and to give an assurance that people already on the waiting list will be dealt with.

(AQW 7738/09)

Minister for Social Development: The Northern Ireland Housing Executive expects to award the Warm Homes Scheme contract on 26 May 2009 and I would expect the scheme to be operational at the earliest opportunity.

Applicants who had expressed an interest in receiving assistance for insulation measures should receive assistance once the scheme is operational.

My officials have been working with Eaga and identified those people on the waiting list whose heating systems have broken down beyond repair and I am pleased to confirm that all of these households will have heating measures installed by the end of May. The remaining applicants have functioning heating systems and although some of these systems may be inefficient, they are still working. If these people believe they meet the new criteria they will be welcome to apply to the new scheme when it opens for applications.

Northern Ireland Assembly Commission

Lord and Lady Craigavon's Portland Stone Sarcophagus

Mr T Elliott asked the Assembly Commission if it will consider cleaning Lord and Lady Craigavon's Portland stone sarcophagus, so that the writing can be restored.

(AQW 7711/09)

The Representative of the Assembly Commission (Mr S Neeson): The Assembly Commission is keen to ensure that Parliament Buildings and its environs are always kept properly maintained.

Properties Directorate are currently giving consideration to carrying out specialist stone cleaning in several areas and this will be extended to include Lord and Lady Craigavon’s Portland stone sarcophagus.

Portland stone is quite a soft stone and there is some evidence of damage to the inscription on the sarcophagus. Further consultation will be necessary with stone conservation specialists, staff from the Department of Finance and Personnel’s Properties Division and the Northern Ireland Environment Agency to agree an effective cleaning regime that does not risk causing further damage.